JASC 5315
Service difficulty reports · 44,218
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR CALA2021031600323Floorbeam · corrodedB757-53-3-0579 RH OTBD FLOORBEAM HAS LIGHT CORROSION AT BS1640 RB 44 - RBL 46 REF HAECO GSO NR 9281257 CLEANED AREA ON FLOORBEAM AT BS1640 RBL 44-46 REMOVED .025" ORIGINAL .070", REMAINING .045" FOUND TO BE OUT OF LIMITS PER B757 SRM 53-00-52, REMOVED AND REPLSDR REXA2021041500222Angle · corrodedFS 280 CROSSBEAM J ANGLE CORRODED. RECEIVED PART CERTIFICATION FOR ANGLE P/N CC670-34095-3S AND ATTACHED TO JOB CARD 81532511 OP #257.SDR SWIA202157907Floorbeam · corroded*COCKPIT FLOOR SUPPORT ANGLE AT FS280, BETWEEN LBL12 AND RBL12 HAS CORROSION AND CHAFING. (MARKED) (C-CHECK RO 4/25/2021) REMOVED AND REPLACED FWD COCKPIT FLOOR SUPPORT ANGLE AT FS280, BETWEEN LBL12 AND RBL12 REF CRJ 200 SRM 51-42-06, CRJ 200 SRM 51-42-SDR A6WA202104067735Floorbeam · damagedTOOL MARK COMMON TO FLOOR STRUCTURE WEB AT FS364.00+8 AND LBL28 ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED TOOL MARK ON FLOOR STRUCTURE WEB AT FS364.00+8 AND LBL28 WITH BLEND DIMENSIONS OF 0.600Ï¿½L X 0.500Ï¿½W X 0.027Ï¿½D WITH A REMAINING THICKNESS OR 0.0SDR AALA202103199024Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION OF MAIN CABIN FLOORBEAM T CAP AT STA 947 AND LBL 26.5, MEASURING L=3.6 IN, W=1.2 IN, D=0.078 IN. REPLACED T CAP WITH NEW IAW SRM 53-70-51-2R-5.SDR AALA202103199023Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION OF MAIN CABIN FLOORBEAM T CAP AT STA 947 AND LBL 49.5, MEASURING L=4.0 IN, W=2.2 IN, D=0.08 IN. REPLACED T CAP WITH NEW IAW SRM 53-70-51-2R-5.SDR AALA202103199022Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION OF T CAP ON MAIN CABIN FLOORBEAM AT STA 947 BETWEEN RBL 54 AND LBL 54, MEASURING L=2.0 IN, W=2.2 IN, D=0.077 IN. REPLACED T CAP WITH NEW IAW SRM 53-70-51-2R -5.SDR AALA202103199025Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: FOUND CORROSION ON MAIN CABIN FLOOR BEAM FLANGE, FORWARD SIDE, AT STA 986.5 AND LBL 44.5 TO RBL 44.5 REMOVED CORROSION FOUND TO BE OUT OF LIMITS IAW B737NG 53-70-51-12. REMOVED AND REPLACED ENTIRE "T" CAP IAW B737NG SRM 53-70-51-2SDR IPXA2021041068020Floorbeam · corrodedINSPECTION TYPE:SEGMAIN CABIN FLOOR STRUCTURE FLOOR BEAM I/B OF BEAM Y953 HAS SEVERAL CORRODED SPOTS. DOT 49-49.REMOVED. FABRICATED AND INSTALLED IAW SRM 53-12-15 CONFIG 1 FIG 204.SDR DALA2021031201413Floorbeam · corrodedSHIP 3302 CORROSION FLOOR BEAM -YC1 AT LEVEL FR 73 AT AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM -YC1 LOC. BTW FR.73 TO FR.74 AS PER A330 SRM 