N811AL, cancelled Jan 29, 2018

Service difficulty reports · 170

Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE n_number = 'N811AL' AND deregistration_id = 'N811AL-2018-01-29'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR RRXA010055Warning System · activatedJUST PRIOR TO STARTING APPROACH EXPERIENCE FIRE WARNING ON NR 1 ENGINE FOLLOWED QRH. SHUT DOWN ENGINE AND BOTH BOTTLES FIRED. REPAIRED DAMAGED WIRING AT P10-7000 TO AFT FIRE LOOP ON NR 1 ENGINE IAW DC-8 M/M 20-50-1. CK'D ALL WIRING AND FIRE LOOPS ON NR 1 ENJun 27, 2001 · N811AL · Doug DC871 · Fire DetectionSDR RRXA011047Element · faultyINTERMITTENT FIRE INDICATION ON NR 1 ENG FIRED BOTH BOTTLES AND SHUT DOWN ENG FIRE INDICATIONS STILL WERE INTERMITTENT. WHEN FIRE LIGHT IN HANDLE INTERMITTENT WENT OUT, FIRE TEST WOULD NOT TEST. REMOVED AND REPLACED NR 1 ENG FIRE SENSING ELEMENTS IAW DC-8 Jun 13, 2001 · N811AL · Doug DC871 · Fire DetectionSDR RRXA010008Tire · failedRIGHT MAIN GEAR TIRES BLEW ON LANDING. REMOVED AND REPLACED RT MLG WHEEL AND TIRE ASSYS IAW M/M 32-40-1 (TIRE POSITIONS 4, 5, 7, 8).Feb 6, 2001 · N811AL · Doug DC871 · TireSDR RRXA001084Landing Gear · vibrationAFTER RETRACTION OF GEAR LOUD NOISE AND VIBRATION FROM NOSE GEAR AREA CYCLED GEAR NO NOISE WHEN EXTENDED. JACKED AIRCRAFT IAW DC-8 M/M CH 7-11-0 PERFORMED GEAR SWING IAW DC-8 M/M CH 32-30-0 NOSE GEAR STRUT/DOOR'S OPS NORMALDec 6, 2000 · N811AL · Doug DC871 · Nose/Tail Landing GearSDR RRXA001080Fire Loop · malfunctionedAT TOP WHEN RETARDED THROTTLES #3 ENG HAD STEADY FIRE WARNING (BELL & LIGHT) SHUT DOWN ENG. AFTER SHUT DOWN AND DISCHARGING AGENT, FIRE WARNING CONTINUED. ***CORRECTIVE ACTION *** FOUND FIRE ELEMENT READING LOW RESISTANCE PER MM 26-11-2. R&R FIRE ELEMENT IAWNov 8, 2000 · N811AL · Doug DC871 · Fire DetectionSDR RRXA001064Warning System · malfunctionedREJECTED T/O DUE TO NO ELEVATOR CHECK, ASKED FOR FREIGHT REWEIGH (120 KNOTS). PERFORMED REJECTED T/O INSPECTION IAW EWA WORK CARD SP001. NO DEFECTS NOTED. INSPECTED ELEVATOR IAW MM 27-30-1. NO DEFECTS NOTED.Oct 10, 2000 · N811AL · Doug DC871 · Elevator Control SystemSDR RRXA003051Trunnion · crackedDURING A MAINTENANCE VISIT FOUND A CRACK AND CORROSION DAMAGE TO THE NOSE W/W RT. TUNNEL NOSE GEAR TRUNNION ATTACH FITTING AT STA X=+20, Y=-12 Z=-25, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SSep 15, 2000 · N811AL · Doug DC871 · Main Landing Gear Attach SectionSDR RRXA003053Seat Track · corrodedDURING A MAINTENANCE VISIT FOUND BROKEN OFF SCREWS AND CORROSION DAMAGE TO THE SEAT TRACK FLANGE AT STA Y=70-280 & X=+60, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART ASep 8, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA003766Doubler · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE AFT SURFACE REAR SPAR LWR CAP AT STA XRS -578, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLSep 6, 2000 · N811AL · Doug DC871 · Fuselage Main, Plate/SkinSDR RRXA003055Splice · crackedDURING A MAINTENANCE VISIT FOUND A 1/2 INCH CRACK LEADING FROM FASTENER HOLE ON THE THROUGH ACCESS HOLE 506A AT STA XW 408 AND XW 393 NR 8 UPPER STRINGER SPLICE, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABSep 6, 2000 · N811AL · Doug DC871 · Fuselage Miscellaneous StructureSDR RRXA003054Retainer · crackedDURING A MAINTENANCE VISIT FOUND CRACKED, BROKEN AND CORROSION DAMAGE TO THE MAIN CARGO DOR SEAL RETAINERS, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLEDSep 6, 2000 · N811AL · Doug DC871 · Cargo/Baggage DoorsSDR RRXA003052Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMGE TO THE SUB-FLOOR PANEL AT STA 220-360 FROM RBL 45 TO RBL 49, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLEDSep 6, 2000 · N811AL · Doug DC871 · Fuselage Main, Floor BeamSDR RRXA002983Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMGE TO THE SUB FLOOR PANEL AT STA 80-220 AND LBL 25 - LBL 45, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 53-2-0.Aug 31, 2000 · N811AL · Doug DC871 · Fuselage Main, Plate/SkinSDR RRXA002982Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMGE TO THE SUB FLOOR PANEL FROM STA 220-360 AND RBL 25 - RBL 45, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 51-1-Aug 31, 2000 · N811AL · Doug DC871 · Fuselage Floor PanelSDR RRXA002991Threshold · crackedDURING A MAINTENANCE VISIT FOUND A CRACKED, BENT AND RIVET DRILLED OFF THE LT L3 DOOR SILL, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 