JASC 5315

Service difficulty reports · 44,218

Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5315'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR A6WA202012237478Floorbeam · corrodedPRESSURE FLOOR PANEL AT FS 439+9, RBL 42, STR 17, W/L 73.50 HAS CORROSION. AIRCRAFT REMOVED FROM SERVICE. REMOVED CORROSION FROM FLOOR PANEL (2 EA) POSITIONS AT FS 439+9, RBL 42, STR 17, W/L 73.50. REWORKED DIMENSIONS (P1)=0.8 W X 1.1 L, (P2)=1.1 W X 1.8 L,Dec 13, 2020 · N457AW · Cndair CL6002B19SDR A6WA202012237477Floorbeam · corrodedPRESSURE FLOOR ANGLE AT FS 424+3, RBL 38, W/L 73.50, STR 17 HAS CORROSION. AIRCRAFT REMOVED FROM SERVICE. REMOVED CORROSION FROM FLOOR ANGLE AT FS 424+3, RBL 38, W/L 73.50, STR 17. REWORKED DIMENSION=0.80 W X 2 L, REF REO 601R-53-41-666 REV (C). PERFORMEDDec 13, 2020 · N457AW · Cndair CL6002B19SDR A6WA202012237479Floorbeam · corrodedPRESSURE FLOOR PANEL AT FS 499, RBL 35 TO RBL 43, W/L 73.50, STR 17 HAS CORROSION. AIRCRAFT REMOVED FROM SERVICE. REMOVED CORROSION FROM FLOOR PANEL AT FS 499, RBL 35 TO RBL 43, W/L 73.50, STR 17. REWORKED DIMENSION=0.9 W X 8.1 L, REF REO 601R-53-41-666 REVDec 13, 2020 · N457AW · Cndair CL6002B19SDR A6WA202012237476Floorbeam · corrodedPRESSURE FLOOR ANGLE AT FS 461 TO FS 484, RBL 35 TO RBL 43, W/L 73.50, STR. 17 HAS CORROSION. AIRCRAFT REMOVED FROM SERVICE. REMOVED CORROSION FROM FLOOR ANGLE (3 EA) POSITIONS AT FS 461 TO FS 484, RBL 35 TO RBL 43, W/L 73.50, STR 17 REWORKED DIMENSIONS (P1)Dec 13, 2020 · N457AW · Cndair CL6002B19SDR A6WA202012237488Floorbeam · corrodedPRESSURE FLOOR ANGLE AT FS 513+14, LBL 40 TO LBL 43, STR 17, W/L 73.50 HAS CORROSION. AIRCRAFT REMOVED FROM SERVICE. REMOVED CORROSION FROM FLOOR ANGLE (3 EA) POSITIONS AT FS 513+14, LBL 40 TO LBL 43, STR 17, W/L 73.50. REWORKED DIMENSIONS (P1)=0.9 L X 0.8 Dec 13, 2020 · N457AW · Cndair CL6002B19SDR SWIA202056178Floorbeam · corroded*CORROSION ON FLOOR SUPPORT BEAM TOP SURFACE AT FS 559.00, LBL 27-36 (C-CHECK) RO 2/9/2021 REMOVED AND REPLACED STRAP BETWEEN LBL27 & 3BL36 @ FS559.00. REF DWG 601R31025 REV N & CRJ200 SRM 51-42-06. COMPLIED WITH TASK CARD 51-900-1003-SKY. LEAK CHECK GOOD.Dec 10, 2020 · N876AS · Cndair CL6002B19SDR SWIA202055649Nut Plate · corrodedMINOR CORROSION AROUND NUTPLATE ON FLOORBEAM AT RBL 9 BETWEEN FS 409.00 TO FS 409.00 +16. C-CHECK RO 1/28/2021. REMOVED AND REPLACED FLOORBEAM CAP, IAW REO 601R-53-31-1166 REV- DATED 2021-01-08. COMPLIED WITH TASK CARD 51-900-1003-SKY AND ATTACHED COMPLETEDDec 10, 