51-72. (1752781)SDR REXA2021050500194Floorbeam · crackedDURING REPAIR OF R/H FLIGHT DECK DOOR POST, FOUND R/H FLIGHT DECK FLOOR BEAM ANGLE CRACKED. - REMOVED, LOCATED,DRILLED,AND INSTALLED RH FLOOR BEAM (FLIGHT DECK) ANGLE AND GUSSET P/N:CC670-33199-3,CC670-33467-2 IAW CRJ 700 SRM 57-42-06-001-001-A01,51-40-11-001-SDR FDEA202103110623Floorbeam · corrodedAFT CARGO COMPARTMENT STATION 1902 RIGHT HAND X=-25 TO -40 FLOOR PANEL 187HF SUPPORT FOUND CORRODED. AFT CARGO COMPARTMENT STATION 1902 RIGHT HAND X = -25 TO -40 FLOOR PANEL SUPPORT REPAIR CARRIED OUT AS PER E.A. # 1-5321-T0360340 PART 1 . TITLE : FUSELAGSDR FDEA202103110622Floorbeam · corrodedAFT CARGO COMPARTMENT STATION 1902 RIGHT HAND X= -2 TO -16 FLOOR PANEL 187 FF SUPPORT FOUND CORRODED. AFT CARGO COMPARTMENT STATION 1902 RIGHT HAND X = - 2 TO -16 FLOOR PANEL SUPPORT REPAIR CARRIED OUT AS PER E.A. # 1-5321-T0360340 PART 1 TITLE : FUSELAGE -SDR DALA2021031201405Floorbeam · corrodedSHIP 3235 CORROSION FLOOR BEAM -Y464.8 AND FR68 AT AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM PER A320 SRM 51-72-11. (1752100)SDR DALA2021031101396Floorbeam · corrodedSHIP 3302 CORROSION FLOOR BEAM LOCATED Y953 FR.14 AT FWD GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM Y953 AND FASTENERS LOC BTW FR.11 TO FR.18 FWD GALLEY AREA AS PER A330 SRM 51-42. (1751731)SDR AALA202104019025Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR SUPPORT FRAME LOCATED AT BS 947 LBL 24. REMOVED CORROSION AND BLENDED AREA PER SRM 51-10-02-0G.SDR REXA2021031900156Floorbeam · corrodedFS280 HAS CORROSION AT AFT ANGLE. REMOVED CORRODED AFT ANGLE AND REPLACED WITH NEW ANGLE. IAW CRJ 200 SRM 51-42-21 AND 51-42-06 AND RESTORES TO ORIG FINISH IAW CRJ 200 SRM 53-00-00SDR REXA2021031900155Floorbeam · crackedFS280 LBL9, I/B CLIP IS CRACKED. REMOVED CRACKED ANGLE AND INSTALLED NEW ANGLE(FABRICATED) IAW CRJ200 SRM 51-24-16 AND RESTORED TO ORIG FINISH IAW CRJ 200 SRM 51-21-11, 51-25-16, 51-25-06SDR REXA2021031900154Floorbeam · crackedFS280 RBL9, I/B, O/B CLIPS CRACKED AT FWD AND AFT FLOOR. REMOVED CRACKED CLIPS AND REPLACED WITH NEW FABRICATED CLIPS. IAW 53-21-43 AND 51-24-16SDR SWIA202158761Floorbeam · corrodedAFT CARGO AREA BELOW FLOOR BOARD AT FS 605.00 BETWEEN STR R25 AND STR R24 FLOOR SKIN IS CORRODED JUST AFT OF HEATED DRAIN. (C-CHECK RO 6/11/2021) REPAIRED AFT CARGO BELOW FLOOR SKIN CORROSION AT FS 605.00 BETWEEN STGR 25R AND STGR 24R IAW CRJ-200 SRM 5SDR SWIA202158794Angle · corrodedFS280 J ANGLE IS CORRODED (C-CHECK RO 6/11/2021) BLENDED CORROSION ON J ANGLE IAW CRJ-200 SRM 51-12-00 AND FOUND