JASC 5315

Service difficulty reports · 44,218

Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5315'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR SWIA202081751818Floorbeam · corrodedCORRODED FLOORBOARD SUPPORT ANGLE OTBD OF R/H SEAT TRACK @ FRAME 15 (C-CHECK) RO 8/14/2020 REMOVED AND REPLACED FLOORBOARD SUPPORT ANGLE O/B OF R-H SEAT TRACK AT FR 15. REF EMB SRM. SEE CONTINUATION CARD FOR WORK ACCOMPLISHED.Aug 1, 2020 · N174SY · Emb ERJ170200LRSDR SWIA202008252068Floorbeam · crackedL/H 280.0 CROSSBEAM AS A CRACK ON UPPER FLANGE LBL39.0 RADIUS AREA. REMOVED AND REPLACED CRACKED L/H FS 280.00 CROSSBEAM WITH NEW CROSSBEAM (P/N CC670-34094-1S) IAW SRM AND DWG. RESTORED FINISH TO REWORK AREA IAW SRM AND APPLIED CIC.Jul 31, 2020 · N741EV · Cndair CL6002C10SDR SWIA2020082151953Floorbeam · corrodedFWD WET AREA-FLOOR CROSS BEAM FR 14; RBL 11" HAS SPOT OF CORROSION IN TOP FLANGE AT RH SEAT TRACK INTERSECTION POINT. CORROSION ON THE FWD WET AREA-FLOOR CROSS BEAM FR 14; RBL 11 FOUND TO BE OUT OF ALLOWABLE LIMITS REF SRM, PERFORMED CROSSBEAM REPAIR BY CUTTJul 31, 2020 · N144SY · Emb ERJ170200LRSDR SWIA2020082151951Floorbeam · corrodedFWD WET AREA-FLOOR CROSS BEAM AT FR 17; LBL 6" HAS SPOT OF CORROSION IN TOP FLANGE (BETWEEN SEAT TRACKS). (C-CHECK) RO 8/19/2020 PERFORMED CUTOUT OF DAMAGE AND INSTALLED FILLER AND DOUBLER TO FWD WET AREA-FLOOR CROSS BEAM AT FR 17; LBL 6" REF EMB SRM.Jul 31, 2020 · N144SY · Emb ERJ170200LRSDR SWIA2020082051884Floorbeam · corrodedFLOOR BEAM AT LBL9 FS.295 HAS CORROSION AT 1EA. FASTENER HOLE. REPAIRED FLOOR BEAM AT LBL9 FS.295 AT 1EA. FASTENER HOLEREF REO. SEE CONTINUE CARD FOR DETAILS.Jul 31, 2020 · N701SK · Cndair CL6002C10SDR SWIA2020081251783Floorbeam · damagedFLOORBEAM FLANGE DAMAGED. PERFORMED RBL9 FLOOR BEAM FLANGE REPAIR REF REO. ALL STEPS COMPLETED AT THIS TIME. ST CARD COMPLETE.Jul 31, 2020 · N740EV · Cndair CL6002C10SDR SWIA2020090252155Floorbeam · crackedF.S. 484 LT INTERCOSTAL BETWEEN LBL 27 AND LBL 36 IS CRACKED AT THE LOWER OUTBOARD CORNER. C-CHECK RO 8/29/2020. REPAIRED DAMAGED F.S.484 LT INTERCOSTAL BETWEEN LBL 27 AND LBL 36 LWR CORNER IAW MHIRJ REO AS DOCUMENTED ON CONTINUATION CARD. FORM M-337 COMPLETJul 30, 2020 · N917EV · Cndair CL6002B19SDR SWIA2020082051883Floorbeam · corrodedLH FS.280 FLOOR CROSS BEAM HAS CORROSION (C-CHECK) RO 8/14/2020 REMOVED AND REPLACED LH FS.280 FLOOR CROSS BEAM WITH NEW REF. CRJ 700 SRM AND BOMBARDIER DWG. COMPLIED WITH