N995CF
Service difficulty reports · 505
Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE n_number = 'N995CF' AND registry_match = 'registration' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE n_number = 'N995CF' AND registry_match = 'registration' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR RRXA98513Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 780 WITH MISDRILLED HOLE BETWEEN LONGERONS 9 AND 10 RIGHT. FABRICATED AND INSTALLED REPAIR DOUBLER IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R49, DC-8 SRM 53-2-0 AND 51-1-1A.SDR RRXA98512Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 760 WITH MISDRILLED HOLE AT LONGERON 5 RIGHT. FABRICATED AND INSTALLED REPAIR IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R48.SDR RRXA98511Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 822 WITH MISDRILLED HOLE BETWEEN LONGERONS 7 AND 8 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND FILLER IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R76, DC-8 SRM 51-1-20, 53-2-0 AND AREA TREATED IAW DC-8 SRM 51-SDR RRXA98510Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1280 WITH MISDRILLED HOLES AT LONGERONS 10, 11 AND 12 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND STRAPS IAW FAA APPROVED ACMI SKETCHES SK98381 AND SK98382, DC-8 SRM 51-1-21 AND AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98509Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 798 WITH MISDRILLED HOLES AT LONGERONS 7, 8, 9, 10, 11, 14, 15 AND 21 RIGHT. FABRICATED AND INSTALLED REPAIR IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R68, DC-8 SRM 51-1-20D AND TREATED AREA IAW DC-8 SRM 51-1-8.SDR RRXA98508Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 640 WITH MISDRILLED HOLE ABOVE LONGERON 21 RIGHT. FABRICATED AND INSTALLED REPAIR IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R01, DC-8 SRM 51-1-20D AND TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98505Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 798 WITH MISDRILLED HOLE AT LONGERON 11 LEFT. FABRICATED AND INSTALLED REPAIR STRAPS IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R111, DC-8 SRM 51-1-20D AND TREATED AREA IAW DC-8 SRM 51-1-8.SDR RRXA98504Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 940 WITH MISDRILLED HOLES BETWEEN LONGERONS 9 AND 12 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLES, SHIMS AND STRAPS IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R86, DC-8 SRM 51-1-21 AND TREATED AREA IAW DC-8 SRM 5SDR RRXA98503Frame · misdrilledDURING MAINTENANCE VISIT FOUND FRAME 780 WITH MISDRILLED HOLE AT LONGERON 11 RIGHT. FABRICATED AND INSTALLED REPAIR DOUBLER IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R49, HEAT TREATED IAW DC-8 SRM 51-1-1, INSTALLED IAW DC-8 SRM 51-1-21 AND TREATED IASDR RRXA98502Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1320 WITH MISDRILLED HOLE BETWEEN LONGERONS 19 AND 20 RIGHT. REPAIRED FRAME IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R23, DC-8 SRM 51-1-21 AND TREATED AREA IAW DC-8 SRM 51-1-8.SDR RRXA98501Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1100 WITH MISDRILLED HOLE AT LONGERON 14 LEFT. FABRICATED AND INSTALLED REPAIR DOUBLED IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R33, DC-8 SRM 51-1-21 AND AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98500Angle · corrodedDURING MAINTENANCE VISIT, FOUND VERTICAL TO HORIZONTAL PRESSURE WEB ATTACH ANGLE CORRODED AT FS 69 RBL 12 TO 16. REMOVED DAMAGED SECTION OF ATTACH ANGLE, FABRICATED AND INSTALLED NEW SECTION OF ATTACH ANGLE AND SPLICE REPAIR IAW FAA APPROVED DER COTNEY ENGINESDR RRXA98499Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1080 WITH MISDRILLED HOLES AT LONGERONS 8 AND 10 LEFT. FABRICATED AND INSTALLED REPAIR STRAPS IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R38, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98498Skin · crackedDURING MAINTENANCE VISIT, FOUND FUSELAGE SKIN CRACKED AT FS 300 TO 320 BETWEEN LONGERONS 9 AND 10 LEFT. REMOVED DAMAGED SKIN, FABRICATED AND INSTALLED REPAIR DOUBLER AND FILLER IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E77-R04.SDR RRXA98497Floor · crackedDURING MAINTENANCE VISIT, FOUND FLOOR PANEL WITH CRACKS THROUGH BOLT HOLES AT FS 435 TO 445 LBL 60. FABRICATED AND INSTALLED REPAIR IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH SK98418, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98496Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME WITH MISDRILLED HOLES AT LONGERONS 4, 5, 9, 10, 11 AND 13 RIGHT. FABRICATED AND