JASC 5315

Service difficulty reports · 44,218

Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5315'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR SWAA2021072209697Floorbeam · corroded***CORROSION*** ON FLOOR SUPPORT SPLICE AT ACB BS727D+6 LBL19 TO RBL19 WL156. / REMOVED AND REPLACED ACB FLOOR SUPPORT SPLICE BS 727D+6 LBL 19 - RBL 19 I.A.W AMM 25-52-10-400-801Aug 18, 2020 · N484WN · Boeing 7377H4SDR SWIA202052619Floorbeam · corrodedTHE FWD INBOARD FLOOR MOUNT FITTING ATTACHED TO THE FLOOR SUPPORT CROSSBEAM FS 295 FOR GALLEY NR 1 HAS CORROSION ON ITS UPPER SURFACE, MARKED WITH ORANGE FLAG TAPE. C-CHECK RO 9/20/2020. REMOVED AND REPLACED FITTING P/N SH670-32149-3 AT FS 280.00-FS 295.00 RAug 17, 2020 · N784SK · Cndair CL6002C10SDR UIEA2020082001823Floorbeam · corrodedCORROSION ON LOWER SURFACE OF FLOOR BEAM UPPER CHORD AT STA 1920 NEAR RBL 102.58. ACCOMPLISHED THE JOB IAW EI NO T2020A53M-1985. JOB COMPLETED AND CONDITION CHECK NORMAL.Aug 17, 2020 · N416MC · Boeing 74747UFSDR UIEA2020082001829Floorbeam · corrodedCORROSION ON FLOOR BEAM UPPER CAP AT STA 2240 BETWEEN LBL 50.00 AND LBL 67.01. ACCOMPLISHED JOB IAW EI NO T2020A53M-1983 REV 1 AND SRM 53-00-51-2R-2, REPAIR 3, REV 89. JOB COMPLETED AND CONDITION CHK NORMAL.Aug 17, 2020 · N416MC · Boeing 74747UFSDR UIEA2020082001830Floorbeam · corrodedCORROSION ON FLOOR BEAM UPPER CAP AT STA 800 OUTBD OF LBL 98.58. REPAIR FLOOR BEAM IAW EI NO T2020A53M-2046 REV 1. CONDITION CHECK NORMAL AND JOB COMPELTED.Aug 17, 2020 · N416MC · Boeing 74747UFSDR SWAA2021071508940Floorbeam · corroded** CORROSION ** FWD CARGO COMPARTMENT AFT BULKHEAD LOWER FLOOR SUPPORT ANGLE AT STA 500D FROM S-26L TO S-26R MKD DOT 60-010 WL 156 / REMOVED AND INSTALLED NEW FLOOR SUPPORT ANGLE AT FWD CARGO STA 500D FROM S-26L TO S-26R IN REF SRM 51-40-02-0G-0 AND DRAWING 14Aug 16, 2020 · N745SW · Boeing 7377H4SDR U2RA202009200009Floorbeam · crackedWHILE ACCOMPLISHING TASK CARD 53-520-00-01 FOUND TRANSVERSE FLOOR BEAM CRACKED AT STA 1285 LBL 75.92. REPAIRED PER VT-SAA EA 747-5340-56-A8552 REV I/R.Aug 16, 2020 · N756CA · Boeing 747412SDR SWIA202052988Floorbeam · corrodedFLOOR CROSSBEAM CAP AT FS 589.00 BETWEEN LBL 9.00 AND LBL 27.00 IS CORRODED. C-CHECK RO 10/1/2020. REMOVED, LOCATE, DRILLED, AND INSTALLED A NEW SERVICEABLE FLOOR CROSSBEAM CAP AT FS 589.00 BETWEEN LBL 9.00 AND LBL 27.00 P/N 601R35031-165, IAW CRJ 200 SRM.Aug 16, 2020 · N920EV · Cndair CL6002B19SDR SWIA202052983Floorbeam · corrodedFLOOR CROSSBEAM CAP AT FS 559.00+112 BETWEEN RBL 9.00 AND RBL 27.00 IS CORRODED. C-CHECK RO 10/1/2020. REMOVED AND REPLACED CROSSBEAM CAP AT FS 559+112 BETWEEN RBL 9.00 AND RBL 27.00, IAW CRJ 200 SRM.Aug 16, 2020 · N920EV · Cndair CL6002B19SDR SWIA202052982Floorbeam · corrodedCABIN FLOOR CROSSBEAM CAP AT FS 