SKYWEST CARD AND SKYWEST M-337 FORM.Jul 30, 2020 · N701SK · Cndair CL6002C10SDR SWIA2020082051882Floorbeam · corrodedCOCKPIT FLOOR SUPPORT AT FS.280 BETWEEN LBL9 AND RBL9 HAS CORROSION. (C-CHECK) RO 8/14/2020 REMOVED AND REPLACED THE COCKPIT FLOOR SUPPORT AT FS.280 BETWEEN LBL9 AND RBL9 WITH NEW REF. CRJ 700 SRM AND BOMBARDIER DWG. COMPLIED WITH SKYWEST CARD AND SKYWEJul 30, 2020 · N701SK · Cndair CL6002C10SDR SWIA2020082051881Floorbeam · crackedLH FS.280 CORROSION CAP ANGLE IS CRACKED. (C-CHECK) RO 8/18/2020 REMOVED AND REPLACED THE LH FS.280 CORROSION CAP ANGLE WITH NEW REF. CRJ 700 SRM AND BOMBARDIER DWG. COMPLIED WITH SKYWEST CARD AND SKYWEST M-337.Jul 30, 2020 · N701SK · Cndair CL6002C10SDR AALA202008059023Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION OF FLOOR BEAM AT FR20 AND BL -Y254, MEASURING L=2.690 IN, W=1.348 IN, D=0.023 IN. REMOVED CORROSION, FLOOR BEAM WITHIN LIMITS IAW A321 SRM 51-74-11-801 AND 53-11-14-283-007.Jul 30, 2020 · N125AA · Airbus A321231SDR SWIA202053515Floorbeam · damagedCOMPLY WITH REO 601R-53-41-1116 REPAIR & REINFORCEMENT FOR FS 559.00 LOWER CAP ANGLES BL 9.00 & 18.00 LT & RT. C-CHECK RO 10/18/2020. COMPLIED WITH REO. MAJOR REPAIR TASK & FORM M337 COMPLETED AND ATTACHED. WEIGHT CHANGE OF +4.3 LBS. REFER TO ATTACHED CONJul 29, 2020 · N922EV · Cndair CL6002B19SDR SWAA2020090305803Floorbeam · crackedCRACKED FLOOR PANEL SUPPORT AT B.S. 540; B.L. 0 - L.B.L. 24.5; W.L. 208.1. REMOVED AND REPLACED FLOOR PANEL SUPPORT AT BS540; B.L0 - LBL24.5 WL.208.1 IAW SRM 51-40-02-0G-0 DWG 143A5240.Jul 29, 2020 · N7884G · Boeing 73776NSDR SWAA2020090305804Floorbeam · crackedCRACKED FLOOR PANEL SUPPORT AT B.S. 540; B.L. 0 - R.B.L. 24.5; W.L. 208.1. REMOVED AND REPLACED FLOOR SUPPORT STA.540 BL-O TO RBL 24 PER SRM 51-40-02; SRM 51-40-05 AND DWG. 143A5240 91195U 8.9.20.Jul 29, 2020 · N7884G · Boeing 73776NSDR AALA2020080769020Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED FLOOR SUPPORT AT BS 540 BETWEEN BL0 AND LBL 24.75, MEASURING L=2.0 IN, W=0.005 IN. REPLACED FLOOR SUPPORT WITH NEW IAW AARD 51-00-05-1 AND SRM 51-40-02.Jul 29, 2020 · N957NN · Boeing 737823SDR AALA2020080769019Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED FLOOR SUPPORT AT STA 540 BETWEEN BL0 AND RBL 24.75, MEASURING L=0.5 IN, W=0.005 IN. REPLACED FLOOR SUPPORT WITH NEW IAW AARD 51-00-05-1 AND SRM 51-40-02.Jul 29, 2020 · N957NN · Boeing 737823SDR SWIA2020090452239Floorbeam · chafedTHE FLOOR