What it approves
Install main deck cargo handling system.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
Part 25 of the Federal Aviation Regulations. (See Type Certificate Data Sheet Number A23WE for the complete certification basis).
Install main deck cargo handling system in accordance with Drawing List Report Number 705, Revision D, dated September 12, 1995, or later FAA approved revisions.
1) The installer must determine whether this design change is compatible with previously approved modifications.
2) If the holder agrees to permit another person to use this certificate to alter the product, the holder must give the other person written evidence of that permission.
Telair US LLC 500 Gateway Drive Goldsboro, NC 27534 A23WE Make : Lockheed Model : L-1011-385-1 Date of application : January 18, 1995
Date of issuance : September 12, 1995
Date reissued : March 26, 2015
By direction of the Administrator Original Signed By:
Karol Mordasiewicz
(Signature) Karol Mordasiewicz Manager, Airframe & Administrative Branch Chicago Aircraft Certification Office
(Title)
FAA FORM 8110-2-1(10-69) PAGE 2 of 2 PAGES
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 1
| Make | Model | Data sheet |
|---|---|---|
| Lockheed Martin Corporation | L-1011-385-1 | A23WE |