IT TO BE CORRODED OUT OF LIMITS IAW CRJ-200 SRM 53-11-19 AND 53-00-00. REMOVED CORRODED FS.280.00 J-ANGLE IAW CRJ-200 SRM 51-42-06 AND 51 SDR SWIA202158787Floorbeam · crackedFS280 CROSSBEAM IS CRACKED BETWEEN RBL9 AND RBL18 (C-CHECK RO 6/11/2021) REMOVED AND REPLACED DOUBLER AT FS 280 -4 OF REO 601R53-11-171 REV D DATED 13-FEB-21 IAW CRJ 200 SRM 51-24-36 AND 51-42-21SDR SWIA202158765Angle · crackedFS280 STR3 LENTAL CRACKED (C-CHECK RO 6/11/2021) REMOVED AND REPLACED 2 CLIPS AT JUNCTION OF STR 3L AND FS 280 IAW CRJ 200 SRM 51-42-06 AND 51-42-21. COMPLETED SKYWEST TASK CARD 51-900-1003- SKY AND ATTACHED COMPLETED FORM 337. NO WEIGHT CHANGE NOTED.SDR DALA2021030901352Floorbeam · crackedDURING INSPECTION AFT CARGO COMPARTMENT STA 1109 FLOOR PANEL SUPPORT BEAM CRACK AT LBL 26 AND RBL 26. REPLACED FLOOR SUPPORT. (LP 1749250)SDR MASA20210405132Floorbeam · corrodedCORROSION ON FLOOR SUPPORT IN STA FS=280 BETWEEN STGR 26LH TO 26 RH AT MAIN AVIONICS COMPARTMENT| PART CONDITION REPLACED.SDR DALA2021030801334Floorbeam · corrodedSHIP 3302 CORROSION FLOOR BEAM LOCATED Y450 FR.14 AT FWD GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM AS PER SRM A330 51-72. (1748287)SDR SWIA2021071459528Floorbeam · corrodedFS549 FLOOR CROSS BEAM IS CORRODED AT RBL9. (C-CHECK RO 7/10/2021) REPAIRED FS 549 RBL9 FLOOR CROSS BEAM IAW REO 670-53-31-633 REV --, DATED 2021-06-14. COMPLETED MAJR REPAIR TASK CARD 51-900-1002-SKY AND FORM M-337, NO CHANGE TO WEIGHT. REFERENCE CONTISDR SWIA202159527Floorbeam · corrodedRBL9 FLOOR BEAM IS CORRODED AT FS549. (C-CHECK RO 7/10/2021) REPAIRED RBL 9 AT FS 549 FLOOR BEAM IAW REO 670-53-31-633 REV --, DATED 2021-06-14. COMPLETED MAJOR REPAIR TASK CARD 51-900-1002-SKY AND FORM M-337, NO CHANGE TO WEIGHT. SEE CONTINUATION CARD SDR SWIA2021071459526Floorbeam · corrodedLBL9 FLOOR BEAM IS CORRODED AT FS549. (C-CHECK RO 7/10/2021) REMOVED, LOCATED, AND REPLACED FLOOR BEAM LBL 9 FROM FS 476-573 IAW MHI RJ REO 670-53-31-633 REV -- DATED 2021-04-30 AND CRJ 700 SRM 53-00-41-201-001-A01. COMPLETED TASK CARD 51-900-1002-SKY ASDR SWIA202159525Floorbeam · corrodedRBL9 FLOOR BEAM IS CORRODED AT FS517. (C-CHECK RO 7/10/2021) REPAIRED RBL 9 FLOOR BEAM AT FS 517 IAW REO 670-53-31-633 REV --, DATED 2021-06-14, COMPLETED MAJOR REPAIR TASK CARD 51-900-1002-SKY AND FORMM-337, ADDED 0.2 POUNDS.SDR SWIA2021071459497Floorbeam · corrodedFS549 FLOOR CROSS BEAM IS CORRODED AT LBL9. (C-CHECK RO 7/10/2021) REPAIRED FS 549 CROSS BEAM AT LBL9 IAW REO 670-53-31-633 REV --, DATED 2021-06-14.SDR REXA2021050500193Floorbeam · crackedDURING REPAIR OF L/H