TCDS A28NM
Airworthiness directives · 663
ADs whose products are models on this data sheet, matched by model and maker. Those in force first, newest first.
Query with SQL
duckdb -csv -c "SELECT d.ad_number, d.status, d.subject, d.effective_date FROM 'https://openairdocs.org/data/latest/faa_directive.parquet' d WHERE d.ad_id IN (SELECT ad_id FROM 'https://openairdocs.org/data/latest/faa_directive_product.parquet' WHERE tcds_number = 'A28NM') ORDER BY d.status = 'Historical', coalesce(d.effective_date, d.publication_date) DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT d.ad_number, d.status, d.subject, d.effective_date FROM 'https://openairdocs.org/data/latest/faa_directive.parquet' d WHERE d.ad_id IN (SELECT ad_id FROM 'https://openairdocs.org/data/latest/faa_directive_product.parquet' WHERE tcds_number = 'A28NM') ORDER BY d.status = 'Historical', coalesce(d.effective_date, d.publication_date) DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
AD 2026-17-01FuselageAD 2026-17-04Landing GearAD 2026-18-03WingsAD 2026-15-13PneumaticAD 2026-14-04FuselageAD 2026-14-05CommunicationsAD 2026-12-11FuselageAD 2026-12-02FuselageAD 2026-10-15FuselageAD 2026-10-17FuselageAD 2026-10-11FuselageAD 2026-13-02NavigationAD 2026-09-16FuselageAD 2026-09-17Time Limits/Maintenance ChecksAD 2026-11-04StabilizersAD 2026-09-03Time Limits/Maintenance ChecksAD 2026-09-06FuselageAD 2026-03-10Time Limits/Maintenance ChecksAD 2026-05-14Turbine/turboprop engineAD 2025-23-09FuselageAD 2025-24-51Emergency ADFlight controlsAD 2025-20-15FuselageAD 2025-20-19FuselageAD 2025-19-08WingsAD 2025-18-03OxygenAD 2025-17-05FuselageAD 2025-16-06FuselageAD 2025-16-10Flight controlsAD 2025-16-04Equipment/furnishingsAD 2025-17-17Landing GearAD 2025-16-11Flight Controls; Landing Gear; Oxygen; PneumaticAD 2025-13-10WingsAD 2025-08-01DoorsAD 2025-10-05Landing gearAD 2025-10-07FuselageAD 2025-08-05FuselageAD 2025-09-05FuselageAD 2025-02-04Time Limits/Maintenance ChecksAD 2024-26-05OxygenAD 2025-01-02FuselageAD 2024-25-12Landing gearAD 2025-03-08Flight ControlsAD 2024-26-04PneumaticAD 2024-23-09Equipment/FurnishingsAD 2024-24-09Equipment/FurnishingsAD 2024-24-10Time Limits/Maintenance ChecksAD 2024-19-15OxygenAD 2024-19-07Engine Fuel and ControlAD 2024-12-01WingsAD 2024-11-01Electrical Power
Back to TCDS A28NM