What it approves
Installation of dual Marathon TSP-280 nickel cadmium batteries.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
*sl£G4&cti£i& tinted £tatts of aracrica Bepartment ofCransportation—jptdtral dotation administration topplemental 'Cgpe Certificate *Sbumve<r' SA7831SW Marathon Power Technologies Company 8301 Imperial Drive Waco, Texas 76712-6588 ,<^^/i^j4l<j^^ 23 Federal Aviation A16EU Cornier 228-100, -101, -200, -201, -202.
Installation of dual Marathon TSP-280 Nickel Cadmium batteries in a Dornier 228 aircraft, in accordance with Marathon Power Technologies drawing 31823-001 revision B, dated May 23, 1989, or latter FAA approved revision.
Compatibility of this modification with previously installed equipment must be determined by installer.
^»'77M^^ aA^: November 28, 1988 June 7, 1990 : 5/19/94 _/ ti'n 4j &i£< S'i {/ . .(Signature) Mark R. Schilling, Manager Special Certification Office (Title)
This certificate may be transferred in accordance with F'AR 21.17.
FAAFOKM 81 10-2(10-68)
to (Name of transferee) (Address of transferee) (Number and street) (City, State, and ^IP code) from (Name of grantor) (Print or type) .
(Address of grantor) {Number and street) I (jtr. Sla/e. and ^IP code) Extent of Authority (if licensing agreement): _ Date of Transfer:.
Signature of grantor (In ink):
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.