AD 2011-26-11

Airworthiness directive · HPC stages 1-2 seal teeth · General Electric GE90-110B1 and GE90-115B

Effective
February 3, 2012
Published
December 30, 2011 · 76 FR 82103–82105
Issued
December 15, 2011
Models
GE90-110B1, GE90-115B
Data sheet
TCDSE00049EN
Registered aircraft
143 matched by model
Product
Engine
Amendment
39-16901
Docket
FAA-2011-0278
Project
2010-NE-10-AD
Issued as
Final rule

Unofficial copy from the Federal Register XML, document 2011-32832. Only the govinfo PDF is the legal edition. DRS record last changed May 30, 2024.

On this page

Summary

We are adopting a new airworthiness directive (AD) for the products listed above, with certain part number (P/N) high-pressure compressor (HPC) stages 2-5 spools installed. This AD was prompted by an aborted takeoff caused by liberation of small pieces from the HPC stages 1-2 seal teeth and two shop findings of cracks in the seal teeth. This AD requires eddy current inspection (ECI) or spot fluorescent penetrant inspection (FPI) of the stages 1-2 seal teeth of the HPC stages 2-5 spool for cracks. This AD only allows installation of either HPC stator stage 1 interstage seals that are pregrooved or previously worn seals with acceptable wear marks to prevent heavy rubs. We are issuing this AD to detect cracks in the HPC stages 1-2 seal teeth due to heavy rubs that could result in failure of the seal of the HPC stages 2-5 spool, uncontained engine failure, and damage to the airplane.

The airworthiness directive

2011-26-11 General Electric Company: Amendment 39-16901; Docket No. FAA-2011-0278; Directorate Identifier 2010-NE-10-AD.

(a) Effective Date

PDF page 3

This AD is effective February 3, 2012.

(b) Affected ADs

PDF page 3

None.

(c) Applicability

PDF page 3

This AD applies to General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with high-pressure compressor (HPC) stages 2-5 spool, part number (P/Ns) 351-103-106-0, 351-103-107-0, 351-103-108-0, 351-103-109-0, 351-103-141-0, 351-103-142-0, 351-103-143-0, or 351-103-144-0, installed.

(d) Unsafe Condition

PDF page 3

This AD was prompted by an aborted takeoff caused by liberation of small pieces from HPC stages 1-2 seal teeth and two shop findings of cracks in the seal teeth. We are issuing this AD to detect cracks in the HPC stages 1-2 seal teeth due to heavy rubs that could result in failure of the seal of the HPC stages 2-5 spool, uncontained engine failure, and damage to the airplane.

(e) Compliance

PDF page 3

Comply with this AD when the HPC forward case half is removed from the engine after the effective date of this AD, unless the actions have already been done.

(f) Inspection

PDF page 3

Perform an eddy current inspection (ECI) or a fluorescent penetrant inspection (FPI) of the HPC stages 1-2 seal teeth using paragraphs 3.B. or 3.C. of GE Service Bulletin (SB) GE90-100 S/B 72-0320, Revision 02, dated October 1, 2010.

(g) Remove Cracked Spools

PDF page 3

Remove from service HPC stages 2-5 spool with cracked stages 1-2 seal teeth before further flight.

(h) Previous Credit

PDF page 3

An ECI or FPI inspection performed before the effective date of this AD using GE SB GE90-100 S/B 72-0320, Revision 02, dated October 1, 2010, or earlier revision, satisfies the inspection requirement of this AD.

(i) Installation of HPC Stator Stage 1 Interstage Seals

PDF page 3

(1) After the effective date of this AD, do not install or reinstall any HPC forward case unless it is equipped with either:

(i) HPC stator stage 1 interstage seals, P/N 351-109-503-0;

(ii) HPC stator stage 1 interstage seals, P/N 351-109-502-0, with the grooves on seals that meet the dimensional requirements defined in paragraph 3.D.(1) of GE SB GE90-100 S/B 72-360, Revision 04, dated November 7, 2011.

(iii) A mixture of the HPC stator stage 1 interstage seals listed in paragraphs (i)(1)(i) and (i)(1)(ii) of this AD.

(j) Alternative Methods of Compliance (AMOCs)

PDF page 3

The Manager, Engine Certification Office, may approve AMOCs for this AD. Use the procedures found in 14 CFR 39.19 to make your request.

(k) Related Information

PDF page 3

(1) Contact Jason Yang, Aerospace Engineer, Engine Certification Office, FAA, Engine & Propeller Directorate, 12 New England Executive Park, Burlington, MA 01803; phone: (781) 238-7747; fax: (781) 238-7199; email: jason.yang@faa.gov, for more information about this AD.