BEAM ATTACHMENT AT FS621.00 AT RBL27.00 IS CHAFFED (MARKED). C-CHECK RO 9/1/2020. REMOVED CHAFE FROM FLOOR BEAM ATTACHMENT FITTING AT FS621.00 AND RBL 27.00 REF CRJ-200 SRM. EVALUATED AND FOUND TO BE OUT OF LIMITS. SUBMITTED TO ENGINEERING. RECEIJul 28, 2020 · N445SW · Cndair CL6002B19SDR SWIA2020090452238Floorbeam · chafedTHE FLOOR BEAM ATTACHMENT AT FS621.00 AT RBL9.00 IS CHAFFED (MARKED). C-CHECK RO 9/1/2020. REMOVED CHAFE FROM FLOOR BEAM ATTACHMENT FITTING AT FS621.00 AND RBL9.00 REF CRJ-200 SRM. EVALUATED AND FOUND TO BE OUT OF LIMITS. SUBMITTED TO ENGINEERING. RECEIVEJul 28, 2020 · N445SW · Cndair CL6002B19SDR SWIA2020090452237Floorbeam · chafedTHE FLOOR BEAM ATTACHMENT AT FS621.00 AT LBL9.00 IS CHAFFED (MARKED). C-CHECK RO 9/1/2020. REMOVED CHAFE FROM FLOOR BEAM ATTACHMENT AT FS621.00 AND LBL9.00 REF CRJ-200 SRM 51-12-00. EVALUATED AND FOUND TO BE OUT OF LIMITS. SUBMITTED TO ENGINEERING. RECEIVJul 28, 2020 · N445SW · Cndair CL6002B19SDR SWIA2020090452236Floorbeam · corrodedTHE FLOOR BEAM ATTACHMENT AT FS621.00 AT LBL27.00 HAS CORROSION AND CHAFFED (MARKED). C-CHECK RO 9/1/2020. REMOVED CHAFE AND NOTED CORROSION FROM FLOOR BEAM ATTACHMENT AT FS621.00 AND LBL27.00 REF CRJ-200 SRM. EVALUATED AND FOUND TO BE OUT OF LIMITS. SUBMIJul 28, 2020 · N445SW · Cndair CL6002B19SDR SWAA2020082505284Floorbeam · corrodedCORROSION ON UPPER AFT CHORD OF BS 259.5 FLOOR BEAM FROM LBL 2 TO LBL 9; WL 207.5 / REPAIRED DAMAGE ON AFT CHORD OF BS 259.5 FLOOR BEAM FROM LBL 2 TO LBL 9; WL 207.5 PER ER #20-03024 REV IR AND EA #20-153-01504 REV IR.Jul 28, 2020 · N716SW · Boeing 7377H4SDR SWAA2020082505283Floorbeam · corrodedCORROSION ON UPPER FWD CHORD OF BS 259.5 FLOOR BEAM FROM LBL 3 TO LBL 7; WL 207.5 / REMOVED AND REPLACED BS259 FWD CHORD I.A.W BOEING DWG 141A7430; 141A0631 (CORROSION OUT OF LIMITS DUE TO NO SRM LIMITSJul 28, 2020 · N716SW · Boeing 7377H4SDR AALA2020080309009Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT CABIN FLOORBEAM AT BS 947.5 AND RBL 4. REPAIRED FLOORBEAM PER SRM 53-70-51.Jul 28, 2020 · N957NN · Boeing 737823SDR SWAA2020083104514Floorbeam · corrodedCORROSION FLOOR STRUCTURE BEAM UPPER FLANGE BS 986.5 AND BETWEEN RBL 0 TO RBL 37 AT AFT GALLEY AREA (1 EA) WL 208.1 / REPAIRED FLOOR STRUCTURE BEAM UPPER FLANGE BS 986.5 AND BETWEEN RBL 0 TO RBL 37 AT AFT GALLEY AREA IAW EA #20-153-01314 REV IR AND EA #53-0545Jul 27, 2020 · N7749B · Boeing 7377BDSDR FDEA2020083171935Floorbeam · corrodedCORROISION