What it approves
Installation of standard windshear systems.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
FAA Form 8110-2 (5/14) Page 1 of 3 Number: SA4817NM This certificate issued to: Honeywell International Inc.
21111 N 19th Ave Phoenix, Arizona 85027 CAR 4b of the Civil Air Regulations.
Make: McDonnell Douglas A6WE Model: DC-9, -11, -12, -13, -14, -15, -15F, -21, -31, -32, -32F, -33, -34, -34F, -41, -51 Description of Type Design Change:
Requirements for the installation of Honeywell Standard Windshear Systems are contained in Honeywell Master Data List Number ML4070211, Revision “L”, or later FAA approved revision. To determine which configurations(s) of the Standard Windshear System have been approved, including the required FAA approved Airplane Flight Manual Supplement, if applicable, refer to appropriate appendices in the approved Master Data List.
This approval should not be incorporated in any aircraft unless it is determined that the interrelationship between this change and any of those other previously approved modifications will not introduce any adverse effect upon the airworthiness of the aircraft. If the holder agrees to permit another person to use this certificate to alter the product, the holder shall give the other person written evidence of that permission. Refer to the appropriate appendices in the FAA approved Master Data List for any other limitations.
Date of Application: June 13, 1989 Date Reissued: February 27,2009; March 19, 2020 Date of Issuance: December 1, 1989 Date Amended: April 23, 1991 By Direction of the Administrator Signature Richard B. Sleigh Title ODA Administrator, ODA-602216-NM
FAA Form 8110-2 (5/14) Page 2 of 3
To (Name and address of transferee) From (Name and address of grantor) Extent of Authority (if licensing agreement):
United States of America Department of Transportation Federal Aviation Administration Supplemental Type Certificate (Continuation Sheet) Number: SA4817NM
FAA Form 8110-2 (5/14) Page 3 of 3 Limitations and Conditions: (continued) The area modified for the installation of the Angle of Attack vane must be inspected at specified intervals in accordance with Attachment 3 of the engineering order, Installation – Windshear Angle-of-Attack Sensor, DC9-10 RH Side, Gima & Associates Inc.
Engineering Order No. 55-5001, Revision E, or later FAA approved revisions. Any structure found cracked during these inspections must be repaired before further flight in a manner approved by the FAA Manager, Wichita Aircraft Certification Office.
Report all positive inspection findings to the STC holder for corrective action.
---------------------------------------------------------------------------END--------------------------------------------------------------------------
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 15
| Make | Model | Data sheet |
|---|---|---|
| McDonnell Douglas Corporation | DC-9-11 | A6WE |
| McDonnell Douglas Corporation | DC-9-12 | A6WE |
| McDonnell Douglas Corporation | DC-9-13 | A6WE |
| McDonnell Douglas Corporation | DC-9-14 | A6WE |
| McDonnell Douglas Corporation | DC-9-15 | A6WE |
| McDonnell Douglas Corporation | DC-9-15F | A6WE |
| McDonnell Douglas Corporation | DC-9-21 | A6WE |
| McDonnell Douglas Corporation | DC-9-31 | A6WE |
| McDonnell Douglas Corporation | DC-9-32 | A6WE |
| McDonnell Douglas Corporation | DC-9-32F | A6WE |
| McDonnell Douglas Corporation | DC-9-33F | A6WE |
| McDonnell Douglas Corporation | DC-9-34 | A6WE |
| McDonnell Douglas Corporation | DC-9-34F | A6WE |
| McDonnell Douglas Corporation | DC-9-41 | A6WE |
| McDonnell Douglas Corporation | DC-9-51 | A6WE |
Every issue · 2
DRS keeps each issue of an STC as its own record, with its own certificate and attachments.
| Date | Status | Files |
|---|---|---|
| March 19, 2020 | Reissued, current | Certificate |
| February 27, 2009 | Reissued, earlier issue | Certificate |