FLIGHT DECK DOOR POST, FOUND L/H FLIGHT DECK FLOOR BEAM ANGLE CRACKED. - REMOVED LH FLIGHT DECK FLOORBEAM ANGLE IAW CRJ 700 SRM 51-42-06-001-001-A01. LOCATED AND DRILLED NEW SERVICEABLE ANGLE PN CC670-33199-48 IAW CRJ 700 SRM 51-40-11-001-SDR SWIA2021071459564Floorbeam · corrodedAVI BAY FLOORBOARD SUPPORT ANGLE CORRODED AT AFT SIDE OF FS 280.00 (C-CHECK RO 7/10/2021) REMOVED AND REPLACED FS 280 AVIONICS CBAY FLOORBOARD SUPPORT BRACKET IAW CRJ 700 SRM 51-42-06-001-001-A01SDR SWIA2021071459547Floorbeam · corrodedFS 280.00 BEAM CORRODED IN MULTIPLE SPOTS BETWEEN LBL9 AND RBL9. (C-CHECK RO 7/10/2021) REMOVED AND REPLACED UPPER SPLICE STRIP PN: CC670-34097-1 IAW CRJ 700 SRM 51-42-10-001-001-A01, CLEANED AND INSPECTED 280 FLOOR BEEM BETWEEN LBL 9.0" AND RBL 9.0" ANSDR DALA2021030801299Floorbeam · corrodedSHIP 3253 CORROSION FLOOR BEAM +Y765 AT LEVEL FR68 AT AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM PER A320 SRM 51-72-11 AND SRM 51-42-11. (1746992)SDR SWIA202157197Floorbeam · corrodedLH COCKPIT FLOOR BEAM AT FS.274 LBL12 HAS CORROSION AND IS CRACKED AT ATTACHING FLANGE (FS.280 LOWER WEB AND POST ATTACHING POINT). (C-CHECK RO 4/1/2021) REMOVED PREVIOUS REPAIR AND REPLACED WITH NEW REPAIR PARTS, REF CRJ 700 SRM 53-11-43-201-003-A01, TYPSDR SWIA202157196Floorbeam · crackedRH COCKPIT FLOOR BEAM AT FS.274 RBL12 HAS CORROSION AND IS CRACKED AT ATTACHING FLANGE (FS.280 LOWER WEB AND POST ATTACHING POINT). (C-CHECK RO 4/1/2021) REMOVED PREVIOUS REPAIR AND REPLACED WITH NEW REPAIR PARTS, REF CRJ 700 SRM 53-11-43-201-003-A01, TYPSDR DALA2021030901350Floorbeam · corrodedDURING INSPECTION MAINTENANCE FOUND PASSENGER CABIN FLOOR STRUCTURE CORROSION AT STA 246 LBL13. REPAIRED PER SRM. (LP 1749166)SDR A6WA202103087700Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR ANGLE AT FS461, RBL 42 ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION ON PRESSURE FLOOR ANGLE FS461, RBL 42, PERFORMED HFEC INSPECTION WITH NO INDICATIONS EVALUATED BLEND AND FOUND WITHIN LIMITS REF REO601R-53-41-66SDR A6WA202103087703Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR ANGLE AT FS473.15+4.5, RBL 43 ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION ON PRESSURE FLOOR ANGLE FS473.15+4.5, RBL 43, PERFORMED HFEC INSPECTION WITH NO INDICATIONS. EVALUATED BLEND AND FOUND WITHIN LIMITS REF RSDR A6WA202103087699Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR ANGLE AT FS439.00+5, RBL 42 ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION ON PRESSURE FLOOR ANGLE FS439.00+5, RBL 42, PERFORMED HFEC INSPECTION WITH NO INDICATIONS