- Effective
- October 19, 1983
- Models
- DC-6, DC-6A, DC-6B, Navy R6D-1, Navy R6D-1Z, USAF C-118A
- Registered aircraft
- 17 matched by model
- Product
- Aircraft · Large airplane
- Amendment
- 39-4740
Unofficial copy of the text in the FAA’s Dynamic Regulatory System. The FAA’s own copy is the authoritative one. DRS record last changed May 30, 2024.
Copies of the files this page was built from, with their SHA-256. Retrieved October 18, 2026.
| File | Size | SHA-256 | Original |
|---|---|---|---|
| FAA DRS HTML | 27 KB | 00611b9b…56f7c3e | FAA DRS (API key needed) |
On this page
The airworthiness directive
83-20-04 McDONNELL DOUGLAS: Amendment 39-4740. Applies to McDonnell Douglas Model DC-6, -6A, -6B, R6D (Navy), and C118 (USAF) series airplanes, certificated in all categories.
Compliance required as indicated, unless previously accomplished.
To detect cracks and prevent failure of the horizontal stabilizer rear spar caps accomplish the following:
A. Within the next 30 days after the effective date of this AD, unless already accomplished, inspect and repair, if necessary, the horizontal stabilizer upper and lower rear spar cap attach fittings on both sides of station 63 in accordance with the Accomplishment Instructions of McDonnell Douglas Service Rework Drawing J060265 "N/C" dated July 29, 1983, hereinafter referred to as Rework Drawing, or later revisions approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region, as follows:
1. If no cracks are found in the rear spar attach fittings, apply primer and lacquer top coat(lacquer top coat optional). Apply LPS-3 corrosion inhibiting oil, or equivalent when approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region, throughout the attach fitting (bathtub area) and reinstall the bolt per the Rework Drawing. Conduct repetitive inspections per the Rework Drawing at intervals not to exceed 12 calendar months.
2. If a crack is found equal to or exceeding 1/2" at location A, 3" at location B, or 6" at location C as defined in figure 2 of the Rework Drawing, accomplish the repair in (a) or (b) below, prior to further flight:
(a) If the crack is inboard of station 63, repair in accordance with the Accomplishment Instructions of the Rework Drawing.
(b) If the crack is outboard of station 63, repair per the McDonnell Douglas DC-6 Structural Repair Manual, Tail Group, Page 138, Figure 134, dated October 15, 1952.
3. If a crack is found that is less than 1/2" at location A, 3" at location B, or 6" at location C, repetitively inspect per the Rework Drawing at intervals not to exceed:
(a) for location A: 7 calendar days, or prior to further flight, whichever occurs later.
(b) for location B: 14 calendar days, or prior to further flight, whichever occurs later.
(c) for location C: 21 calendar days, or prior to further flight, whichever occurs later.
B. Repairs per Paragraph 2, above, constitutes terminating action for the repetitive inspections required by this AD only at those locations repaired.
C. If more than one crack is found, repair all cracked areas as specified in Paragraphs A. 2(a) and/or 2(b), above.
D. Alternate means of compliance which provide an equivalent level of safety may be used when approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region.
E. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base to comply with the repair requirements of this AD when approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region.
This Amendment becomes effective October 19, 1983.
Affected TCDS · 3
The type certificate data sheets for the models this AD names, matched by model and maker.
Registered aircraft · 17
Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.
| 1953 | 1 |
|---|---|
| 1954 | 2 |
| 1956 | 1 |
| 1957 | 3 |
| 1958 | 3 |
| 1959 | 1 |
6 with no year recorded