N664MS

Service difficulty reports · 242

Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE n_number = 'N664MS' AND registry_match = 'registration'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR SIMA20190220002Anti-Ice Valve · failedE1 A/ICE FAIL ON EICAS-ENG AIR INLET STAYS OPEN. E1 A/ICE DEFERRED AS PER MEL 30-11 AUT 020727DM-C. M PROCEDURE C/W. C/W FIM TASK 30-21-00-810-801-A FOR ENG 1 A/ICE VLV FAIL ON CMC 2X. RAR ENG1 A/ICE VALVE IAW EMB AMM 30-21-01 AND ENG1 PRESSURE TRANSDUCER IFeb 20, 2019 · N664MS · Emb EMB145LR · Engine Anti-Icing SystemSDR SIMA201902087001Pressure Switch · failedUNABLE TO PRESSURIZE ABOVE 10,000FT CAB ALT WENT TO 11,000FT-C/A-DEFERED AUTO AND MANUAL PRESSURIZATION M PROCEDURES C/W REF MEL 21-19 AUTH 020255DM-C. DURING T/S OF MEL 21-19 FOUND PBA PANEL SEAL TO BE TORN. COULD NOT PERFORM OPS CHECK DUE TO PACK 2 MEL. MEL Feb 7, 2019 · N664MS · Emb EMB145LR · Cabin Pressure Control SystemSDR SIMA2018121209003Brake · overheatedHIGHSPEED ABORT DUE TO BRAKE OVERHEAT ABORT AT 129KTS-C/A-PERFORMED MAIN BRAKE SYSTEM FUNCTIONAOL CK AND PHYSICAL CK OF MAIN TIRES AND BRAKES IAW EMB145 AMM 32-41-00. NO DEFECTSNOTED. DEFERED PER MEL 32-2. ALL MTX ACTIONS C/WDec 9, 2018 · N664MS · Emb EMB145LR · Landing Gear Brake SystemSDR SIMA201809043001Inverter · inoperativeDURING PS-1 CHECK, FOUND NR 2 AND NR 3 FLOOR EMERGENCY LIGHT STRIPS INOP. R&R NR 3 EMERGENCY LIGHT DC/AC INVERTER IAW AMM 33-50-11.Sep 3, 2018 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA201808143001Smoke Detector · no testCARGO EXTINGUISHER LIGHT DOES NOT TEST DURING FIRE TEST. REMOVED AND REPLACED THE FWD CARGO SMOKE DETECTOR IAW AMM 26-15-01, OPS CHECKED GOOD.Aug 13, 2018 · N664MS · Emb EMB145LR · Smoke DetectionSDR SIMA201807132002Inverter · inoperativeRT FWD BULKHEAD EMERGENCY LIGHT INOP AT ROW 3. R&R NR 3 EMER LIGHT DC/AC INVERTER IN REF TO AMM 33-50-11, AND OPS CHKED EMER LIGHTS OK IN REF TO AMM 33-50-00.Jul 12, 2018 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20180703001Proximity Sensor · failedLG AIR/GND FAIL CAUTION MESSAGE ON EICAS DURING CLIMB THROUGH 8,000FT. REMOVED AND REPLACED LT NR 1 & 2 WOW PROXIMITY SWITCHES OPTS CHECK GOOD IAW AMM 32-63-01 REFERENCE NRWC 664-MIA 03499 FOR WORK PERFORMED. PROXIMITY SENSOR P/N 80-057-01 S/N 45315 LHG2.Jul 2, 2018 · N664MS · Emb EMB145LR · Landing Gear Position and WarningSDR SIMA201807030002Electronic Unit · failedLG AIR/GND FAIL AFTER DEPARTURE IN CLIMB APPROX 4000' MSL GEAR SHOWED UP + LOCKED INDICATED NEGATIVE STICK SHAKER ON APPROACH/ ENROUTE. TROUBLESHOOTING PER FIM 