ON FLOOR BEAM AT STA 1200 LBL 2 TO LBL 68 EVALUATED UPPER SURFACE OF FLOOR BEAM AT BSTA 1200 LBL2 TO LBL68 AND FOUND CORROSION TO BE GREATER THAN 10% OF MATERIAL THICKNESS. REPAIRED UPPER SURFACE OF FLOOR BEAM AT STA 1200 LBL 2 TO LBL 68 IAW SRJul 27, 2020 · N910FD · Boeing 757236SDR FDEA2020082071935Floorbeam · corrodedCORROISION ON THE FLOORBEAM AT BS 1200, LBL 2 TO LBL 68. EVALUATED UPPER SURFACE OF THE FLOORBEAM AND FOUND TO BE GREATER THAN 10% OF MATERIAL THICKNESS. REPAIRED THE UPPER SURFACE OF THE FLOORBEAM IAW SRM 53-00-51-2R, REPAIR 8.Jul 27, 2020 · N910FD · Boeing 757236SDR SWIA2020090152113Floorbeam · cracked* FLOOR BEAM ATTACHMENT CLIP AT OBD SIDE RBL 9.0 BEAM FS 280.00 CRACKED. (C-CHECK) RO 8/28/2020 COMPLIED WITH REPAIR ON FLOOR BEAM ATTACHMENT CLIPS, AT FS280.00 RBL9 OUTBD SIDE, REF REO.Jul 26, 2020 · N463SW · Cndair CL6002B19SDR SWIA2020090152112Floorbeam · cracked* FLOOR BEAM ATTACHMENT CLIP AT INB SIDE LBL 9.0 BEAM FS 280.00 CRACKED. (C-CHECK) RO 8/28/2020 REMOVED AND DISCARDED DAMAGED ATTACHMENT CLIP, RECEIVED LOCATED DRILLED AND INSTALLED NEW ANGLE CLIP PN# 601R31113-57 AT FS280.00 LBL9 INBD SIDE, REF CRJ200 SRJul 26, 2020 · N463SW · Cndair CL6002B19SDR SWIA2020090152111Floorbeam · cracked* FLOOR BEAM ATTACHMENT CLIP AT OBD SIDE LBL 9.0 BEAM FS 280.00 CRACKED. (C-CHECK) RO 8/28/2020 REMOVED AND DISCARDED CRACKED ATTACHMENT CLIP, RECEIVED LOCATED DRILLED AND INSTALLED NEW CLIP PN# 601R31113-57, AT FS280.00 FLOOR SUPPORT LBL9. OUTBD SIDE. REJul 26, 2020 · N463SW · Cndair CL6002B19SDR SWAA2020083104257Floorbeam · crackedCRACK FLOOR STRUCTURE INTERCOSTAL AT BS 540 AND LBL 0 TO LBL 24.5 AT PASSENGER CABIN (1 EA) / REPLACED INTERCOSTAL LOC. AT BS540 AND LBL 0 TO LBL 24.5 AT PASSENGER CABIN (1EA) IAW B737-700 SRM 51-40-02; 51-10-02; ITEM 9 AND DWG 143A0060 REV-.Jul 26, 2020 · N7749B · Boeing 7377BDSDR SWAA2020082503394Floorbeam · corrodedCORROSION ON THE CABIN FLOOR FRAME AT STA.986.5 HAS CORROSION AROUND 3 NUTPLATE HOLES FROM LBL 6 TO RBL 15. WL 208. / ACCOMPLISHED EA 1-A53-8241 REV 3.; CORROSION REMOVED ON CABIN FLOOR BEAM AROUND NUTPLATES HOLES; STA 986.5 FROM LBL 6 TO RBL 15; WL 208Jul 26, 2020 · N428WN · Boeing 7377H4SDR SWAA2020082503395Floorbeam · corroded***CORROSION*** CABIN FLOOR FRAME HAS CORROSION AROUND NUTPLATE HOLE STA.986.5 RBL44. WL 208. / ACCOMPLISHED EA 1-A53-8241 REV 3.; CORROSION REMOVED ON CABIN FLOOR BEAM AROUND NUT PLATES HOLES STA 986.5 RBL 44; WL 208Jul 