What it approves
Installation of a refuel/defuel power switching system. Installation of this STC is dependent upon a previously FAA-approved installation of an electrical pressure feed-thru or electrical disconnect at approximately fuselage station 521 between STGR23R and STGR24R under right wing root fairing.
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
No AD in this release names this STC
Approved models · 1
| Make | Model | Data sheet |
|---|---|---|
| Bombardier Inc. | BD-700-1A10 | T00003NY |