What happened
The FAA’s narrative, in sentence case. The FAA writes it in capitals and removes private details.
On June 16, 2011 at approximately 17:58 LCL a B-757 operated by united airlines sustained substantial damage during push back from gate 73 at San Francisco International Airport, (ksfo). The flight crew reported that they had completed the before push back checklist and had received a clearance from ramp control. The captain released the brakes and informed the ground crew that they were cleared to push back. The standard operating procedure for the ground crew is to signal the boarding bridge operator to retract the bridge and begin the push back when the bridge was clear of the aircraft. The ground crew reportedly failed to signal the bridge operator and began the push back with the boarding bridge in contact with the aircraft. The bridge ramp punctured the fuselage tearing a gash in the skin 3-4 inches deep on the left side forward of door 2L to approximately fuselage station 520 damaging two fuselage ribs. The ground crew tug driver stated that he heard the loading bridge warning bell sounding which indicated to him that the loading bridge was cleared of the aircraft. There was no emergency evacuation or injuries and passengers exited normally by portable stairs from the right side of the aircraft.
As the FAA filed it
ON JUNE 16, 2011 AT APPROXIMATELY 17:58 LCL A B-757 OPERATED BY UNITED AIRLINES SUSTAINED SUBSTANTIAL DAMAGE DURING PUSH BACK FROM GATE 73 AT SAN FRANCISCO INTERNATIONAL AIRPORT, (KSFO). THE FLIGHT CREW REPORTED THAT THEY HAD COMPLETED THE BEFORE PUSH BACK CHECKLIST AND HAD RECEIVED A CLEARANCE FROM RAMP CONTROL. THE CAPTAIN RELEASED THE BRAKES AND INFORMED THE GROUND CREW THAT THEY WERE CLEARED TO PUSH BACK. THE STANDARD OPERATING PROCEDURE FOR THE GROUND CREW IS TO SIGNAL THE BOARDING BRIDGE OPERATOR TO RETRACT THE BRIDGE AND BEGIN THE PUSH BACK WHEN THE BRIDGE WAS CLEAR OF THE AIRCRAFT. THE GROUND CREW REPORTEDLY FAILED TO SIGNAL THE BRIDGE OPERATOR AND BEGAN THE PUSH BACK WITH THE BOARDING BRIDGE IN CONTACT WITH THE AIRCRAFT. THE BRIDGE RAMP PUNCTURED THE FUSELAGE TEARING A GASH IN THE SKIN 3-4 INCHES DEEP ON THE LEFT SIDE FORWARD OF DOOR 2L TO APPROXIMATELY FUSELAGE STATION 520 DAMAGING TWO FUSELAGE RIBS. THE GROUND CREW TUG DRIVER STATED THAT HE HEARD THE LOADING BRIDGE WARNING BELL SOUNDING WHICH INDICATED TO HIM THAT THE LOADING BRIDGE WAS CLEARED OF THE AIRCRAFT. THERE WAS NO EMERGENCY EVACUATION OR INJURIES AND PASSENGERS EXITED NORMALLY BY PORTABLE STAIRS FROM THE RIGHT SIDE OF THE AIRCRAFT.