2020 · N957SW · Cndair CL6002B19SDR SWIA202055634Floorbeam · corrodedFLOOR BEAM AT RBL 9 HAS MULTIPLE SPOTS OF MINOR CORROSION FROM FS 409.00 +128 TO FS 559.00. C-CHECK RO 1/28/2021. REPLACED FLOORBEAM CAP AT RBL 9 AT FS 409+128 TO FS 559, IAW MHIRJ REO 601R-53-41-2835 REV- DATED 2021-01-17. COMPLETED TASK CARD 51-900-1003-SDec 10, 2020 · N957SW · Cndair CL6002B19SDR SWAA2021011338530Floorbeam · corrodedCORROSION FLOOR BEAM ON BS 328 AT EVEL RBL 48 WL 208 AT FWD GALLEY AREA. REPAIRED FUSELAGE TRANSVERSAL FLOOR BEAM AT BSTA 328 AND BL 0 TO RBL 60 (WL 208)-UPR REPAIR CHORD, IAW EA 53-0816-20 REVISION 0 AND EA NO 21-153-00034 REV IR.Dec 9, 2020 · N434WN · Boeing 7377H4SDR SWIA202055704Floorbeam · corroded* RBL9 PRESSURE FLOOR SUPPORT BEAM LIP CORRODED AT APROX FS 544.0 INBD LIP MARKED (C-CHECK) RO 1/29/2021 REPAIED RBL9 PRESSURE FLOOR SUPPORT BEAM IAW REO 601R-53-41-2831 REV-- DATED 2021-01-07 COMPLIED WITH SKYWEST TASK CARD 51-900-1003-SKYDec 8, 2020 · N447SW · Cndair CL6002B19SDR SWIA202055702Floorbeam · corroded* RBL9 PRESSURE FLOOR SUPPORT BEAM LIP CORRODED AT APROX FS 524.0 INBD/OUTBD LIP MARKED (C-CHECK) RO 1/29/2021 REPAIRED RBL9 PRESSURE FLOOR SUPPORT BEAM AT FS 524.0 IAW REO 601R-53-41-2831 REV-- DATED 2021-01-07. COMPLIED WITH SKYWEST TASK CARD 51-900-1Dec 8, 2020 · N447SW · Cndair CL6002B19SDR SWIA202055701Floorbeam · corroded* RBL9 PRESSURE FLOOR SUPPORT BEAM LIP CORRODED AT APROX FS 457.0 INBD LIP MARKED (C-CHECK) RO 1/29/2021 REPAIRED RBL9 PRESSURE FLOOR SUPPORT BEAM AT FS 457 IAW REO 601R-53-41-2831 REV-- DATED 2021-01-07. COMPLIED WITH SKYWEST TASK CARD 51-900-1003-SKYDec 8, 2020 · N447SW · Cndair CL6002B19SDR SWIA202055699Floorbeam · corroded* LBL9 PRESSURE FLOOR SUPPORT BEAM LIP CORRODED AT APROX FS 484.0 INBD LIP MARKEDREPAIRED LBL9 PRESSURE FLOOR SUPPORT BEAM AT APPROX. F.S 484, CUT AWAY DAMAGED AREA, FABRICATED AND INSTALLED REPAIR PARTS COMPLIED WITH ALL STEPS OF MHIRJ REO 601R-53-41-2830 REVDec 8, 2020 · N447SW · Cndair CL6002B19SDR SWAA2021011338520Floorbeam · corrodedCORROSION FLOOR STRUCTURE FLOOR BEAM LOCATED BS 986.5 AT LEVEL RBL 43 AND LBL 43 WL 208 AT AFT GALLEY AREA. PERFORMED PERMANENT REPAIR ON FLOOR BEAM 986.5 UPPER HORIZONTAL TEE CAP SPLICE AFT GALLEY AREA, IAW EA NR 1-A53-7848 REV: KIT USED P/N 53100011-01. DUDec 8, 2020 · N434WN · Boeing 7377H4SDR AALA202012239001Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE. CORROSION ON FORWARD CABIN FLOOR BEAM AT FR 20 AND -Y254. REPAIRED FLOOR BEAM, PER