32-63-00-810-804-A REVEALED POSSIBLE BAD LGEU REFERENCE TURNOVER ITEM 2 THIS NRWC. REMOVED AND REPLAJun 30, 2018 · N664MS · Emb EMB145LR · Landing Gear Retraction/Extension SystemSDR SIMA201806064010Inverter · inoperativeEMERGENCY LIGHT IN ROW 3 (B+C SIDE) DID NOT WORK. REMOVED AND REPLACED THE INVERTER IAW AMM 33-50-11. OPS CHECKED GOOD. ACFT OK FOR SERVICE.Jun 4, 2018 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20180416002Connector · disconnectedBOTH EXIT EMERGENCY LIGHTS AND TWO PROXIMITY LIGHT STRIPS ARE INOPERATIVE. UPON FURTHER INSPECTION FOUND THE CONNECTOR PLUG TO NR 3 EMERGENCY POWER SUPPLY TO BE DISCONNECTED. RECONNECTED IAW AMM 33-50-04. OPS CHECKED GOOD.Apr 16, 2018 · N664MS · Emb EMB145LR · Light System WiringSDR SIMA20180106001Pressure Switch · failedDURING TAKEOFF ROLL, A NR 2 BLEED FAIL ACTIVATED ON EICAS. AN ABORT WAS INITIATED AT 80KTS. REMOVED AND REPLACED PRESURE SWITCH IAW AMM 36-11-07 AND E2 REGULATOR VALVE IAW AMM 36-11-05 OPS CHECKED GOOD.Jan 6, 2018 · N664MS · Emb EMB145LR · Pneumatic Distribution SystemSDR SIMA20170604004Stator · damagedNR 4 WHEEL BRAKE ASSY DAMAGED 1ST STATOR DUE TO PISTON OVERTRAVEL. REMOVED AND REPLACED THE BRAKE ASSY IAW 32-600-14Jun 4, 2017 · N664MS · Emb EMB145LR · Landing Gear Brake SystemSDR SIMA20170303001Wire · brokenEMERGENCY LIGHT AT 251DF HAS BROKEN WIRES. REMOVED AND REPLACED THE EMERGENCY LIGHT IAW AMM 33-50-12.Mar 3, 2017 · N664MS · Emb EMB145LR · Light System WiringSDR SIMA20170225001Charger · inoperativeAFT FLOOR PROXIMITY LIGHTING DOES NOT ILLUMINATE. REMOVED AND REPLACED THE BATTERY HOLDER AND BATTERY CHARGER ASSEMBLY IAW AMM 33-50-04, OPS CHECKED GOOD.Feb 25, 2017 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20170224002Wire · pulledLEFT NR 1 EMERGENCY LIGHT WIRES PULLED OFF. REMOVED AND REPLACED THE LIGHT STRIP IAW AMM 33-50-12.Feb 24, 2017 · N664MS · Emb EMB145LR · Light System WiringSDR SIMA20170221005Skin · crackedCRACKS IN SKIN AT FRAME 79 BETWEEN STRINGERS 5 - 6L. REPAIRED THE SKIN IAW ERS-EM-53MR-2591Feb 21, 2017 · N664MS · Emb EMB145LR · Fuselage Main, Plate/SkinSDR SIMA20170221006Door · corrodedLEFT EMERGENCY EXIT DOOR HAS CORROSION ON BOTTOM EDGE AROUND RUBBER STOP. REPAIRED IAW ERS-EM-52MR-712Feb 21, 2017 · N664MS · Emb EMB145LR · Emergency ExitsSDR SIMA20170210003Yoke · crackedLT ENGINE FORWARD LOWER YOKE CRACKED BEHIND ENGINE MOUNT. REMOVED AND REPLACED THE YOKE IAW EO EM-54MR-386.Feb 10, 2017 · N664MS · Emb EMB145LR · Engine Mount SectionSDR SIMA20170203005Bulb · inoperativeRT FORWARD FUSELAGE EMERGENCY LIGHT WILL NOT ILLUMINATE. REMOVED AND