29, 2000 · N811AL · Doug DC871 · Fuselage Miscellaneous StructureSDR RRXA002990Fastener · damagedDURING A MAINTENANCE VISIT FOUND A PARTIAL HI-LOK DRILLED AT RT LWR WING I/B NR 4 PYLON, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 29, 2000 · N811AL · Doug DC871 · Wing Miscellaneous StructureSDR RRXA002989Boss · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE MLG SHOCK STRUT ASSY RETRACT PIN BOSS WHICH MEANS MA-AI-3210-01:03 NEEDS TO BE C/W, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 29, 2000 · N811AL · Doug DC871 · Main Landing Gear Strut/Axle/TruckSDR RRXA002987Angle · crackedDURING A MAINTENANCE VISIT FOUND A CRACKED TO THE CUSP KICK PLATE LT ANGLE AT STA 1560 - 1580, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 29, 2000 · N811AL · Doug DC871 · Fuselage Miscellaneous StructureSDR RRXA002986Spar · damagedDURING A MAINTENANCE VISIT FOUND 7 DEFORMED BOLT HOLES TO THE RT CENTER AUX TANK AFT LT INNER ACCESS HOLE UPPER REAR SPAR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 29, 2000 · N811AL · Doug DC871 · Wing SparSDR RRXA002985Spar · damagedDURING A MAINTENANCE VISIT FOUND 4 DEFORMED BOLT HOLES TO THE LT CENTER AUX TANK AFT RT INNER ACCESS HOLE UPPER REAR SPAR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 29, 2000 · N811AL · Doug DC871 · Wing SparSDR RRXA002984Threshold · damagedDURING A MAINTENANCE VISIT FOUND SEVERAL ELONGATED HOLES TO THE THRESHOLD ON THE B PIT DOOR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 29, 2000 · N811AL · Doug DC871 · Fuselage Miscellaneous StructureSDR RRXA002999Door · misrepairedDURING A MAINTENANCE VISIT FOUND A BAD REPAIR TO THE LT MAIN LANDING GEAR DOOR AFT LWR CORNER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 28, 2000 · N811AL · Doug DC871 · Landing Gear DoorsSDR RRXA002998Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE FRAME UNDER PRESSURE DECK AT STA -99 AND LBL 60 BELOW L22L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 28, 2000 · N811AL · Doug DC871 · Fuselage Main, FrameSDR RRXA002997Panel · damagedDURING A MAINTENANCE VISIT FOUND A TORN CAMLOCK HOLE AT STA 683A, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 28, 2000 · N811AL · Doug DC871 · Fuselage Miscellaneous StructureSDR RRXA002996Seat Track · brokenDURING A MAINTENANCE VISIT FOUND A BROKEN SEAT TRACK AT STA 680 AND RBL 25, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 28, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA002995Seat Track · brokenDURING A MAINTENANCE VISIT FOUND A BROKEN SEAT TRACK AT STA 1040 AND RBL 25, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 28, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA002994Seat Track · brokenDURING A MAINTENANCE VISIT FOUND A BROKEN SEAT TRACK AT STA 1450 AND RBL 25, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 28, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA002993Longeron · crackedDURING A MAINTENANCE VISIT FOUND A POSSIBLE CRACK TO THE LONGERON AT STA 857 AND L4R AFT SIDE, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 28, 2000 · N811AL · Doug DC871 · Fuselage Main, Longeron/StringerSDR RRXA002992Seat Track · brokenDURING A MAINTENANCE VISIT FOUND A BROKEN SEAT TRACK AT X=0 Y=1477 Z=0, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 28, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA002988Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE SKIN AT MARKER BEACON AT STA 680 - 660 AND L36L TO L35L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 28, 2000 · N811AL · Doug DC871 · Fuselage Main, Plate/SkinSDR RRXA002914Support · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE BULKHEAD MIDDLE RT SUPPORT (HORIZONTAL) AT STA 70, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 51-1-4.Aug 26, 2000 · N811AL · Doug DC871 · Fuselage Main, BulkheadSDR RRXA002917Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE R/H LWR. ACCESS PANEL 547, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-3-0 AND EO 00-196.Aug 25, 2000 · N811AL · Doug DC871 · Fuselage Main, Plate/SkinSDR RRXA002916Panel · delaminatedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE AND FASTENERS PULLING THROUGH THE CENTER PANEL BETWEEN MAIN GEAR DOOR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-Aug 25, 2000 · N811AL · Doug DC871 · Fuselage Main, Plate/SkinSDR RRXA002915Web · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO BOTH SIDES ON THE L/H FLOOR BEAM PRESS WEB AT STA 857 AND LONGERON 0 TO =60, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-Aug 25, 2000 · N811AL · Doug DC871 · Fuselage Main, BulkheadSDR RRXA002880Trunnion · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE TOP LT. SIDE OF NLG TRUNNION FITTING. ------------------------CX----------------------------Aug 24, 2000 · N811AL · Doug DC871 · Main Landing Gear Strut/Axle/TruckSDR RRXA002879Seat Track · damagedDURING A MAINTENANCE VISIT FOUND ELONGATED LOCK HOLES TO THE F/E LT. SEAT TRACK, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAW DC-8 SRM 51-3-0.Aug 24, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA002878Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE SUB-FLOOR ANGLE AT STA -99 FO'S SIDE RBL 48" 12" BELOW AND RT. OF FO'S RUDDER PEDELS, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1Aug 24, 2000 · N811AL · Doug DC871 · Fuselage Floor PanelSDR RRXA002877Seat Track · wornDURING A MAINTENANCE VISIT FOUND DEEP WEAR AREAS TO THE CAPT. FWD RT. SEAT TRACK, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-3-0.Aug 24, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA002876Web · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE ON SUB-FLOOR WEB BELOW RELAY CONTROL PANEL AT STA 8 0 TO -12 FROM CL TO RBL 68", DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. ---------------------CX----------------------Aug 24, 2000 · N811AL · Doug DC871 · Fuselage Main, Floor BeamSDR RRXA002875Skin · dentedDURING A MAINTENANCE VISIT FOUND A DENT TO THE EXTERIOR SKIN AT STA 1586 BETWEEN L21R-L22R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1Aug 24, 2000 · N811AL · Doug DC871 · Fuselage Main, Plate/SkinSDR RRXA002874Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE SKIN AT STA 1296 AND L21R-L20R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. --------------------CX--------------------Aug 24, 2000 · N811AL · Doug DC871 · Fuselage Main, Plate/SkinSDR RRXA002873Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK AND SHEARED FASTENERS TO THE EXTERIOR FRAME/WEB AT STA 816 AND XCW 69, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLAug 24, 2000 · N811AL · Doug DC871 · Fuselage Main, FrameSDR RRXA002872Skin · dentedDURING A MAINTENANCE VISIT FOUND A DENT TO THE EXTERIOR SKIN AT STA 120 AND L34R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-2-1, 53-2-0.Aug 24, 2000 · N811AL · Doug DC871 · Fuselage Main, Plate/SkinSDR RRXA002871Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE EXTERIOR SKIN BETWEEN STA 742-781 AND L35L-L35R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.Aug 24, 2000 · N811AL · Doug DC871 · Fuselage Main, Plate/SkinSDR RRXA002883Floorbeam · crackedDURING A MAINTENANCE VISIT FOUND A 1 1/4 INCH CRACK TO THE TOP FLOORBEAM AT STA -10 IN COCKPIT AND LBL -10, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-2-0.Aug 23, 2000 · N811AL · Doug DC871 · Fuselage Main, Floor BeamSDR RRXA002882Seat Track · damagedDURING A MAINTENANCE VISIT FOUND ELONGAGED LOCK HOLES AND SCALOPED WEAR AREAS ON THE 2ND OBS SEAT TRACK (RIGHT), DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAW DC-8 SRM 51-3-0.Aug 23, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA002881Intercostal · crackedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE AND A CRACK TO THE RIVETS ON INTERCOSTAL AT STA 5 AND L29R. ----------------------------CX-----------------------------Aug 23, 2000 · N811AL · Doug DC871 · Fuselage Floor PanelSDR RRXA002912Seat Track · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMGE AND BROKEN OFF SCREWS IN TRACK FLANGE ON SEAT TRACK AT STA Y=1360-1580 AND X-60, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATEAug 22, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA002911Seat Track · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE AND BROKEN OFF SCREWS IN TRACK FLANGE TO SEAT TRACK AT STA Y=1360-1580 AND X-46, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATAug 22, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach FittingsSDR RRXA002910Seat Track · brokenDURING A MAINTENANCE VISIT FOUND A LUG BROKEN OUT ON THE SEAT TRACK AT STA 1483 AND X=0, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 51-3-0 AND STC SA180250 AAug 22, 2000 · N811AL · Doug DC871 · Fuselage, Seat/Cargo Attach Fittings
Back to N811AL, cancelled Jan 29, 2018