INSTALLED REPAIRS IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R80, DC-8 SRM 51-1-21 AND AREAS TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98495Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 834 WITH MISDRILLED HOLE AT LONGERON 15 RIGHT. FABRICATED AND INSTALLED REPAIR IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R79.SDR RRXA98494Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1420 WITH MISDRILLED HOLE AT LONGERON 19 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND SHIM IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R26, DC-8 SRM 51-1-21 AND AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98493Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1300 WITH MISDRILLED HOLE AT LONGERON 20 RIGHT. FABRICATED AND INSTALLED REPAIR IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R22, DC-8 SRM 53-2-0 AND 51-1-21.SDR RRXA98492Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 500 WITH MISDRILLED HOLE BETWEEN LONGERONS 16 AND 17 LEFT. FABRICATED AND INSTALLED REPAIR ANGLE AND SHIM IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R66, DC-8 SRM 53-2-0 AND 51-1-21.SDR RRXA98491Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 580 WITH MISDRILLED HOLE AT LONGERON 9 LEFT. FABRICATED AND INSTALLED REPAIR ANGLES, FILLER AND SHIM IAW FAA APPROVED ACMI SKETCH SK 98362, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98490Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1280 WITH MISDRILLED HOLE AT LONGERON 13 RIGHT. FABRICATED AND INSTALLED REPAIR STRAPS, GUSSET AND FILLER IAW FAA APPROVED ACMI SKETCH SK98383, DC-8 SRM 51-1-21 AND TREATED AREA IAW DC-8 SRM 51-1-8.SDR RRXA98489Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 781 WITH MISDRILLED HOLE BETWEEN LONGERONS 8 AND 9 LEFT. FABRICATED AND INSTALLED REPAIR IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R106.SDR RRXA98488Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 280 WITH MISDRILLED HOLE BETWEEN LONGERONS 13-14 RIGHT. FABRICATED AND INSTALLED REPAIR IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R31, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98487Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1400 WITH MISDRILLED HOLES AT LONGERONS 18, 20 AND 21 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND SHIM IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R27.SDR RRXA98558Switch · inopON APPROACH, NO GREEN NOSE LIGHT INDICATION, DOORS NOT LATCHED AND GEAR NOT LATCHED LIGHTS ARE ON, CYCLED THE GEAR SEVERAL TIMES, NO HELP. ACCOMPLISHED QRH PROCEDURES, PREFORMED EMERGENCY LANDING. PREFORMED T/S TO LANDING GEAR POSITION AND WARNING SYS. FOUNSDR RRXA98486Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 450 MISDRILLED AT LONGERON 3 LEFT. REMOVED DAMAGED AREA, FABRICATED NEW RING AND BRACKET IAW ROSEMBALM DRAWING NR 44212, TREATED AND PRIMED IAW DC-8 SRM 51-1-8. INSTALLED RING AND BRACKET IAW DC-8 SRM 51-1-20D AND 53-2-0SDR RRXA98485Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1240 MISDRILLED BETWEEN LONGERONS 7 AND 9 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND SHIM IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R46 AND DC-8 SRM 51-1-21.SDR RRXA98484Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1440 WITH MISDRILLED HOLES AT LONGERONS 5A-7 LEFT. FABRICATED AND INSTALLED REPAIR ANGLE AND STRAP IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R47.SDR RRXA98483Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1340 WITH HOLE IN RADIUS BETWEEN LONGERONS 10 AND 11 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND SHIM IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R84, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98482Floor · puncturedDURING MAINTENANCE VISIT, FOUND FLOOR PANEL AT STA 1423 BL 0 PUNCTURED. FABRICATED AND INSTALLED REPAIR ANGLE IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH SK98541 AND DC-8 SRM 51-1-21, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98481Wedge · creasedDURING MAINTENANCE VISIT, FOUND RT INBOARD FLAP WEDGE AFT CENTER UPPER SKIN STA XCW26.75 CREASED. REMOVED DAMAGED AREA, FABRICATED AND INSTALLED REPAIR DOUBLER AND FILLER IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R58.SDR RRXA98480Vane · crackedDURING MAINTENANCE VISIT, FOUND LT O/B SLOT LEADING EDGE CRACKED IN TWO PLACES. ROUTED OUT CRACKS ON SLOT VANE AT STA X0LD025.5 AND X0LD014.75, DRILLED AND COUNTERSANK NEW HOLES ON EACH SIDE OF CLEAN UP. INSTALLED NEW FASTENERS IAW FAA APPROVED DER COTNEY ENSDR RRXA98479Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1520 