AD 83-03-03

Airworthiness directive · Tail Boom and Fin · California Department of Forestry UH-1F, UH-1A, UH-1B and 5 more

Effective
March 14, 1983
Models
UH-1F, UH-1A, UH-1B, UH-1B, UH-1E, UH-1L, UH-1B, UH-1F
Data sheets
TCDSH2NMTCDSH3SO
Registered aircraft
2 matched by model
Product
Aircraft · Rotorcraft
Amendment
39-4556

Unofficial copy of the text in the FAA’s Dynamic Regulatory System. The FAA’s own copy is the authoritative one. DRS record last changed May 30, 2024.

On this page

The airworthiness directive

83-03-03 GARLICK HELICOPTERS, HAWKINS & POWERS AVIATION, INC., WILCO AVIATION (BELL): Amendment 39-4556. Applies to Model UH-1 series helicopters certificated in restricted category.

Compliance is required as indicated, unless already accomplished.

To detect cracks and to prevent possible failure of the tail boom and fin, accomplish the following:

Within the next 30 hours' time in service after the effective date of this AD:

a. Conduct the following inspections:

(1) Visually inspect the tail boom skin joint at tail boom Station 194 for fretting or cracking (inspect 10 inches forward and 10 inches aft of Station 194).

(2) Visually inspect the vertical fin front spar cap at its intersection with the tail rotor gear box support fitting for cracks.

(3) The areas to be inspected are shown in Figure 1.

b. For aircraft found to have fretting or cracks by the inspections of paragraph a. above and for aircraft with more than 1,000 hours' time inservice, conduct a radiographic inspection of the tail boom Station 194 splice joint in accordance with Advisory Circulars 43-3 (Chapter 2) and 43-13-1A (paragraph 298) to MIL-STD-453 requirements, or FAA approved equivalent.

c. After the initial inspections -

(1) Visually inspect the tail boom skin and fin spar cap area in accordance with paragraph a. above, at intervals not to exceed 100 hours' time in service from the last radiographic inspection.

(2) Radiographically inspect the tail boom skin in accordance with paragraph b. above at intervals not to exceed 500 hours' time in service from the last radiographic inspection.

d. Replace cracked skin panels with serviceable panels.

e. Replace cracked fin spar caps with serviceable parts.

f. Any equivalent method of compliance with this AD must be approved by the Manager, Aircraft Certification Division, Southwest Region, Federal Aviation Administration.

g. Upon request of the operator, an FAA maintenance inspector, subject to prior approval of the Manager, Aircraft Certification Division, FAA Southwest Region, may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase for that operator.

h. In accordance with FAR 21.197, flight is permitted to a base where the inspections required by this AD may be accomplished.

This amendment becomes effective March 14, 1983.

Affected TCDS · 2

The type certificate data sheets for the models this AD names, matched by model and maker.

Registered aircraft · 2

Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.

By aircraft maker
  • Hawkins & Powers2 aircraft
By year built
19611962
Registered aircraft by year built: 2 aircraft
19611
19621

By model

Aircraft

NTSB investigations that cite this AD · 1

Their narratives or probable cause name AD 83-03-03, often to say whether the aircraft complied with it.