What it approves
Installation of a Tech Tools 369/500 bubble window in accordance with Brim Aviation Master Drawing List number BR600-010, revision NC, dated June 1, 2009, or later FAA-approved revision. This modification must be maintained in accordance with Brim Aviation Instructions for Continued Airworthiness number BR600-008, revision N/C, dated June 17, 2009, or later FAA-accepted revision.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
Number SR02008SE
This certificate, issued to Brim Aviation 455 Dead Indian Memorial Road Ashland, OR 97520
Part 27 of the Federal Aviation Regulations.
Original ProductType Certificate Number: H3WE Make: MD Helicopter Inc.
Model: 600N, Serial Number RN028 only
Description of the Type Design Change: Installation of a Tech Tools 369/500 bubble window in accordance with Brim Aviation Master Drawing List number BR600-010, revision NC, dated June 1, 2009, or later FAA-approved revision.
This modification must be maintained in accordance with Brim Aviation Instructions for Continued Airworthiness number BR600-008, revision N/C, dated June 17, 2009, or later FAA-accepted revision.
Limitations and Conditions: Data pertaining to this modification are considered inadequate for duplication in other aircraft. This approval for a change in type design is limited to MD 600N, serial number RN028 only. This approval should not be extended to this rotorcraft in which other previously approved modifications are incorporated unless it is determined by the installer that the relationship between this change and any of the other previously approved modifications, including changes in type design, will introduce no adverse effect upon the airworthiness of this rotorcraft.
The modified rotorcraft must be operated in accordance with the FAA-approved Rotorcraft Flight Manual Supplement (RFMS), Brim Aviation document number BR600-007, Revision N/C, signed June 17, 2009, or later FAA-approved revision. A copy of this Certificate, the FAA-approved RFMS, and the Instructions for Continued Airworthiness must be maintained as part of the permanent records of the modified rotorcraft.
Date of application: April 14, 2009 Date reissued:
Date of issuance: June 19, 2009 Date amended:
(Signature)
Acting Manager, Seattle Aircraft Certification Office (Title)
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 1
| Make | Model | Data sheet |
|---|---|---|
| MD Helicopter Inc. | 600N | H3WE |