What it approves
Replace the Cameron Balloons US burner with Thunder and Colt Stratus triple burner installed via the standard burner frame gimbal block.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
Part 31 of the Federal Aviation Regulations. (See Type Certificate Data Sheet No. B2GL for complete certification basis)
Replace the Cameron Balloons US burner with Thunder and Colt Stratus triple burner installed via the standard burner frame gimbal block.
1. FAA Approved Balloon Flight Manual Supplement, dated February 7, 2012, or later FAA approved revisions required.
2. You cannot use descriptive data about this design change to duplicate other products. This approval is limited to only the installation made in Cameron Balloons Model O-105, S/N 6168, only. This STC does not permit manufacturing of parts for multiple installations
Cameron Balloons U.S.
7399 Newman Blvd.
Dexter, MI 48130 B2GL Make : Cameron Balloons U.S.
Model : A-250, S/N 6647
Date of application, November 3, 2011
Date of issuance : February 14, 2012
Original Signed By:
Karol Mordasiewicz ( Signature) Karol Mordasiewicz Airframe & Administrative Branch Chicago Aircraft Certification Office
( Title)
FAA FORM 8110-2-1(10-69) PAGE 2 of 2 PAGES
Number
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 1
| Make | Model | Data sheet |
|---|---|---|
| Cameron Balloons US | A-250 | B2GL |