19981006040189I

Incident

FAA incident report · Boeing 727-214 · Philadelphia, PA · October 6, 1998

Date
October 6, 1998 · 17:10 local
Place
Philadelphia, PA
Airport
Philadelphia International
Phase of flight
Climb
Operating rules
Air carrier (Part 121)
Operator
C8GA
Aircraft
N227JL
Reported as
Boeing 727214
People aboard
3
Fatal injuries
0
Pilot’s flight hours
11,728 total828 in this make and model213 in the last 90 days

From the FAA’s Accident/Incident Data System (AIDS), through its Aviation Safety Information Portal, as reported. The NTSB investigates accidents separately, and its record of an accident is the fuller one. The aircraft is matched to the registry by N-number and event date, checked against the reported make and model; the registry’s history has gaps, so older matches can be wrong. Compare the reported make and model.

What happened

The FAA’s narrative, in sentence case. The FAA writes it in capitals and removes private details.

(-5)On October 6, 1998, at approximately 17:10 local, crew reported that the horizontal stabilizer jammed at 5.0 degrees nose up at flight level 180 and remained jammed down to 700 feet AGL. The crew dumped approximately 20,000 pounds of fuel and declared an emergency whil returning to the point of departure at kphl. The aircraft landed rwy 9R at approximately 17:37 local without further incident and taxied to the cargo ramp. The arrf responded as a precaution. Initial correction action was to clean and lubricate the stabilizer trim jack screw and gear box, which was found to be dry of lubricant. The stabilizer trim system was ops checked munerous times on the ground and tested ok. Work was conducted by carrier's contractor at kpl, emery world wide airlines. The aircraft was released for a test flight on October 7, 1998, to evaluate the previous corrective action under flight conditions. This flight was unsuccessful. The test flight crew again reported the stabilizer jamming at 1,3,5 and 6 degrees, remaining g at 6 degrees until after landing. Subsequent corrective action was to remove and replace the stabilizer jack screw i/aw B-727 mm 27-40-41 and ops check ok. (Log page 4860, dated October 10, 1998). This corrective action was conducted by a.o.g. services, a contract maintenance provider based out of jfk airport, NY, utilizing a & p mechanics working under their certificates. The aircraft was test flown on October 11, 1998 with no reported discrepancies. All aspects of this investigation were coordinated with the chdo/pmi. privacy data omitted Filed conponent information: jackscrew, p.n: 65-19482-16, s/n: G-10457. Time since new/overhaul: 7662.6 hours/3997 cycles. Installed on aircraft: January 3, 1989 by pan American airways. AEA-FSDO-17 considers this investigation closed.

As the FAA filed it

(-5)ON OCTOBER 6, 1998, AT APPROXIMATELY 17:10 LOCAL, CREW REPORTED THAT THE HORIZONTAL STABILIZER JAMMED AT 5.0 DEGREES NOSE UP AT FLIGHT LEVEL 180 AND REMAINED JAMMED DOWN TO 700 FEET AGL. THE CREW DUMPED APPROXIMATELY 20,000 POUNDS OF FUEL AND DECLARED AN EMERGENCY WHIL RETURNING TO THE POINT OF DEPARTURE AT KPHL. THE AIRCRAFT LANDED RWY 9R AT APPROXIMATELY 17:37 LOCAL WITHOUT FURTHER INCIDENT AND TAXIED TO THE CARGO RAMP. THE ARRF RESPONDED AS A PRECAUTION. INITIAL CORRECTION ACTION WAS TO CLEAN AND LUBRICATE THE STABILIZER TRIM JACK SCREW AND GEAR BOX, WHICH WAS FOUND TO BE DRY OF LUBRICANT. THE STABILIZER TRIM SYSTEM WAS OPS CHECKED MUNEROUS TIMES ON THE GROUND AND TESTED OK. WORK WAS CONDUCTED BY CARRIER'S CONTRACTOR AT KPL, EMERY WORLD WIDE AIRLINES. THE AIRCRAFT WAS RELEASED FOR A TEST FLIGHT ON OCTOBER 7, 1998, TO EVALUATE THE PREVIOUS CORRECTIVE ACTION UNDER FLIGHT CONDITIONS. THIS FLIGHT WAS UNSUCCESSFUL. THE TEST FLIGHT CREW AGAIN REPORTED THE STABILIZER JAMMING AT 1,3,5 AND 6 DEGREES, REMAINING G AT 6 DEGREES UNTIL AFTER LANDING. SUBSEQUENT CORRECTIVE ACTION WAS TO REMOVE AND REPLACE THE STABILIZER JACK SCREW I/AW B-727 MM 27-40-41 AND OPS CHECK OK. (LOG PAGE 4860, DATED OCTOBER 10, 1998). THIS CORRECTIVE ACTION WAS CONDUCTED BY A.O.G. SERVICES, A CONTRACT MAINTENANCE PROVIDER BASED OUT OF JFK AIRPORT, NY, UTILIZING A & P MECHANICS WORKING UNDER THEIR CERTIFICATES. THE AIRCRAFT WAS TEST FLOWN ON OCTOBER 11, 1998 WITH NO REPORTED DISCREPANCIES. ALL ASPECTS OF THIS INVESTIGATION WERE COORDINATED WITH THE CHDO/PMI. ^PRIVACY DATA OMITTED^ FILED CONPONENT INFORMATION: JACKSCREW, P.N: 65-19482-16, S/N: G-10457. TIME SINCE NEW/OVERHAUL: 7662.6 HOURS/3997 CYCLES. INSTALLED ON AIRCRAFT: JANUARY 3, 1989 BY PAN AMERICAN AIRWAYS. AEA-FSDO-17 CONSIDERS THIS INVESTIGATION CLOSED.