EA 310391.Dec 8, 2020 · N131NN · Airbus A321231SDR VNAA202012089991Angle · corrodedFS 280 FWD J ANGLE HAS AREAS OF CORROSION. REMOVE, DRILLED AND INSTALLED NEW J ANGLE, IAW CRJ900 SRM 51-42-21, SRM 51-40-11 AND SRM 51-22-06.Dec 8, 2020 · N580NN · Cndair CL6002D24SDR AALA202012089015Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE. CRACK IN PANEL BREAK ASSEMBLY AT STA 537 BETWEEN BL 0 AND RBL 24, MEASURING L=0.5 IN. REPLACED BREAK ASSEMBLY WITH NEW, IAW AARD 51-00-05.Dec 7, 2020 · N963NN · Boeing 737823SDR DALA2020120804019Floorbeam · corrodedCORROSION FLOOR BEAM +Y1447.8 AT LEVEL FR 74 AT AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM +Y1447.8 LOCATED BETWEEN FR 74 TO FR 77 AFT GALLEY AREA, AS PER A330 SRM AND DWG.Dec 7, 2020 · N801NW · Airbus A330323SDR SWIA202055310Floorbeam · corrodedFLOOR CROSS BEAM AT APPROXIMATELY FS 1069.75 AT FLOOR SILL HAS CORROSION, MARKED. C-CHECK RO 1/5/2021. CORROSION ON CROSS BEAM AND RT FLOOR SILL AT FS 1069.75 REMOVED CORROSION, PER CRJ-700 SRM 51-21-06-001-001-A01. COMPLIED WITH ALL STEPS OF REO 670-53-61-Dec 6, 2020 · N788SK · Cndair CL6002C10SDR AALA202012089014Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE. CRACK IN PANEL BREAK ASSEMBLY AT STA 537 BETWEEN BL 0 AND LBL 24, MEASURING L=1.0 IN. REPLACED BREAK ASSEMBLY WITH NEW, IAW AARD 51-00-05-1 AND DRAWING 143A0060.Dec 6, 2020 · N963NN · Boeing 737823SDR FDEA202012063051Angle · crackedFWD LT FRAME STA 246 LBL 50 BELOW FLOOR INTERCOSTAL ANGLE CRACKED. REMOVED AND REPLACED ANGLE P/N 141T5146-16, IAW B767 SRM 51-40-02 AND BAC DWG 141T5600 REV-.Dec 6, 2020 · N110FE · Boeing 7673S2FSDR JR2R20201206738Floorbeam · corrodedFLOOR BEAM CAP ON RBL 9 CORRODED AT FR 87.Dec 6, 2020 · N86312 · Emb ERJ170200LRSDR JR2R20201206653Floorbeam · corrodedFLOOR BEAM CAP ON LBL 9 CORRODED AT FR 87.Dec 6, 2020 · N86312 · Emb ERJ170200LRSDR UIEA2020110602356Floorbeam · corrodedFWD CARGO PIT FLOOR STA 742 BEAM LBL 23 IN BOTTOM AFT SIDE TOP FLANGE HAS 3 SQUARE IN OF EXFOLIATED CORROSION. REMOVED CORROSION ON BOTTOM SIDE OF FLANGE 'J' CHANNEL AT STA 742 LBL 23 IN AN AREA 6.5"X1", IAW B767 SRM 51-10-02. ORIGINAL MATERIAL 100, REMAININDec 5, 2020 · N650GT · Boeing 767231SDR SWAA2021021134541Floorbeam · corrodedCORROSION STRAP FLOOR STRUCTURE LOCATED BS887 BETWEEN LBBL8.1 TO RBBL21 AND WL156.5 AFT CARGO COMPARTMENT / REPLACED TEE ASSY FLOOR STRUCTURE LOCATED BS 887 BTW LBBL 8-1 TO RBBL 21 AND WL 156.5 AFT CARGO COMPARTMENT IAW SRM B737-700 51-40-02 AND DRAWING #146A7Dec 4, 2020 · N7713A · Boeing 7377BDSDR SWIA202055292Floorbeam · corrodedFRAME FS 333 CABIN FLOOR CROSS BEAM HAS EVIDENCE OF CORROSION AT NUT PLATE HOLE AT APPROXIMATELY BL 18RT. C-CHECK RO 1/5/2021. REMOVED CORROSION BY CUTTING OUT DAMAGE AT FS 333 APPROXIMATELY BL 18RT CABIN FLOOR CROSS BEAM AND REPAIRED AREA, REF REO 670-53-21Dec 4, 2020 · N788SK · Cndair CL6002C10SDR SWIA202054706Floorbeam · corrodedTOP CAP AT FS 559.0 RBL 27 TO SILL HAS CORROSION. C-CHECK RO 12/20/2020. REMOVED CORROSION ON TOP CAP AT FS 559.0 RBL 27 TO SILL, IAW CRJ200 SRM. ORIGINAL MATERIAL THICKNESS OF TOP CAP AT FS 559.0 RBL 27 TO SILL IS .050,? REF CRJ200 SRM. REMAINING MATERIALDec 4, 2020 · N944SW · Cndair CL6002B19SDR R61A2020121600893Floorbeam · corrodedWHILE IN HEAVY CHECK, CFIII CROSSBEAM AAT FR 87 LT FLOOR PANEL SUPPORT HAS CORROSION. REPLACED PANEL SUPPORT ON AAR NRC 4500809-1000-0059, PER ARM 51-41-01. THIS AIRCRAFT REMAINS IN HEAVY CHECK AT THE TIME OF REPORTING.Dec 4, 2020 · N727YX · Emb ERJ170200LRSDR FDEA202012043026Shim · crackedMAIN CARGO FLOOR SUPPORT SHIM DAMAGED AT STA 1058 BETWEEN LBL 24 AND LBL 45. REMOVED SHIM (COVER PLATE) AT MAIN CARGO FLOOR SUPPORT STA 1058 BETWEEN LBL 24 AND LBL 45 AND FOUND CRACK AND OUT OF LIMITS, IAW B757 SRM 51-40-02-0G 53-00-51-1A. FABRICATED AND INSDec 4, 2020 · N961FD · Boeing 7572Y0SDR DALA2020120804013Floorbeam · corrodedCORROSION FLOOR BEAM -Y794.3 AT LEVEL FR 73 AT AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM -Y794.3 AT LEVEL FR 72 AT AFT GALLEY AREA, AS PER A330 SRM AND DWG.Dec 4, 2020 · N801NW · Airbus A330323SDR SWIA202055530Floorbeam · corrodedFS 349 RBL 9 TO RBL 27 IS CORRODED. C-CHECK RO 1/16/2021. FOUND CORROSION ON FS 349 RBL 9 TO RBL 27 TO ONLY BE ON FASTENERS. REMOVED AND REPLACED FASTENERS, IAW CRJ200 SRM 51-42-13. REFERENCE CONTINUE CARD FOR DETAILS OF WORK PERFORMED.Dec 3, 2020 · N701BR · Cndair CL6002B19SDR SWIA202055529Floorbeam · corrodedFS 349 LBL 27 TO LBL 9 IS CORRODED. C-CHECK RO 1/16/2021. UPON EVAL FOUND TO ONLY BE CORROSION ON FASTENERS. REMOVED AND REPLACED CORRODED FASTENERS AND NUTPLATES ON LBL 9 FS 349, IAW CRJ 200 SRM 51-42-13 AND 51-42-15. REFERENCE CONTINUE CARD FOR DETAILS ODec 3, 2020 · N701BR · Cndair CL6002B19SDR SWIA202055528Floorbeam · corrodedFS 349 LT FLOOR SILL TO LBL 27 IS CORRODED. C-CHECK RO 1/16/2021. FASTENERS AND NUTPLATES WERE FOUND TO BE CORRODED. REMOVED AND REPLACED WITH SERVICABLE HARDWARE, IAW CRJ 200 SRM 51-42-10.Dec 3, 2020 · N701BR · Cndair CL6002B19SDR SWIA202055515Floorbeam · crackedFS 280 LBL 9 INBOARD CLIP AND RBL 9 OUTBOARD CLIP ARE CRACKED. C-CHECK RO 1/16/2021. REMOVED AND REPLACED TWO EACH CLIPS LBL 9 INBOARD AND RBL OUTBOARD AT FS 280, IAW CRJ 200 SRM 51-24-36, 51-25-21, 51-25-06 AND 51-42-21 MATERIAL TYPE USED PER REO 601R-53-11Dec 3, 2020 · N701BR · Cndair CL6002B19SDR DALA2020120403970Floorbeam · corrodedDURING INITIAL INSPECTION MAINTENANCE FOUND SEVERAL CORROSION AT FLOOR BEAM STA 1640 FROM LBL 54 TO RBL 52. REPAIRED PER SRM.Dec 3, 2020 · N712TW · Boeing 7572Q8SDR SWIA202055840Floorbeam · corroded*FS565.00 L/H FLOOR SILL HAS SURFACE CORROSION (MARKED) (C-CHECK) RO 2/1/2021 RMOVED AND INSTALLED NEW L/H FLOOR SILL AT FS565 REF CRJ-900-SRM 51-42-06-001-001-A01 AND DWG SH690-32170 REV AD. COMPLIED WITH 51-900-1002-SKY AND PRESSURE CHECKS GOOD. SEE CONTDec 2, 2020 · N161PQ · Cndair CL6002D24SDR AALA202012089012Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE. CORROSION OF FLOORBEAM AT SCREW HOLE NEAR STA 986 AND RBL 4, MEASURING L=0.575 IN, W=0.575 IN, D=0.15 IN. ACCOMPLISHED PERMANENT REINFORCING DOUBLER REPAIR, IAW SRM 53-70-51-2R-6 AND 51-40-02 AND EA310144.Dec 2, 2020 · N819NN · Boeing 737823SDR DALA2020120303957Floorbeam · corrodedCORROSION ON FLOOR BEAM +Y1292 AT LEVEL OF FR 16 AT FWD GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM +Y1292 AT LEVEL OF FR 16 AT FWD GALLEY AREA. OK FOR SERVICE.Dec 2, 2020 · N345NW · Airbus A320212SDR SWIA202055885Floorbeam · corroded*FS280.00 AFT FACE LWR SECTION FLOORBOARD ATTACHMENT ANGLE HAS SEVERAL SPOTS OF CORROSION BETWEEN STGR26L & STGR26R (C-CHECK) RO 2/1/2021 REMOVED AND REPLACED FLOORBOARD ATTACHMENT ANGLES STGR 26L AND STGR 26R AT FS280.00 REF CRJ900 SRM 51-42-06-00-001-A0Dec 1, 2020 · N161PQ · Cndair CL6002D24SDR SWIA202055522Floorbeam · corrodedDURING INSPECTION OF 36M TASK CARD 53-170-500, FOUND CORROSION BETWEEN RBL 9 AND RBL 27 AT 559+80. C-CHECK RO 1/16/2021. REMOVED AND REPLACED FLOOR SUPPORT, IAW CRJ200 SRM 51-42-06 AND 51-42-11.Dec 1, 2020 · N701BR · Cndair CL6002B19SDR SWIA202055521Strap · corrodedLT CABIN FLOOR BEAM SUPPORT STRAP AT FS 559.00 BETWEEN LBL 36 AND LBL 44 HAS MULTIPLE SPOTS OF CORROSION. C-CHECK RO 1/16/2021. REMOVED DAMAGED SUPPORT STRAP AT FS 559 BETWEEN LBL 36 AND LBL 44 AND INSTALLED NEW SERVICEABLE STRAP, IAW CRJ200-SRM-51-42-06, 51Dec 1, 2020 · N701BR · Cndair CL6002B19SDR MASA20201219132Floorbeam · corrodedCORROSION ON FLOOR BEAM RBL 9 BETWEEN FS 105 AT AFT CARGO