What happened
The FAA’s narrative, in sentence case. The FAA writes it in capitals and removes private details.
Left brake failed landing. Ran into shallow ditch. Hit pavement edge on taxiway. Folded nose gear. Brake line broke (.4)the pilot stated that after touchdown the left brake failed. Examination of the aircraft revealed that flexible duct tubing showed evidence of cracking. Further examination revealed that there would have been an insufficient amount of fluid in the left main landing gear brake system due to a leak, which would have restricted the operation of the left brake. The pilot reported that per the aircraft logbook, the brake lines had never been replaced. Documents from the manufacturer state the the pressurization system must be inspected every 200 hours or every year for plumbing condition, security, and loose connections. The brake system, per the manufacturer, must also be inspected every 200 hours or every year for leaks, hoses for bulges, and deterioration. The last annual maintenance performed included an inspection of the brake lines without removal of the structural sheet metal that overlies the pressurization system. (-23) failure of left main landing gear brake system.
As the FAA filed it
LEFT BRAKE FAILED LANDING. RAN INTO SHALLOW DITCH. HIT PAVEMENT EDGE ON TAXIWAY. FOLDED NOSE GEAR. BRAKE LINE BROKE (.4)THE PILOT STATED THAT AFTER TOUCHDOWN THE LEFT BRAKE FAILED. EXAMINATION OF THE AIRCRAFT REVEALED THAT FLEXIBLE DUCT TUBING SHOWED EVIDENCE OF CRACKING. FURTHER EXAMINATION REVEALED THAT THERE WOULD HAVE BEEN AN INSUFFICIENT AMOUNT OF FLUID IN THE LEFT MAIN LANDING GEAR BRAKE SYSTEM DUE TO A LEAK, WHICH WOULD HAVE RESTRICTED THE OPERATION OF THE LEFT BRAKE. THE PILOT REPORTED THAT PER THE AIRCRAFT LOGBOOK, THE BRAKE LINES HAD NEVER BEEN REPLACED. DOCUMENTS FROM THE MANUFACTURER STATE THE THE PRESSURIZATION SYSTEM MUST BE INSPECTED EVERY 200 HOURS OR EVERY YEAR FOR PLUMBING CONDITION, SECURITY, AND LOOSE CONNECTIONS. THE BRAKE SYSTEM, PER THE MANUFACTURER, MUST ALSO BE INSPECTED EVERY 200 HOURS OR EVERY YEAR FOR LEAKS, HOSES FOR BULGES, AND DETERIORATION. THE LAST ANNUAL MAINTENANCE PERFORMED INCLUDED AN INSPECTION OF THE BRAKE LINES WITHOUT REMOVAL OF THE STRUCTURAL SHEET METAL THAT OVERLIES THE PRESSURIZATION SYSTEM. (-23) FAILURE OF LEFT MAIN LANDING GEAR BRAKE SYSTEM.
NTSB investigation
The NTSB’s investigation of this event, with its probable cause and findings. Matched to this report by N-number and date.
Other reports on N41NR · 1
Matched to the same aircraft by N-number and date.