REPLACED THE BULB IAW AMM 33-50-10. OPS CHECKED GOOD.Feb 3, 2017 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20170203006Crossbeam · corrodedCORROSION ON CROSSBEAM AT FRAME 20. REMOVED AND REPLACED THE CROSSBEAM IAW SRM 53-21-10 AND ETN-EM-53-139.Feb 3, 2017 · N664MS · Emb EMB145LR · Fuselage Main, StructureSDR SIMA20170112003Light · damagedMAIN DOOR EMERGENCY LIGHT FAIRING DAMAGED. REMOVED AND REPLACED MAIN DOOR EMERGENCY LIGHT FAIRING OPC GOOD IAW EMB AMM 25-23-04Jan 12, 2017 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20160829002Lamp · inoperativeLEFT OVERWING EXIT LIGHT INOPERATIVE. REPLACED THE LAMP, OPS OK IAW AMM 33-50-10Aug 29, 2016 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20160816004Light · inoperativeCEILING EMERGENCY EXIT LIGHT AT SEAT ROWS 16 AND 17 INOPERATIVE. R & R CEILING EMERGENCY EXIT LIGHT LAMP AT SEAT ROWS 16 AND 17 IAW AMM 33-50-08. OPS CHECK GOOD.Aug 16, 2016 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20160413003Cradle · brokenPASSENGER CABIN AFT EMER FLASHLIGHT CRADLE IS BROKEN. R & R FLASHLIGHT ASSEMBLY IAW AMM 33-50-16. OPERATIONAL CHECKED GOOD.Apr 13, 2016 · N664MS · Emb EMB145LR · Emergency EquipmentSDR SIMA20160411001Carbon Seal · not reportedA SLIGHT HINT OF OIL SMELL WHEN ICE PROTECTION SYS WAS ACTIVATED. TRANSFERRED TO NRWC 664-ORD-02423. THIS DISCREPANCY TRANSFERED. EM 1 NEXT LOG PAGE FOR AN INTENDED SFP. IAW NRWC 664-ORD-02423 FOR ADDITIONAL MX IFO. R & R NR 0 CARBON SEAL ASSEMBLY IAW R & Apr 11, 2016 · N664MS · Emb EMB145LR · Turbine Engine Oil SystemSDR SIMA20160202003Holder · brokenFIRST OFFICERS EMER FLASHLIGHT HOLDER BROKEN. R & R FIRST OFFICERS EMER FLASHLIGHT HOLDER IAW AMM 33-50-16-000-801-A & 33-50-16-400-801-A. NO FURTHER DEFECTS NOTED AT THIS TIME.Feb 2, 2016 · N664MS · Emb EMB145LR · Emergency EquipmentSDR SIMA20151104004Hydraulic System · lowHYDRAULIC 1 LOW QTY PRESENTED ON EICAS IN FLIGHT. SHOWS QTY POINTER AMBER & AT AMBER THRESHOLD.Nov 4, 2015 · N664MS · Emb EMB145LR · Hydraulic System, MainSDR SIMA20151011001Cradle · brokenCAPTAINS EMER FLASHLIGHT CRADLE BROKEN. R & R CAPTAINS EMER FLASHLIGHT ASSEMBLY IAW AMM 33-50-16-000-801-A & 33-50-16-400-801-A. OPERATIONS CHECKED GOOD AT THIS TIME.Oct 11, 2015 · N664MS · Emb EMB145LR · Emergency EquipmentSDR SIMA20150521005Light · inoperativeLEFT OVERWING EMER LIGHT INOPERATIVE. R & R LT OVERWING EMER LIGHT IAW AMM 33-50-10. OPERATIONS CHECKED GOOD.May 21, 2015 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20150426002Flashlight · inoperativeAFT CABIN FLASHLIGHT WILL NOT STAY ON. R & R AFT CABIN