EVALUATED BLEND AND FOUND WITHIN LIMITS REF REO601SDR A6WA202103087702Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR ANGLE AT FS473.15+15, RBL 43 ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION ON PRESSURE FLOOR ANGLE FS473.15+15, RBL 43, PERFORMED HFEC INSPECTION WITH NO INDICATIONS. EVALUATED BLEND AND FOUND WITHIN LIMITS REF REOSDR A6WA202103087695Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR SILL AT FS499.00+10.5, LBL 43 ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION ON PRESSURE FLOOR ANGLE FS499.00+10.5, LBL 43, PERFORMED HFEC INSPECTION WITH NO INDICATIONS, PERFORMED UT THICKNESS CHECK, REMAINING MATERSDR A6WA202103087701Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR ANGLE AT FS461.00+7, RBL 42 ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION ON PRESSURE FLOOR ANGLE FS461.00+7, RBL 42, PERFORMED HFEC INSPECTION WITH NO INDICATIONS. EVALUATED BLEND AND FOUND WITHIN LIMITS REF REO60SDR CALA2021030500259Floorbeam · corrodedB767-53-3-7062 CABIN STA 325 LBL 53 FLOOR BEAM FOUND CORRODED AS MARKED REF NR LP 9131170 CABIN STA 325 LBL 30" TO LBL 60" FLOOR BEAM REPLACED AS PER SRM 53-00-51 REPAIR 1 FIG 201 AND ATTACH FORM 44.0008 MAINTENANCE WORKSHEET ITEM 1-30.SDR DALA2021030401254Floor Support · corrodedDURING INSPECTION MAINTENANCE FOUND CORROSION LEVEL 2 ON FLOOR STRINGERS RBL 7.55, RBL 10.45 AND RBL 16.10, ON STA 1470 AT AFT CARGO COMPARTMENT AND REPAIRED PER SRM. (LP 1745303)SDR SWIA202159484Floorbeam · corrodedCORROSION ON FLOORBEAM AT FS 1031 AT LBL 27 (C-CHECK RO 7/10/2021) REPAIRED LBL27 FLOOR BEAM AT FS1031 IAW CRJ 700 SRM 53-00-41-201-001-A01. COMPLETED FORM M-337 AND MAJOR REPAIR REPAIR TASK CARD 51-900-1002-SKY, NO WEIGHT CHANGESDR SWIA202159483Floorbeam · corrodedCORROSION ON FLOOR JUST IN FRONT OF FS 1098 BETWEEN RBL 27 TO LBL 27 (C-CHECK RO 7/10/2021) REPAIRED FLOOR SILL IN FRONT OF FS1098 BTWN RBL27 AND LBL27 IN COMPLIANCE WITH REO 670-53-61-1080, REV--, DATED 2014-11-06 AND REO 670-53-61-1865, REV --, DATED SDR REXA2021041300200Floorbeam · corrodedSTA 280 FLOORBEAM CORRODED ON FWD SIDE IN SEVERAL AREAS FROM RBL 5 TO LBL 11. REMOVED & REPLACED LH AND RH FS 280 BEAMS IAW CRJ 900 SRM 51-42-06-001-001-A01 & 51-42-22-001-001-A01. WVAC EMP #603145SDR ASAA2021030334483Floorbeam · corrodedCORROSION ON FLOORBEAM STA 947.5 JUST O/B OF LAV D INBOARD AFTMOUNT FITTING. DOT Z617. GROUNDED - YES. REMOVED CORROSION IAW B737-800 SRM 53-70-51-1A.1. ORIG MAT. IS .180, REMAINING MAT IS .095. MAT LOSS OF .085 IS BEYOND ALLOWABLE LIMITS. REMOVEDUPPER T-CAP C
Back to JASC 5315