559.00+96 BETWEEN RBL 9.00 AND RBL 27.00 IS CORRODED. C-CHECK RO 10/1/2020. REMOVED, LOCATED, DRILLED, AND INSTALLED A NEW SERVICEABLE CABIN FLOOR CROSSBEAM CAP AT FS 559.00+96 BETWEEN RBL 9.00 AND RBL 27.00 P/N 601R32215-43, Aug 16, 2020 · N920EV · Cndair CL6002B19SDR SWIA202052980Floorbeam · corrodedRT FLOOR CROSSBEAM CAP IS CORRODED BETWEEN RBL 27.00 AND RBL 36.00 AT FS 559.00+80. C-CHECK RO 10/1/2020. REMOVED, LOCATED, DRILLED, AND INSTALLED A NEW SERVICEABLE RT FLOOR CROSSBEAM CAP BETWEEN RBL 27.00 AND RBL 36.00 AT FS 559.00+80 P/N 601R32215-17, IAW Aug 16, 2020 · N920EV · Cndair CL6002B19SDR SWIA202052978Floorbeam · corrodedRT FLOOR CROSSBEAM CAP AT FS 559.00+80 BETWEEN RBL 9.00 AND RBL 27.00 IS CORRODED. C-CHECK RO 10/1/2020. REMOVED AND REPLACED CROSSBEAM CAP AT FS 559+80 BETWEEN RBL 9 AND RBL 27, IAW CRJ 200 SRM.Aug 16, 2020 · N920EV · Cndair CL6002B19SDR SWIA202052976Floorbeam · corrodedCABIN FLOOR BEAM AT LBL 9.00 AND RBL 9.00, TOP CAP IS CORRODED FROM FS 559.00 TO FS 559.00+80 ON THE INBOARD SIDE. TO INCLUDE CROSS MEMBER CAP AT FS 559.00+80. C-CHECK RO 10/1/2020. REF CP 21424162 FOR LBL 9 BEAM CAP REPAIR. CROSS MEMBER CAP AT 559+80 REPAAug 16, 2020 · N920EV · Cndair CL6002B19SDR SWIA202052968Floorbeam · corrodedC-CHECK RO 10/1/2020. RT FLOORBOARD SUPPORT BRACKET IS CORRODED AT FS 559 BETWEEN RBL 27 TO RBL 36. REMOVED AND REPLACED RT FLOORBOARD SUPPORT BRACKET AT FS 559 BETWEEN RBL 27 AND RBL 36, IAW CRJ 200 SRM. SEE CONTINUE CARD FOR WORK PERFORMED.Aug 16, 2020 · N920EV · Cndair CL6002B19SDR SWIA202052598Floorbeam · corrodedTHE FS 280 RT CROSSBEAM HAS EVIDENCE OF CORROSION SPILLING OUT FROM UNDER ITS CORROSION CAP AROUND RBL 11, WHERE THE SEALANT HAS DISBONDED AND PUSHED OUT. C-CHECK RO 9/20/2020. REMOVED AND REPLACED RT FS280 CROSSBEAM P/N CC670-34094-2S, REFERENCE CRJ700 SRM Aug 16, 2020 · N784SK · Cndair CL6002C10SDR SWIA202052597Floorbeam · corrodedTHE FS 280 LT CROSSBEAM HAS EVIDENCE OF CORROSION SPILLING OUT FROM UNDER ITS CORROSION CAP AROUND LBL 11, WHERE THE SEALANT HAS DISBONDED AND PUSHED OUT. C-CHECK RO 9/20/2020. REMOVED AND REPLACED LT FS 280 CROSSBEAM P/N CC670-34094-1S, REFERENCE CRJ700 SRMAug 16, 2020 · N784SK · Cndair CL6002C10SDR SWIA202052596Floorbeam · corrodedTHE FS 280 COCKPIT FLOOR PANEL SUPPORT ANGLE, MOUNTED TO THE 280 CROSSBEAM, HAS MULTIPLE SPOTS OF CORROSION. C-CHECK RO 9/20/2020. BLENDED OUT CORROSION AND RESTORED FINISH TO FS 280.00 COCKPIT FLOOR SUPPORT ANGLE, REF: CRJ-700 SRM.Aug 16, 2020 · N784SK · Cndair CL6002C10SDR SWIA202052960Floorbeam · corrodedRT AND LT FLOOR SUPPORT ANGLES AT RBL 9 AND LBL 9 CRACKED ON AFT SIDE OF FS 280.00. C-CHECK RO 10/1/2020. REMOVED AND REPLACED FS 280.00 FLOOR SUPPORT ANGLES AT LBL 9 AND RBL 9, IAW CRJ 200 SRM.Aug 15, 2020 · N920EV · Cndair