TCDS R00002RC
STCs approved under this data sheet · 16
Current certificates first, most recently changed first.
Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE tcds_number = 'R00002RC') ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT s.stc_number, s.description, s.holder, s.status, s.status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE tcds_number = 'R00002RC') ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SR12332SEInstallation of Mechanical Specialties, LLC Human External Cargo (HEC) and non-HEC Hook SystemSTC SR01776SEFabrication, installation, and maintenance of the Isolair Helicopters, Inc., Model 9002 High Cross tubesSTC SR00143DEInstallation of an upgraded 42 degree Tail Rotor gearbox, P/N 212-040-003STC SR09401RCInstallation of Pratt & Whitney Canada PT6C-67D, engine in accordance with GHTI Master Drawing List Report Number MDL-706-001, Revision D, dated February 20, 2004, or later FAA approved revision.STC SR09492RCInstallation of Pratt & Whitney Canada PT6C-67D, engine in accordance with DynCorp International Master Drawing List Report Number D1H-MDL-100, Revision IR, dated
April 17, 2007, or later FAA approved revision. DynCorp International Rotorcraft Flight Manual Supplement (RFMS) Report Number DIER-0012, Revision 0, dated
January 17, 2008, or later FAA approved revision, is required. Instructions for Continued Airworthiness (ICAs) DIER-0003, Revision 1, dated August 30, 2007, or later revision is required. Airworthiness Limitations section of ICA DIER-0003, approved on August 30, 2007 or later approved revision is required.STC SR02475SEInstallation of a Tailboom Motion Detection SystemSTC SR02492LAInstallation of a Helicopter Technology Company main rotor blade assemblySTC SR02641SEInstallation of a Service DeckSTC SR02070SEFabrication of Dart D205-770-011 Replacement Engine Mount KitSTC SR02413LAInstallation of an AKV, Inc Exceedence and Trend Monitoring System kit P/N ETM1000STC ST04270ATInstall the VTOL ASSALT V3 Windscreen Laminate KitSTC SR01742NYInstallation of extended height landing gear.STC SR09257RCFabrication, modification, and installation of a new vertical fin spar in accordance with Global Helicopter Technology, Inc., Drawing number VTF-030-800, Revision D, dated March 26, 2001, or later FAA approved revision.STC SR01298NYInstallation of replacement crosstubes P/N D212-664.STC SR00563NYInstallation of Skidtubes and associated saddlesSTC SR09402RCInstallation of Tail Rotor Enhancement Kit (TREK).
Back to TCDS R00002RC