TCDS 2A4

STCs approved under this data sheet · 440

Current certificates first, most recently changed first.

Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date
  FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s
  WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE tcds_number = '2A4')
  ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

STC SA29SWAuxiliary outboard fuel tank.AAR Oklahoma IncSTC SA01078SEInstallation of externally mounted fuel pump manufactured in accordance with Master Drawing List AEA105-90, Revision A, dated April 5, 2002, or later FAA approved revision, and installed in accordance with Installation Instructions VT-AEA105-12, Revision IR, dated April 5, 2002, or later FAA approved revision. Maintain in accordance with Instructions for Continued Airworthiness AEA-105-13, Revision IR, dated April 5, 2002, or later FAA approved revision.Aero Air, LLCSTC SA155RMInstallation of Singer SKK-1000 doppler navigation system, SKQ-601 dead reckoning computer, and Sperry C-12 compass system.Learjet IncSTC SA01005SEInstallation of replacement door hinges and support hardware.Aero Air IncSTC SA1475SWInstallation of taxi lights.Gulfstream Aerospace CorporationSTC SA1705SWInstallation of freon air conditioning system.Gulfstream Aerospace CorporationSTC SA1815SWInstallation of AiResearch TPE331-1-151 engine.Gulfstream Aerospace CorporationSTC SA74GLInstall wing tip recognition lights.Signature Flight Support CorporationSTC SA1440SWSeparation of hydraulic pump seal drain from engine drain manifold.Signature Flight Support CorporationSTC SA1457SWModification of pressurization and air conditioning system.Signature Flight Support CorporationSTC SA1606SWInstallation of Microcom battery temperature indicator system and battery isolation system.Signature Flight Support CorporationSTC SA1730SWInstallation of aileron trim tab.Signature Flight Support CorporationSTC SA1926SWInstallation of Fuel purge system.Signature Flight Support CorporationSTC SA1962SWInstallation of generator overvoltage/over-current protection.Signature Flight Support CorporationSTC SA2-22Install 2 each 3/8 O.D. lines from LH nacelle to RH firewall.Signature Flight Support CorporationSTC SA2-26Installed 3/8 O.D. line from RH propeller governor pad on RH engine to LH propeller pad on LH engine.Signature Flight Support CorporationSTC SA2-67Install Eclipse Pioneer fuel flow indicating system.Signature Flight Support CorporationSTC SA2-75Revised and installed new electrical components.Signature Flight Support CorporationSTC SA2282SWInstallation of auxiliary battery in aft cabin with rerouting of control system cables.Signature Flight Support CorporationSTC SA2415SWModifications: cargo and baggage door installations, cockpit crew door, revised air conditioning and oxygen systemsSignature Flight Support CorporationSTC SA2439SWInstallation of 690B dorsal fin and tailcone assembly.Signature Flight Support CorporationSTC SA454SWInstallation of windshield alcohol system.Signature Flight Support CorporationSTC SA966SWRerouting powerplant and aileron control cables in baggage area.Signature Flight Support CorporationSTC SA00804SEInstallation of an engine failure indicator system, also referred to as a 'low Thrust Detector system.'Advanced Aero Safety Inc.STC SA71GLInstallation of air filtersBrackett Aero Filters Inc.STC SA1017EAInstallation of vertical tail floodlightsDeVore Aviation Corporation of America, a New Mexico CorporationSTC SA00534SEReplacement of certain BF Goodrich pneumatic deicer bootsSMR TechnologiesSTC SA1876SWInstallation of Collins Radio AP-106 autopilot and manual electric trim.Rockwell Collins IncSTC SA2-884Installation of Collins AP-102 autopilot.Rockwell Collins IncSTC SA473SWInstallation of Collins AP-103E/FD-108 automatic flight control system.Rockwell Collins IncSTC SA684SWInstalation of Collins AP-103F/FD-108 automatic flight control system.Rockwell Collins IncSTC SA798SWRadome nose extension.Metzger James RSTC SE01840ATInstallation of Naceele Mounted Recognition Lights.Aircenter, IncSTC SA4-1442Installation of collins AF-102 Autopilot.Collins Aviation ServiceSTC SA00354ATInstallation of Garrett TPE331-5-511 engines.National Flight Services, IncSTC SA09013AC-DInstallation of S-TEC System 65 two axis automatic flight guidance system, Model ST-590.S-TEC CorporationSTC SA1359GLInstall winglet wingtips.Commander Aero IncSTC SA1381GLReplace standard wing tip assembly with winglet tip assembly.Commander Aero, IncSTC SA1565GLInstallation of flap gap wing fairings.Commander Aero, IncSTC ST00854LAInstallation of Airshow P/N 110005 in-flight entertainment system.Airshow IncSTC SA01102CHInstallation of AlliedSignal, Inc. TPE331-5-251K Model Engines.National Flight Services, IncSTC SA00849ATInstallation of a Bendix/King EFIS.Garrett Aviation ServicesSTC SA00105SEModify Flap Pulleys.Commander Aero IncSTC SA3861NMInstallation of two Hartzell HC-B3TN-5FL/LT10876ANSB-2Q propellers on the above Twin Commander airplanes equipped with two AiResearch Model TPE331-5-24K or two Model TPE331-10T-511K, -112K, -113K, -515K, -516K engines.Aero Air, LLCSTC SA01444ATInstallation of an Enviro Systems AirConditioner.Aircenter, IncSTC SA09014AC-DInstallation of S-TEC yaw damper system, Model ST-591.S-TEC CorporationSTC SA199SWInstallation of four auxiliary fuel cells in each outer wing panel between stations 127 and 163.AAR Aircraft Services IncSTC SA01820ATInstallation of Exhaust Deflectors.Aircenter, IncSTC SA00884NYInstallation of an Aerosening Terrain Mapping Radar System.Cooper Aerial Surveys, Ltd. Corp.STC SA01787ATInstallation of Brake and Rudder pedal extension.Aircenter, Inc
Back to TCDS 2A4