WITH MISDRILLED HOLES AT LONGERONS 8 AND 9 RIGHT. FABRICATED AND INSTALLED REPAIR IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R83.SDR RRXA98478Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1500 WITH MISDRILLED HOLES AT LOWER AFT DOOR FRAME. FABRICATED AND INSTALLED REPAIR ANGLE AND CLIP, INSTALLED NEW CUSP WEB AND FITTING IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R99 AND RFTS 98-420.SDR RRXA98477Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1340 WITH MISDRILLED HOLES BETWEEN LONGERONS 6 AND 9 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND SHIM IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R84, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98476Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1140 WITH MISDRILLED HOLE IN RADIUS AT LONGERONS 16 AND 19 RIGHT. FABRICATED AND INSTALLED STRAP AND SHIM IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R07, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98475Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1020 WITH MISDRILLED HOLES BETWEEN LONGERONS 7 AND 9 RIGHT. FABRICATED AND INSTALLED REPAIR STRAP IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R81, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98474Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1000 WITH MISDRILLED HOLES AND GOUGES BETWEEN LONGERONS 7 AND 11 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLES IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R82.SDR RRXA98473Frame · chafedDURING MAINTENANCE VISIT, FOUND FRAME 1586 CHAFED AND DRILL MARKS AT LONGERON 27 TO 31 LEFT. REMOVED FASTENERS AND BLENDED FRAME, FABRICATED AND INSTALLED REPAIR DOUBLER IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R61.SDR RRXA98472Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1260 WITH MISDRILLED HOLES IN RADIUS AT LONGERONS 8, 9, 11 AND 13 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND FILLER IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R71, HEAT TREATED ANGLE IAW DC-8 SRM 51-1-1, ARESDR RRXA98471Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1220 WITH MISDRILLED HOLES IN RADIUS BETWEEN LONGERONS 7 AND 11 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND SHIM IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R72, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98470Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1040 WITH MISDRILLED HOLES AT LONGERONS 7 AND 8 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND FILLER IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R73 AND DC-8 SRM 51-1-21, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98469Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1040 WITH HOLE IN RADIUS BETWEEN LONGERONS 10 AND 11 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE AND FILLER IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R73, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98468Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 717 WITH MISDRILLED HOLES AT LONGERONS 9 AND 10 LEFT. ALSO LONGERON 11 LEFT INTERCOSTAL MISDRILLED IN THE RADIUS. REMOVED CLIPS AND LOOSENED STRAPS, PLUGGED MISDRILLED HOLES IAW DC-8 SRM 51-1-21, FABRICATED AND INSTALLEDSDR RRXA98467Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 1100 WITH MISDRILLED HOLES AT LONGERONS 8 RIGHT AND BETWEEN LONGERONS 12 AND 13 RIGHT. FABRICATED AND INSTALLED REPAIR ANGLE, STRAPS AND FILLER IAW FAA APPROVED ACMI SKETCH SK98374 AND DC-8 SRM 51-1-21, AREA TREATED IAW DSDR RRXA98452Frame · misdrilledDURING MAINTENANCE VISIT, FOUND HOLE IN RADIUS OF FRAME 1240 BETWEEN LONGERONS 11 AND 12 RIGHT. PLUGGED HOLE IN FRAME IAW FAA APPROVED DER COTNEY ENGINEERING RFTS 98-351 DATED 7-22-98.SDR RRXA98451Frame · misdrilledDURING MAINTENANCE VISIT, FOUND FRAME 780 MISDRILLED HOLES BETWEEN LONGERONS 18, 19, 20 RIGHT. FABRICATED AND INSTALLED GUSSETS AND SPLICES IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R105, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA98450Frame · damagedDURING A MAINTENANCE VISIT, FOUND A HOLE IN RADIUS OF FRAME STA 834 AT LONGERON 11R. REMOVED TIE PLATE, INSTALLED FASTENER IN HOLE, REINSTALLED TIE PLATE IAW FAA APPROVED DER COTNEY ENGINEERING SKETCH E84-R78, AREA TREATED IAW DC-8 SRM 51-1-8.SDR RRXA99193Angle · corrodedDURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE TO FLOORBEAM ATTACHMENT ANGLE AT STA 759 BETWEEN BL 54 LEFT TO BL 64, DAMAGED BEYOND LIMITS IAW DC-8 SRM. REMOVED DAMAGED ANGLE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED NEW ANGLE IAW DC-8
Back to N995CF