CL6002B19SDR AALA202008269004Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN PANEL BREAK ASSEMBLY AT STA540 BETWEEN BL0 AND RBL24, MEASURING L=1.3 IN, W=0.004 IN, D=0.04 IN. REPLACED BREAK ASSEMBLY WITH NEW IAW SRM 51-10-02.Aug 14, 2020 · N807NN · Boeing 737823SDR AALA202008269003Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN PANEL BREAK ASSEMBLY AT STA540 BETWEEN BL 0 AND RBL 30, MEASURING L=1.25 IN, W=0.004 IN, D=0.02 IN. REPLACED BREAK ASSEMBLY WITH NEW IAW SRM 51-10-02.Aug 14, 2020 · N807NN · Boeing 737823SDR FDEA202008121868Floorbeam · corrodedCORROSION ON FLOOR BEAM @ MAIN CABIN FWD WET AREA BS 365.25 BETWEEN RBL 24 AND RBL 57. REMOVED CORROSION ON FLOOR BEAM AT MAIN CABIN FWD WET AREA STA 365.25 BETWEEN RBL 24 TO RBL 57 IAW B757 SRM 51-10-02-0G. EVALUATED DAMAGED AREA AT STA 365 , RBL 41 TO RAug 12, 2020 · N953FD · Boeing 757236SDR FDEA202008121867Floorbeam · corrodedMAIN DECK BS 1661 BL 0 FLOORBEAM TEE FITTING CORRODED. REMOVED CORROSION IAW SRM 51-10-02-0G. EVALUATED DAMAGED AREA ORIG. MAT.=.125", REM. MAT.= .106", MAT. LOSS= .019" FOUND TO BE OUT OF LIMITS IAW SRM 53-00-51-1A, FIG 101, DETAIL VI. FABRICATED AND INAug 12, 2020 · N953FD · Boeing 757236SDR SWAA2020083108713Floorbeam · corrodedCORROSION ON LATERAL BEAM AFT CHORD UPPER SURFACE LBL 7- RBL 11; WL 208; BS 259 / DAMAGE REPAIRED PER ER 20-153-01551 REV IR (ATS ER 20-03095 REV IR).Aug 11, 2020 · N259WN · Boeing 7377H4SDR SWAA2020083108714Floorbeam · corrodedCORROSION ON LATERAL BEAM UPPER SUR FACE AT BS 270; LBL12- RBL 7; WL 207 / DAMAGE REPAIRED PER EA 20-153-01551 REV IR (ATS ER 20-03095 REV IR. REFER TO NRC U205911 FOR TRACKING.Aug 11, 2020 · N259WN · Boeing 7377H4SDR VNAA202008119993Floorbeam · corrodedFLOOR BEAM CAP CORRODED AT RBL 9.00 BETWEEN FS 559+80 TO FS 559+96. FABRICATED, LOCATED, DRILLED AND INSTALLED, FABRICATED FLOORBEAM CAP IAW CRJ 200 SRM 51-24-36 AND 51-40-11.Aug 11, 2020 · N228PS · Bombdr CL6002D15SDR VNAA202008119992Floorbeam · corrodedFLOOR BEAM CAP CORRODED AT RBL 27 BETWEEN FS 559+80 TO FS 559+96. LOCATED,DRILLED, AND INSTALLED FLOORBEAM CAP AT RBL27 ON FS 559+80-559+96 IAW CRJ 200 SRM 51-40-11 AND 51-42-21 AND S+SEA 72-2020-163 REV P1 DATED 03/06/20.Aug 11, 2020 · N228PS · Bombdr CL6002D15SDR SWAA2020081707832Floorbeam · corrodedCORROSION FOUND AT AFT GALLEY BELOW FLOOR PNL AT DOOR 2R AFT SERVICE. MATERIAL REMOVED BEYOND LIMITS PER SRM 53-70-51-1A-1. PERMANENT REPAIR REQUIRED STA 986.5 RH DOOR OPENING. / PERFORMED REPAIR AT FLOOR BEAM BS 986.5 RBL 20 TO RBL 51 UPPER FLANGE IAW B737-7 Aug 10, 2020 · N7716A · Boeing 73776NSDR UIEA2020081321677Floorbeam · crackedM/D BS 1200 LBL 98 TO 125 BELOW FLOOR INTERCOSTAL WEB FOUND CRACKED. REPAIRED IAW SRM 53-40-51-2R-9, REPAIR 9, AND RI-53-40-14131, REV A.Aug 10, 2020 · N486MC · Boeing 74745EFSDR UIEA2020081321678Floorbeam · crackedM/D BS 1200 RBL 98 TO 125 BELOW FLOOR INTERCOSTAL WEB FOUND CRACKED. REPAIR IAW SRM 53-40-51-2R-9, REPAIR 9, AND RI-53-40-14131, REV A.Aug 10, 2020 · N486MC · Boeing 74745EFSDR UIEA2020081321680Floorbeam · crackedM/D BS 1180 RBL 98 TO 125 BELOW FLOOR INTERCOSTAL WEB FOUND CRACKED. REPAIR AS PER SRM 53-40-51-2R-8, REPAIR 8, AND RI-53-40-14131, REV A.Aug 10, 2020 · N486MC · Boeing 74745EFSDR UIEA2020081321681Floorbeam · crackedM/D BS 1180 LBL 98 TO 125 BELOW FLOOR INTERCOSTAL WEB FOUND CRACKED. REPAIRED IAW SRM 53-40-51-2R-8 REPAIR 8 AND RI-53-40-14131, REV A.Aug 10, 2020 · N486MC · Boeing 74745EFSDR SWAA2021072207055Floorbeam · crackedBELOW CABIN FLOOR WING CENTER SECTION STA 540 LBL 1 LATERAL FLOOR SUPPORT PANEL BREAK IS CRACKED. [DOT 124-020] / REMOVED LATERAL FLOOR SUPPORT CRACKED STA 540LBL 1' AND INSTERTED NEW FLOOR SUPPORT AS PER SRM 51-40-02-0G-0Aug 9, 2020 · N494WN · Boeing 7377H4SDR AALA202008269002Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE, CORROSION OF FLOORBEAM AT BS 986 BETWEEN LBL42 AND LBL44, MEASURING L=1.0 IN, W=1.0 IN, D=0.06 IN. ACCOMPLISHED PERMANENT REINFORCING REPAIR WITH REPAIR ANGLES AND STRAP IAW SRM 53-00-51-2R-1 AND EA307866.Aug 8, 2020 · N807NN · Boeing 737823SDR SWAA2020081106809Floorbeam · crackedFLOORBEAM BS 540 WAS CRACKED, R & R THE FLOORBEAM IAW SRM 51-10-02, AND SRM 51-40-02.Aug 7, 2020 · N7879A · Boeing 7377K9SDR DALA2020081182755Floorbeam · crackedCRACK ON FLOOR BEAM STRAP AT FWD CARGO COMPARTMENT (C-1) BTW STA 780+120 AND RBL 24.75. REPAIRED PER SRM 53-00-51.Aug 7, 2020 · N585NW · Boeing 757351SDR FDEA202008071796Floorbeam · corrodedUPON REMOVAL OF LAVATORY MODULE IN THE CABIN, RIGHT. BS 420, X -20 - X -27, THE FLOORBEAM STRUCTURE WAS FOUND CORRODED. FLOOR SUPPORT REMOVE AND REPLACED BY FABRICATION PER DOUGLAS DRAWING # WSP0668 REVISION 'B' AND INSTALLED PER MD - 11 AMM 20-50-02 . REPAug 7, 2020 · N585FE · Doug MD11FSDR SWIA2020090952334Floorbeam · corrodedFS 280 FWD FLOOR SUPPORT HAS CORROSION. C-CHECK RO 9/5/2020. REMOVED, REPLACED, AND INSTALLED NEW FLOOR SUPPORT AT FS 280, REF CRJ 700 SRM AND REF DWG.Aug 6, 2020 · N756SK · Cndair CL6002C10SDR SWIA2020090952333Floorbeam · corrodedFS 280 BEAM BETWEEN LBL 9.0 AND RBL 9.0 HAS CORROSION, MARKED. C-CHECK RO 9/5/2020. REMOVED, REPLACED, AND INSALLED NEW UPPER SPLICE STRIP AT FS 280, REF CRJ 700 SRM AND DWG.Aug 6, 2020 · N756SK · Cndair CL6002C10SDR SWAA2020082506413Floorbeam · corrodedAFT CARGO STA. 771 RBL 3; CORROSION ON FLOOR SUPPORT CHANNEL NUTPLATE HOLE. / REPAIRED FLOOR BEAM RBL3 STA 771 PER SRM 53-00-53-2R-2 & TASKCARD # 20-153-01438SEE SA-M 326 : A1200658Aug 5, 2020 · N8324A · Boeing 7378H4SDR SWIA2020082051886Floorbeam · crackedINTERCOSTAL FWD U-BRACKET