26, 2020 · N428WN · Boeing 7377H4SDR SWAA2020082503396Floorbeam · corrodedCORROSION ON THE CABIN FLOOR FRAME HAS CORROSION AROUND NUTPLATE HOLE AT STA.986.5 RBL 36. WL 208. / ACCOMPLISHED EA 1-A53-8241 REV 3.; CORROSION REMOVED ON CABIN FLOOR BEAM; AROUND NUT PLATES HOLES; STA 986.5 RBL 36'; WL 208Jul 26, 2020 · N428WN · Boeing 7377H4SDR SWIA2020090152097Floorbeam · corroded*FLOOR BEAM AT FS 559+80 CORRODED ON INBD SIDE (C-CHECK) RO 8/28/2020 REPLACED FLOOR BEAM UPPER CAP ANGLE FS 559+8 TO FS 568 AND AFT. FLOOR BEAM SPLICE "U" CHANNEL AT FS 568 RBL 9. REF: CRJ-200 SRM AND REO. RESTORED FINISH . REF: CRJ-200 SRM. APPLIED CICJul 25, 2020 · N463SW · Cndair CL6002B19SDR FDEA2020081271716Floorbeam · crackedAFT CARGO BILGE, CRACK ON FLOOR SUPPORT ANGLE AT FWD BLKHD, STA 1786 APPROX LBL 10 REMOVED AND REPALCED FLOOR SUPPORT ANGLE AT STA 1786 LBL 10 REF SRM 51-35-01 VOL 2, DWG AFA 3871Jul 25, 2020 · N304FE · Doug MD1030FSDR SWIA2020090952367Nut Plate · corrodedFLOOR SUPPORT CAP STRIP CORRODED AT FS 574 AND BETWEEN RBL 27.00 AND RBL 47.00. C CHECK RO 9/5/2020. REMOVED AND REPLACED FLOOR SUPPORT CAP STRIP AT FS 589 BETWEEN RBL 27 AND 47, IAW CRJ-200.Jul 24, 2020 · N910SW · Cndair CL6002B19SDR IPXA2020081459033Floorbeam · crackedINSPECTION TYPE:1C3CMAIN CARGO FLOOR BEAM HAS CRACK AND DENT AT STA Y=979 AND X=-107.REPAIRED FLOOR BEAM AT STA Y=979 AND X=-107 IAW VT-SAA EA # 011-5310-01-A8440-IR AND UPS EO # MD11-5310-77493-A. MAJORJul 24, 2020 · N279UP · Doug MD11FSDR FDEA202007241642Tee Fitting · corrodedMAIN DECK STA 1200 BETWEEN LBL 24.75- LBL 45.5 T CHORD CORRODED REMOVED CORROSION FROM BS 1200 FLOOR BEAM (T CHORD) IAW B757 SRM 51-10-02. ORIG MAT .125 REMAING 0 FOUND OUT OF LIMITS IAW B757 SRM 53-00-51-1A FIG 101 DET III, REPAIRED FLOOR BEAM IAW B757 SJul 24, 2020 · N962FD · Boeing 7572G5SDR FDEA2020081271773Floorbeam · corrodedMAIN DECK STA.421, RBL 6 TO RBL 24, FLOORBEAM HAD LIGHT SURFACE CORROSION AT SEVERAL AREA AROUND NUT PLATES REMOVED & REPLACED FLOOR SUPPORT IAW DWG NBA 6022.Jul 23, 2020 · N304FE · Doug MD1030FSDR FDEA2020081271715Floorbeam · crackedAFT CARGO BILGE, CRACK AND CORROSION ON FLOOR SUPPORT ANGLE AT FWD BLKHD STA 1786 RBL 24. REMOVED AND REPALCED FLOOR SUPPORT ANGLE AT STA 1786 RBL 24 REF SRM 51-35-01 VOL 2, DWG AFA 3871Jul 23, 2020 · N304FE · Doug MD1030FSDR FDEA2020081271714Floorbeam · crackedAFT CARGO BILGE, CRACK AND CORROSION ON FLOOR SUPPORT ANGLE AT FWD BLKHD STA 1786 LBL 12. REMOVED