FLASHLIGHT IAW TASK 33-50-16-000-801-A & TASK 33-50-16-400-801-A. OPERATIONS CHECKED GOOD.Apr 26, 2015 · N664MS · Emb EMB145LR · Emergency EquipmentSDR SIMA20150106007Charger · inoperativeMAIN DOOR LIGHT FAILED FUNCTIONAL CHECK. R & R BATTERY HOLDER, BATTERY CHARGER & LIGHT ASSEMBLY IAW AMM 33-50-04 & 33-50-10. OPERATIONALLY CHECKED GOOD.Jan 6, 2015 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20141228013Connector · brokenFOUND NR 3 FLOOR PROXIMITY LIGHT WIRES BROKEN CONNECTORS. REPAIRED NR 3 FLOOR PROXIMITY LIGHT WIRES IAW SWPM 20-00-03 PAGE 65.Dec 28, 2014 · N664MS · Emb EMB145LR · Light System WiringSDR SIMA20141228012Connector · brokenFOUND NR 8 FLOOR PROXIMITY LIGHT WIRES BROKEN CONNECTORS. REPAIRED NR 8 FLOOR PROXIMITY LIGHT WIRES IAW SWPM 20-00-03 PAGE 65.Dec 28, 2014 · N664MS · Emb EMB145LR · Light System WiringSDR SIMA20141224004Skin · dentedFRAME 23 - 24 STRINGER 17R - 18R HAS MULTIPLE DENTS. PERFORMED PERMANENT REPAIR IAW ERS-EM-53MR-967.Dec 24, 2014 · N664MS · Emb EMB145LR · Fuselage Main, Plate/SkinSDR SIMA20141220003Fitting · damagedLEFT AILERON DAMPER FITTING DAMAGED. REMOVED & INSTALL DAMPER FITTING IAW EO EM-27MR-112 TDMI REPAIR.Dec 20, 2014 · N664MS · Emb EMB145LR · AileronsSDR SIMA20141211009Structure · crackedRIGHT WING CTR BELLY ATTACHMENT FLANGE IS CRACKED. R & R RT WING CTR BELLY ATTACHMENT FLANGE IAW ERS-EM-5700-342.Dec 11, 2014 · N664MS · Emb EMB145LR · Wing Miscellaneous StructureSDR SIMA20141211008Escape Rope · frayedPILOTS ESCAPE ROPE FRAYED AT THE END. R & R PILOTS ESCAPE ROPE IAW AMM 25-60-07 & ETN-EM-25-392.Dec 11, 2014 · N664MS · Emb EMB145LR · Emergency EquipmentSDR SIMA20141211007Pressure Switch · failedMAIN BRAKE HYD SUPPLY PRESS SWITCH FAILS MAIN BRAKE FUNCTIONAL TEST & REMAINS RED WHERE IT SHOULD BE GREEN. R & R RT MAIN BRAKE HYD SUPPLY PRESS SWITCH IAW AMM 32-41-04, EASI TORQUE WRENCH 7538.Dec 11, 2014 · N664MS · Emb EMB145LR · Landing Gear Brake SystemSDR SIMA20141202008Light · inoperativeDURING PS 2 INSPECTION FOUND EMER LIGHT SYS REAR NR 8, LAST SECTION FLOOR PROX STRIP INOPERATIVE. R & R EMER LIGHT STRIP FLOOR SECTION NR 8 IAW AMM 33-50-12. OPERATIONS CHECKED GOOD. MEL 33-30 RESTORED.Dec 2, 2014 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20141123009Battery · dischargedLEFT & RIGHT OVERWING EMER LIGHTS INOPERATIVE. R & R NR 4 EMER LIGHT BATTERY & CHARGER IAW AMM 33-50-04. OPERATIONS CHECKED GOOD. EMER LIGHTING BATTERY PN 2013-1A & SN 68433.Nov 23, 2014 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20140810003Inverter · inoperativeEMERGENCY LIGHTS FLOOR STRIP FROM ROWS 