Unofficial copy of the text in the FAA’s Dynamic Regulatory System. The FAA’s own copy is the authoritative one. DRS record last changed May 30, 2024.

On this page

The airworthiness directive

67-30-05 MCDONNELL DOUGLAS: Amdt. 39-505 Part 39 Federal Register November 9, 1967. Applies to Model DC-9 Series Airplanes.

Compliance required as indicated.

Due to at least three reports of malfunctions in the battery charger installed in DC-9 airplanes that have resulted in smoke and fire in the electrical compartment, accomplish the following:

1. Within 10 hours' time in service after the effective date of this AD:

A. Inspect the battery charger, P/N 263-40061-01 and inspect and service each battery in the electrical compartment in accordance with Paragraphs 1, 2 and 3 of the "Inspection Procedures for Aircraft" section of a wire dated 10-19-67, constituting McDonnell Douglas DC-9 Alert Service Bulletin A-24-26, or by a method approved by the Chief, Aircraft Engineering Division, FAA, Western Region:

B. Deactivate circuit breakers normally coded K7, K8, and K9, titled battery charger and transfer relay (20 AMP, left bus) and secure in the open position, or remove and stow wires P32A14C, P33A14B, and P34A-14A at the circuit breaker:

C. Placard circuit breakers K7, K8, and K9 to indicate that they are deactivated:

D. Unless already accomplished in accordance with Paragraph 5 of the "Inspection Procedures for Aircraft" section of the Service Bulletin referenced in this Paragraph, place an operating limitation in the form of a placard in the vicinity of the APU start switch stating: "Operating Limitation, Do not start APU electrically inflight": and

E. Unless already accomplished in accordance with Paragraph 5 of the "Inspection Procedures for Aircraft" section of the Service Bulletin referenced in this Paragraph, place an operating limitation in the form of a placard in the cockpit in clear view of the pilot and copilot, stating: "Operating Limitation, Do not ground start APU after battery charger circuit breakers are opened (pulled) prior to takeoff."

2. If an inspection specified in Paragraph 1 of this AD reveals evidence of overheating, cracking, or other abnormal appearance of the battery charger (including the flag lugs and positive ceramic stud build-up and solder-joint on the inside and outside of the charger on the filter, and the solder-joints to chassis), replace before further flight.

3. The following operating limitations are prescribed for all affected airplanes:

A. Immediately prior to start of each taxi:

i. Determine that the battery charger is operating in the pulsing mode.

ii. Pull circuit breakers U21, W21, and X24 in immediate succession to deactivate the batter charger.

iii. Enter the electrical compartment and inspect the battery charger and adjacent vicinity to determine that the charger has been operating satisfactorily as evidence by a lack of smoke. (May be accomplished by ground personnel.)

B. After parking close (push in) circuit breakers U21, W21, and X21 in immediate succession.

NOTE No. 1: The APU may be started after landing and during taxi to the ramp.

NOTE No. 2: The APU may be windmill started in flight in the event of a complete in-flight loss of electrical power.

The operating limitations specified in Subparagraphs A and B of this Paragraph must be placed in the aircraft in the form of a placard in clear view of the pilot. For the purpose of this AD, any document (including a pilot check list) including these limitations constitutes a "placard" within the meaning of this Paragraph.

4. Compliance with Paragraphs 1 and 3 of this AD is no longer required, and the operating limitations prescribed in those Paragraphs may be removed upon:

A. Accomplishing the modifications specified in the "Accomplishment Instructions" sections of McDonnell Douglas DC-9 Service Bulletin Nos. 24-25 dated December 1, 1967 (or later FAA-approved revision), 24-27 dated December 1, 1967 (or later FAA-approved revision), 25-97 dated November 10, 1967 (or later FAA-approved revision); and

B.Removing FAA-approved revisions dated May 3, 1967, and incorporating FAA-approved revisions dated December 1, 1967, to the Emergency Procedures Section of the FAA-approved DC-9 Series 10 Airplane Flight Manual (Douglas Report DAC-32999) or the FAA-approved DC-9 Series 30 Airplane Flight Manual (Douglas Report DAC-33530), as appropriate, under the heading of "Electrical Smoke of Unknown Origin" Phase III.

This amendment effective December 19, 1967.

Affected TCDS · 1

The type certificate data sheets for the models this AD names, matched by model and maker.

Registered aircraft · 99

Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.

By aircraft maker
  • Mcdonnell Douglas93 aircraft
  • Douglas6 aircraft
By year built
19661999
Registered aircraft by year built: 84 aircraft
19661
19674
19692
19701
19821
19861
19875
19884
19893
19903
199123
19925
19931
19941
19961
19976
19986
199916

15 with no year recorded

By model

Aircraft

See all 99 aircraft