AND REPALCED FLOOR SUPPORT ANGLE AT STA 1786 LBL 12 REF SRM 51-35-01 VOL 2, DWG AFA 3871Jul 23, 2020 · N304FE · Doug MD1030FSDR FDEA2020080721773Floorbeam · corrodedMAIN DECK STA.421, RBL 6 TO RBL 24, FLOOR SUPPORT, LIGHT SURFACE CORROSION AT SEVERAL AREA AROUND NUT PLATES REMOVED AND REPLACED SEAT-TRACK SRM 53-70-00 FIG 1AJul 23, 2020 · N304FE · Doug MD1030FSDR FDEA2020081271856Floorbeam · corrodedAFT CARGO FLOORBEAM AT FRAME 62 CORRODED THROUGH. REMOVED AND REPLACED THE AFT CARGO FLOORBEAM IAW DWG A53974288, REV.K, AND SRM 51-40-21.Jul 22, 2020 · N744FD · Airbus A300B4622RSDR FDEA2020073021698Floorbeam · crackedCENTER CARGO COMPT FLOORBOARD SUPPORT BRACKET CRACKED AT FASTENER HOLE. MRKD STA 1601 RBL 18. REMOVED DAMAGED FLOOR BOARD SUPPORT & REPLACED WITH FAB FLOOR BEAM SUPPORT IAW SRM 51-35-01 PG 4 VOL 2 & DOUGLAS DWG AFA3865Jul 22, 2020 · N304FE · Doug MD1030FSDR SWIA2020090252177Floorbeam · crackedLT F.S. 484.00 ANGLES AT LBL 36 AND LBL 27 ARE CRACKED. C-CHECK RO 8/29/2020. REMOVED AND REPLACED CRACKED ANGLE AT F.S. 484 LBL27 IAW CRJ 200 SRM. REFERENCE CAMP #21306170 FOR REPAIR OF LBL 36 ANGLE AT F.S. #84.Jul 20, 2020 · N917EV · Cndair CL6002B19SDR SWIA2020090252151Floorbeam · crackedF.S. 280 RBL9 SUPPORT CLIP IS CRACKED. C-CHECK RO 8/29/2020. REMOVED AND REPLACED CRACKED SUPPORT CLIP AT FS.280 RBL9 OUTBOARD IAW CRJ 200SRM.Jul 20, 2020 · N917EV · Cndair CL6002B19SDR SWIA2020081151726Angle · damagedRBL 9 O/B ATTACH BRACKET @ FS 280 UPPER AFT HOLE HAS NO ED, BREAKS THROUGH EDGE OF INNER L ANGEL (C-CHECK) RO 8/8/2020 REPAIRED BRACKET AT RBL 9 O/B @ F.S. 280 IAW REO FORM 337 FILED AND SKYCARD C/W AND ATTACHED NO WT CHANGEJul 18, 2020 · N971SW · Cndair CL6002B19SDR SWAA2020081001364Floorbeam · corrodedCORROSION ON BS 259 FLOOR BEAM UPPER AFT CHORD AT LBL 12. DAMAGED REPAIRED/INSPECTED AND EVALUATED PER EA 20-153-01297 REV IR (ATS ER 20-02921 REV IR).Jul 18, 2020 · N717SA · Boeing 7377H4SDR SWAA2020081001363Floorbeam · corrodedCORROSION ON BS 259 FLOOR BEAM UPPER FWD CHORD AT BL 0 -LBL 4 WL208 / REPAIRED DAMAGE ON BS 259 FLOOR BEAM UPPER FWD CHORD AT BL0-LBL4. WL208 PER ER 20-02921 REV IR AND EA 20-153-01297 REV IRJul 18, 2020 · N717SA · Boeing 7377H4SDR SWAA2020081006240Floorbeam · corrodedCOCKPIT FLOORBEAM BS 270 FROM LBL 11 THRU RBL 11 HAD CORROSION ON UPPER SURFACE. REPAIRED THE COCKPIT FLOORBEAM IAW EA 1-A53-13812 AND EA 20-153-01149Jul 17, 2020 · N258WN · Boeing 7377H4
Back to JASC 5315