AD 77-21-07

Airworthiness directive · Wiring · Airbus Helicopters Deutschland BO-105A and BO-105C

Effective
November 14, 1977
Models
BO-105A, BO-105C
Data sheet
TCDSH3EU
Registered aircraft
4 matched by model
Product
Aircraft · Rotorcraft
Amendment
39-3061

Unofficial copy of the text in the FAA’s Dynamic Regulatory System. The FAA’s own copy is the authoritative one. DRS record last changed May 30, 2024.

On this page

The airworthiness directive

77-21-07 MESSERSCHMITT-BOLKOW-BLOHM (MBB): Amendment 39-3061. Applies to Model BO-105A and BO-105C helicopters, Serial Number V4 through V10, and S1 through S160, certificated in all categories. Compliance required within the next 600 hours time in service after the effective date of this AD, unless already accomplished. Remove socket connections 1 VED and 1 VEE from main relay box, remove plugs 110 VVa and 210 VVa together with associated receptacles and wiring bundles, and install generator wiring assembly, in accordance with subparagraph 2B of MBB Service Bulletin No. 90-11 dated April 17, 1975, or an FAA-approved equivalent. This amendment becomes effective November 14, 1977.

Affected TCDS · 1

The type certificate data sheets for the models this AD names, matched by model and maker.

Registered aircraft · 4

Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.

By aircraft maker
  • Messerschmitt-Boelkow-Blohm-Gm4 aircraft
By year built
19731974
Registered aircraft by year built: 2 aircraft
19731
19741

2 with no year recorded

By model

Aircraft