12 TO 18 INOPERATIVE. R & R NR 6 INVERTER IAW AMM 33-50-11. OPERATIONS CHECKED GOOD.Aug 10, 2014 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20140807001Charger · inoperativeEMERGENCY FLOOR STRIPS 12A - 18A ARE INOPERATIVE. R & R THE NR 4 EMER CHARGER & BATTERY HOLDER ASSEMBLY IAW WC 33-700-19. OPERATIONS CHECKED IAW WC 33-700-17, OPERATIONS CHECKED GOOD, NO FAULTS FOUND END.Aug 7, 2014 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20140617001Handle · out of positionFLIGHT ATTENDANT REPORTS THAT MAIN CABIN DOOR HANDLE IS SITTING ON A LEDGE MAKING IT DIFFICULT TO OPERATE. RE-INDEXED HANDLE IAW AMM 32-11-01. OPERATIONS CHECKED GOOD NO DEFECT NOTED.Jun 17, 2014 · N664MS · Emb EMB145LR · Passenger/Crew DoorsSDR SIMA20140611002Wire · damagedEMER LIGHTS ARMED MSG INTERMITTENTLY. FOLLOWED FIM TASK 33-50-00 FOUND WIRE SHIELDING ON WIRES OF ATT CONTROL PANEL EXPOSED. REPAIRED WIRES IAW 20-21-00 WM 33-50-50- OPERATIONS CHECKED GOOD.Jun 11, 2014 · N664MS · Emb EMB145LR · Light System WiringSDR SIMA20140317002Holder · brokenCAPTAIN'S FLASHLIGHT HOLDER BROKEN. R & R CAPTAIN'S FLASHLIGHT HOLDER IAW AMM 33-50-16. OPERATIONS CHECKED GOOD.Mar 17, 2014 · N664MS · Emb EMB145LR · Emergency EquipmentSDR SIMA20140207003Light · inoperativeRIGHT OVERWING EMERGENCY LIGHT INOPERATIVE. R & R LAMP ON RT OVERWING EMERGENCY LIGHT IAW AMM 33-50-10-420-003-A00, OPERATIONS CHECKED OK.Feb 7, 2014 · N664MS · Emb EMB145LR · Emergency LightingSDR SIMA20131211001Flashlight · inoperativeON FLIGHT 3278 THE CREW REPORTED THE FLIGHT ATTENDANT’S FLASHLIGHT WAS NOT WORKING. THE AIRCRAFT WAS REMOVED FROM SERVICE. R & R CAPTAIN`S FLASHLIGHT ASSEMBLY IAW EMB 140 AMM 33-50-16 & OPERATIONAL CHECK WAS GOOD. THE ACFT WAS RETURNED TO SERVICE.Dec 11, 2013 · N664MS · Emb EMB145LR · Emergency EquipmentSDR SIMA20130801006Flashlight · inoperativeTHE CREW REPORTED THE AFT F/A FLASHLIGHT WAS INOPERATIVE. ACFT OK FOR SERVICE. R & R THE AFT FLASHLIGHT ASSY. OPS CHECKED GOOD IAW 33-50-16. ACFT RETURNED TO SERVICE.Aug 1, 2013 · N664MS · Emb EMB145LR · Emergency EquipmentSDR SIMA20130604012Support Bracket · crackedPAX DOOR INNER HANDLE HSG SUPPORT BRACKET IS CRACKED. REPAIRED DAMAGED SUPPORT BOX IAW EM-52MR-250.Jun 4, 2013 · N664MS · Emb EMB145LR · Passenger/Crew DoorsSDR SIMA20130604011Sill · corrodedDURING HEAVY CHECK, FOUND THE CARGO DOOR SILL HAS CORROSION. THE ACFT WAS REMOVED FROM SERVICE. R & R THE CARGO DOOR SILL IAW SRM 51-40-02. THE OPS CHECKED GOOD. THE ACFT WAS RETURNED TO SERVICE.Jun 4, 2013 · N664MS · Emb EMB145LR · Fuselage Miscellaneous Structure
Back to N664MS