CRACKED LOCATED AT LBL20, FS.280 FLOOR BEAM. . (C-CHECK) RO 8/18/2020 REMOVED AND REPLACED THE LH LBL20 INTERCOSTAL FWD U BRACKET WITH NEW REF. CRJ 700 SRM.Aug 5, 2020 · N701SK · Cndair CL6002C10SDR SWIA202081951825Floorbeam · crackedCOCKPIT FLOOR STRUCTURE AFT CENTER ANGLE SUPPORT AT FR 12 IS CRACKED. REMOVED AND REPLACED AFT CENTER ANGLE FLOOR SUPPORT@ FR 12. REF SRM.Aug 5, 2020 · N143SY · Emb ERJ170200LRSDR SWIA202008252070Floorbeam · corrodedRBL 9 FLOORBEAM AT BS 581 WAS CORRODED. COMPLIED WITH ALL STEPS OF REO.Aug 4, 2020 · N741EV · Cndair CL6002C10SDR FDEA2020081041833Floorbeam · corrodedBS 458, RBL 12 - 27, FLOORBEAM HAD CORROSION. REMOVED AND REPLACED IAW DWG ABA7425, AND NBA6018. MAJOR REPAIR.Aug 4, 2020 · N304FE · Doug MD1030FSDR VNAA2020080499910Floorbeam · corrodedFS 280 FLOOR SUPPORT CROSSBEAM FLOOR SUPPORT J-ANGLE CORRODED BETWEEN LBL 9 AND RBL 9. LOCATED, DRILLED AND INSTALLED NEW SERVICEABLE FS 280 J ANGLE BETWEEN LBL 9 & RBL 9 IAW CRJ 900 SRM 51-40-11-001-001-A01, 51-42-06-001-001-A01 AND 51-42-21-001-001-A01.Aug 4, 2020 · N574NN · Bombdr CL6002D15SDR SWIA2020091652512Floorbeam · corrodedSERVICE DOOR SURROUND STRUCTURE FS 319 FLOOR SUPPORT BRACKET AT AND ABOVE FLOOR LEVEL IS CORRODED, MARKED. C-CHECK RO 9/12/2020. REPLACED PART, EVALUATED 100% MATERIAL LOSS. REMOVED AND REPLACED WITH NEW PART, REF CRJ200 SRM BOMBARDIER DRAWING. COMPLIED WIAug 2, 2020 · N916EV · Cndair CL6002B19SDR SWIA202052119Floorbeam · crackedFLOORBEAM ATTACHMENT CLIP AT INBOARD RBL9.0 BEAM FS280 CRACKED (C-CHECK) RO 8/28/2020 COMPLIED WITH REPAIR ON FLOOR BEAM ATTACHMENT CLIP AT FS280.00 RBL9 INBD SIDE, REF CRJ200 SRM, AND REO.Aug 2, 2020 · N463SW · Cndair CL6002B19SDR SWIA2020091652509Floorbeam · corrodedRT 559.00+10 TO 559.00+80 RBL 9 FLOOR BEAM HAS CORROSION AS MARKED. C-CHECK RO 9/12/2020. REMOVED AND INSTALLED NEW RBL 9.0 FLOOR BEAM CAP. SEE CONTINUE CARD FOR FURTHER DETAILS, REF REO CRJ200 SRM, DWG. COMPLIED WITH TASK CARD.Aug 1, 2020 · N916EV · Cndair CL6002B19SDR SWIA2020082151966Floorbeam · corrodedCORROSION ON LH FLOOR BEAM SPLICE AT FR90 . REMOVED AND REPLACED LH FLOOR BEAM GUSSET AT FR90 DUE TO OUT OF LIMITS MATERIAL LOSS, IAW SRM.Aug 1, 2020 · N144SY · Emb ERJ170200LRSDR SWIA2020082151960Floorbeam · corrodedLH FR84 CROSSBEAM CORRODED BETWEEN LH BEAM AND LH FLOOR SILL. COMPLIED WITH ETD FOR PERMANENT REPAIR/REMOVAL OF CORROSION ON LH FR84 CROSSBEAM BETWEEN LH BEAM AND LH FLOOR SILL.Aug 1, 2020 · N144SY · Emb ERJ170200LRSDR SWIA202081751819Floorbeam · corrodedCORRODED FLOORBOARD SUPPORT ANGLE OTBD OF R/H SEAT TRACK FRAME 16. REMOVED AND REPLACED FLOORBOARD SUPPORT ANGLE O/B OF R-H SEAT TRACK AT FR 16. REF EMB SRM. SEE CONTINUATION CARD FOR WORK ACCOMPLISHED.Aug 1, 2020 · N174SY · Emb ERJ170200LR
Back to JASC 5315