COMPARTMENT BEAM FLOOR WAS REPAIRED, PER CRJ900 SRM 53-00-41-201-001-A03 AND 53-00-41-995-829 REPAIRED 001-A03.Dec 1, 2020 · N916FJ · Cndair CL6002D24SDR SWAA2020121633587Floorbeam · corrodedPASSENGER CABIN FLOOR STA 947.5 LBL 24 WL 208 T-CAP FRAME AT AFT INBOARD LAV D MOUNT, UPPER AND LOWER SURFACE/EDGE IS CORRODED. REMOVED CORROSION PASSENGER CABIN FLOOR STA 947.5 T CAP LBL 24. EVALUATED MATERIAL LOSS & FOUND ORIG 'T' .180 REMAINING .100 LOSS Dec 1, 2020 · N8607M · Boeing 7378H4SDR AALA202012089011Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE. CORROSION OF FLOORBEAM AT GIRT BAR FASTENER HOLE NEAR STA 986.5 AND RBL 43, MEASURING L=0.5 IN, W=0.5 IN, D=0.15 IN. ACCOMPLISHED PERMANENT REINFORCING DOUBLER REPAIR, IAW SRM 53-70-51 AND 51-40-02 AND EA310110.Dec 1, 2020 · N819NN · Boeing 737823SDR AALA202012239011Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE. CORROSION OF FLOOR BEAM AT STA 986 AND LBL 43, MEASURING L=1.25 IN, W=1.0 IN, D=0.04 IN. ACCOMPLISHED PERMANENT REINFORCING REPAIR WITH NESTED ANGLES, IAW SRM 53-00-51 AND EA310118.Nov 30, 2020 · N819NN · Boeing 737823SDR DALA2020120103938Floorbeam · corrodedCORROSION FLOOR STRUCTURE AT FR 74 BETWEEN YA AND YB1 AT AFT GALLEY. CORRECTIVE ACTION: REPLACED FLOOR STRUCTURE LOC BETWEEN FR 73 TO FR 74 AND YA TO TB1 AT AFT GALLEY AREA, AS PER A330 SRM AND DWG.Nov 30, 2020 · N801NW · Airbus A330323SDR MASA20201215108Fitting · damagedELONGATED HOLES ON FWD CLOSING FITTING IN STA FS 314 AND BETWEEN 37 LBL TO 41 LBL AT MAIN ENTRANCE DOOR LOWER SILL, FWD WET AREA (W1) (CPAX). FITTING WAS REPLACED IN STA FS 314 AND BETWEEN 37 LBL TO 41 LBL AT MAIN ENTRANCE DOOR LOWER SILL, FWD WET AREA, PER CNov 29, 2020 · N916FJ · Cndair CL6002D24SDR JR2R20201129521Floorbeam · corrodedRIGHT SIDE OF FLOOR BEAM @ RBL9 CORRODEDNov 29, 2020 · N89317 · Emb ERJ170200LRSDR SWIA202055801Floorbeam · corroded*CORROSION ON TOP SURFACE OF FLOOR BEAM LBL 27 AT FS 1031.00. AREA MARKED. (C-CHECK) RO 2/1/2021 REMOVED DAMAGE SECTION OF FLOOR BEAM LBL-27 AT FS 1031.00 AND INSTALLED NEW REPAIR SECTION REF. CRJ-900 SRM 53-00-41-201-001-A03. COMPLIED WITH SKYWEST TASK CNov 28, 2020 · N161PQ · Cndair CL6002D24SDR MASA20210105002Floorbeam · corrodedCORROSION ON FLOOR BEAM (UPPER/AFT FLANGE) IN STA FS 280 AND 11 RBL AT PAX CABIN FWD WET AREA. (W1) (CPAX) FLOOR BEAM FS 280.00 RT WAS REPLACED, PER CRJ900 SRM 51-42-06-001-AO1 PAR 6 AND SRM 51-42-001-001-A01 PAR 8.Nov 28, 2020 · N916FJ · Cndair CL6002D24
Back to JASC 5315