(2) GE Service Bulletins GE90-100 S/B 72-0320, Revision 02, dated October 1, 2010, and GE90-100 S/B 72-0360, Revision 04, November 7, 2011, pertain to the subject of this AD. Contact General Electric, GE-Aviation, Room 285, 1 Neumann Way, Cincinnati, Ohio 45215; email: geae.aoc@ge.com; phone: (513) 552-3272; fax: (513) 552-3329; for a copy of this service information.

(l) Material Incorporated by Reference

PDF page 3

(1) You must use the following service information to do the actions required by this AD, unless the AD specifies otherwise. The Director of the Federal Register approved the incorporation by reference (IBR) under 5 U.S.C. 552(a) and 1 CFR part 51 of the following service information:

(i) General Electric Company (GE) Service Bulletin (SB) GE90-100 S/B 72-0320, Revision 02, October 1, 2010; and

(ii) GE SB GE90-100 S/B 72-0360, Revision 04, dated November, 7, 2011.

(2) For service information identified in this AD, contact General Electric, GE-Aviation, Room 285, 1 Neumann Way, Cincinnati, Ohio 45215; email: geae.aoc@ge.com; phone: (513) 552-3272; fax: (513) 552-3329.

(3) You may review copies of the referenced service information at the FAA, Engine & Propeller Directorate, 12 New England Executive Park, Burlington, MA. For information on the availability of this material at the FAA, call (781) 238-7125.

(4) You may also review copies of the service information incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

Rule preamble

The FAA’s background, reasoning and cost estimate, published with the AD.

DatesPage 1

This AD is effective February 3, 2012.

The Director of the Federal Register approved the incorporation by reference of a certain publication listed in the AD as of February 3, 2012.

AddressesPage 1

For service information identified in this proposed AD, contact General Electric, GE-Aviation, Room 285, 1 Neumann Way, Cincinnati, Ohio 45215; email: geae.aoc@ge.com; phone: (513) 552-3272; fax: (513) 552-3329. You may review copies of the referenced service information at the FAA, Engine & Propeller Directorate, 12 New England Executive Park, Burlington, MA. For information on the availability of this material at the FAA, call (781) 238-7125.

For further information contactPage 2

Jason Yang, Aerospace Engineer, Engine Certification Office, FAA, Engine & Propeller Directorate, 12 New England Executive Park, Burlington, MA 01803; phone: (781) 238-7747; fax: (781) 238-7199; email: jason.yang@faa.gov.

DiscussionPage 2

We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to the specified products. That NPRM published in the Federal Register on May 26, 2011 (76 FR 30573). That NPRM proposed to require ECI or spot FPI of the stages 1-2 seal teeth of the HPC stages 2-5 spool for cracks and to prohibit installation of HPC stator stage 1 interstage seals that are not pregrooved to prevent heavy rubs.

CommentsPage 2

We gave the public the opportunity to participate in developing this AD. The following presents the comments received on the proposal and the FAA's response to each comment.

Remove Reference to “Uncontained Engine Failure and Damage to the Airplane”Page 2

Two commenters, Boeing Company (Boeing) and GE, wanted us to remove the reference to “uncontained engine failure, and damage to the airplane” from the Summary and Unsafe Condition paragraphs. GE claimed that all instances to date of material liberation have been contained. The commenters further stated that it has been demonstrated that once the crack reaches the aft tooth, it turns circumferentially, which minimizes the amount of material liberated.

We disagree. While all of the fractures to date have resulted in small pieces that are contained by the engine case, the direction that the crack will propagate cannot be determined with great certainty. Cracks propagating into the seal will result in a more substantial failure of the HPC stages 1-2 seal. Historical experience has shown that catastrophic failure of critical rotating engine parts can result in an uncontained engine failure that can damage the airplane. We did not change the AD based on this comment.

Request Change to Service Bulletin ReferencePage 2

Two commenters, Boeing and GE, requested that we change the “Previous Credit” section by replacing “SB GE90-100 S/B 72-0320, Revision 01, dated May 11, 2010 or earlier revision” with “SB GE90-100 S/B 72-0320, Revision 02, dated October 1, 2010, or earlier version.” The commenters indicated that the NPRM (76 FR 30573, May 26, 2011) mandates accomplishment of GE Service Bulletin (SB) GE90-100 S/B 72-0320, Revision 02, dated October 1, 2010, and therefore it would be consistent to provide credit for accomplishment of GE SB GE90-100 S/B 72-0320, Revision 02, dated October 1, 2010, or an earlier revision.

We agree. We changed the reference in the service bulletin to Revision 02 in the Previous Credit paragraph.

Request To Allow Reinstallation of Previously Worn SealsPage 2

Three commenters, FedEx, Japan Airlines and All Nippon Airways, requested that the FAA allow the installation of previously worn seals. Use of these seals is allowed by GE SB GE90-100 S/B 72-0360.

We agree. We replaced the Installation Prohibition paragraph in the AD with a new paragraph called “Installation of HPC Stator Stage 1 Interstage Seals” to allow for the installation of previously worn seals. Refer to GE SB GE90-100 S/B 72-360, Revision 04, dated November 7, 2011, for seals eligible for installation.

Request Change in Installation Prohibition SectionPage 2

FedEx requested that wording in the “Installation Prohibition” section that states “do not install any HPC forward case unless it has an HPC stator stage 1 interstage seals, P/N 351-109-503-0” be changed to “allow the installation of previously worn seals and/or potential future (post-SB 72-0358) interstage seal configurations.” FedEx indicated that the current wording unnecessarily prohibits the installation of any forthcoming design improvements to the interstage seals that GE might develop.

We partially agree. We agree with use of a previously worn interstage seal because a worn interstage seal could prevent the HPC stages 2-5 spool from cracking. We disagree with use of the phrase “potential future (post-SB 72-0358) interstage seal configurations” because the AD compliance section can only mandate the use of currently approved designs. We added a new paragraph called “Installation of HPC Stator Stage 1 Interstage Seals,” which allows for the installation of previously worn seals.

Remove Reference to Pregrooved SealsPage 2

GE stated that the AD requires the HPC module be reassembled with pregrooved seals. GE indicated that this requirement to use pregrooved seals is beyond the inspection requirements in GE90-100 S/B 72-0320. GE said that the inclusion of pregrooved seal references would cause disagreement with the “Relevant Service Information” and “Previous Credit” paragraphs which refer only to the inspection requirement in GE90-100 S/B 72-0320.

We disagree. This AD is issued to mitigate a safety issue caused by failure of the HPC stages 2-5 spool stages 1-2 seal. Reassembling the HPC module with a pregrooved seal would prevent the heavy rubs that result in HPC stages 2-5 spool stages 1-2 seal failure. We did not change the AD based on this comment.

Request Correction to AddressPage 2

GE requested that its address in the Addresses paragraph be revised to correct a missing space.

We agree. We corrected the GE address in the Addresses paragraph of the AD.

ConclusionPage 2

We reviewed the relevant data, considered the comments received, and determined that air safety and the public interest require adopting the AD with the changes described previously and minor editorial changes. We have determined that these minor changes:

• Αre consistent with the intent that was proposed in the NPRM (76 FR 30573, May 26, 2011) for correcting the unsafe condition; and

• Do not add any additional burden upon the public than was already proposed in the NPRM (76 FR 30573, May 26, 2011).

We also determined that these changes will not increase the economic burden on any operator or increase the scope of the AD.

Costs of CompliancePage 2

We estimate that this AD affects 19 GE90-110B1 and GE90-115B engines installed on airplanes of U.S. registry. We also estimate that it will take about 2 work-hours per engine to perform the proposed actions, and that the average labor rate is $85 per work-hour. Required parts will cost about $9,857 per engine. Based on these figures, we estimate the total cost of this AD to U.S. operators to be $190,513.

Authority for This RulemakingPage 3

Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII: Aviation Programs, describes in more detail the scope of the Agency's authority.

We are issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701: “General requirements.” Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.

Regulatory findingsPage 3

This AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.

For the reasons discussed above, I certify that this AD:

(1) Is not a “significant regulatory action” under Executive Order 12866,

(2) Is not a “significant rule” under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979),

(3) Will not affect intrastate aviation in Alaska, and

(4) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.

Adoption of the AmendmentPage 3

Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:

Adoption of the amendmentPage 3

1. The authority citation for part 39 continues to read as follows:

2. The FAA amends § 39.13 by adding the following new airworthiness directive (AD):

Affected TCDS · 1

The type certificate data sheets for the models this AD names, matched by model and maker.

Registered aircraft · 143

Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.

By aircraft maker
  • Boeing143 aircraft
By year built
20052026
Registered aircraft by year built: 139 aircraft
20053
20063
20072
200912
20108
20119
201215
201310
20145
20154
20164
201715
20187
20199
20207
20216
20223
20237
20241
20255
20264

4 with no year recorded

By model

Aircraft

See all 143 aircraft