JASC 5315
Service difficulty reports · 44,218
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR AALA202002049016Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED FLOOR BEAM UPPER T-CAP AT BS 700 AND LBL 48. REPAIRED FLOOR BEAM PER SRM 53-00-51-2R.SDR DALA2020020310819Floorbeam · corrodedCORROSION LEVEL: 2 CABIN FLOOR BEAM STA885 LBL 12 FOUND CORROSION. INSTALLED NEW SPLICE. (LP 1469323)SDR DALA2020020310797Floorbeam · corroded(LOG 1470312) DURING INSPECTION FOUND CORROSION ON BEAM STATION 986.5 RBL 17 TO RBL 45 AND LBL 44 AT PAX CABIN. PERMANENT REPAIR WAS PERFORMED SECTION I ON BEAM STA 986.5 BTW RBL 50 TO LBL 50 AT PAX CAB PER ER/A 585014-14 REV ORIGINAL AND ETI-37-20-302 REV.2.SDR SWAA2020021941491Support Angle · crackedFLOOR STRUCTURE SUPPORT ANGLE CRACKED AT BS. 540, BETWEEN LBL 24.5 TO RBL 24.5. / R&R SUPPORT ANGLE IAW SRM.SDR SWAA2020021941477Floorbeam · crackedFLOOR STRUCTURE ANGLE CRACKED AT BS. 685, BL 0, PASSENGER CABIN CENTER SECTION. / R&R ANGLE IAW DWG AND SRM.SDR DALA2020020300844Floorbeam · corrodedSHIP 5655 INITIAL INSPECTION: CORROSION ON BEAM STA 377 RBL 20 TO LBL 20 AT FWD WET AREA. CORRECTIVE ACTION: SUMMARY: OF NRC 00425 CORROSION LEVEL 2 ON FLOOR BEAM STA 377 RBL 20 TO LBL 20 WAS REPAIRED PER. B757-200 S.R.M. (1467554)SDR DALA2020020300843Floorbeam · corrodedSHIP 5655 CORROSION ON BEAM , STA 365 BTW RBL 5 AND 7 , ALSO BTW RBL 24 AND 27 , (IN REF, NRC 00423). CORRECTIVE ACTION: SUMMARY: OF NRC 00425 CORROSION LEVEL 2 ON FLOOR BEAM AT STA 365 BTW RBL 5 AND 7 , ALSO BTW RBL 24 AND 27 (IN REF, NRC 00423) WAS REPAIRED SDR SIMA202002030004Floorbeam · corrodedLH OMEGA BEAM IS CORRODED AT FRAME 29-C/A-ACCOMPLISHED REPAIR TO LH OMEGA BEAM CORROSION AT FRAME 29 IAW ERS-EM-53MR-4020 PT. A REV: ORIGINALSDR SWAA2021082520777Floorbeam · corroded***CORROSION*** IN AFT CARGO BAY ON AFT BULKHEAD CENTER PANEL LOWER SUPPORT AT B.S. 947; R.B.L. 12-21; W.L. 155. / DAMAGE ON ACB AFT BULKHEAD LOWER SUPPORT BS 947 BL 21L - 21R WL-155 FOUND TO BE OUT OF LIMITS DUE TO NO LIMIT ON SRM 51-10-02-0G-0 PAR. 9C LOCATESDR F3LA2020032580023Floorbeam · corrodedSUPPLEMENT 03/25/2020: SUPPLEMENT TO ORIGINAL SUBMISSION WITH A NEW UNIQUE CONTROL NUMBER. DISCREPANCY: REFERENCE PEMCO N/R # 2733N570 - Y765 CORRODED AT FRAME 66-70. CORRECTIVE ACTION: REMOVED AND REPLACED FLOOR BEAM - Y765 AT FRAME 66-70 IAW A320 SRM 51-42-1SDR SWAA2020021941490Support Angle · crackedAFT CARGO COMPARTMENT ANGLE SUPPORT CRACKED AT BS. 727, BETWEEN RBL 3 TO RBL 8. / R&R SUPPORT ANGLE IAW SRM AND DWG.SDR SWAA2021072722580Floorbeam · crackedCABIN FLOOR STRUCTURE; PANEL BREAK CRACKED AT FASTENER STA 540 LBL 1 WL 208 / REPLACED CABIN FLOOR STRUCTURE PANEL BREAK IAW SRM 51-40-02 AND BOEING DWG 143A5240 REV- STA 540 LBL 1. 'A' TAG WN6323SDR F3LA2020032580021Floorbeam · corrodedSUPPLEMENT 03/25/2020 - THIS IS A SUPPLEMENT TO THE ORIGINAL SUBMISSION WITH A REVISED UNIQUE CONTROL NUMBER - ORIGINAL NUMBER WAS F3LA202002110019- NEW NUMBER IS F3LA202001280021. DISCREPANCY: REFERENCE PEMCO N/R # 2733N567 - Y1292 CORRODED AT FRAME 66. CORRESDR F3LA2020032380020Floorbeam · corrodedDISCREPANCY: REFERENCE PEMCO N/R # 2733N567 - Y1292 CORRODED AT FRAME 66. CORRECTIVE ACTION: REMOVED AND REPLACED FLOOR BEAM - Y1292 AT FRAME 66 IAW A320 SRM 51-42-11 PAR. D AND 51-72-11.SDR K11A2020031303Floorbeam · corrodedFLOORBEAM LOWER SURFACE HAS POSSIBLE CORROSION @ CLIP NUT HOLES STA 1130 RBL 24 - 48SDR AALA202002079012Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED MID CABIN FLOOR SUPPORT AT BS 538 BETWEEN BL 0 AND LBL 23. REPLACED FLOOR SUPPORT PER AARD 51-00-05-1SDR DALA2020013180737Floorbeam · corrodedCORROSION FLOOR SUPPORTS STRINGER STA 1467 LBL 2,90 RBL 2.90, RBL 7.55 ,RBL 10.45 RBL 16.10 AT AFT CARGO. CORRECTIVE ACTION: CORROSION LEVEL 2. REPAIRED PER B757-300 SRM 53-00-53-1 PAR 4 STEP M AND N.SDR DALA2020013180736Floorbeam · corrodedCORROSION ON THE FLOORBEAM, BS 1330, LBL 2.90, LBL 7.55, LBL 10.45 AND LBL 16.10 IN THE AFT CARGO COMPARTMENT. REPAIRED IAW SRM 53-00-53-2R-1, PAR 4, STEP M AND N.SDR C77A202001280054Floorbeam · corrodedTHIS EO IS BEING ISSUED TO PROVIDE INSTRUCTIONS TO ACCOMPLISH THE PERMANENT REPAIR OF CORROSION DAMAGE
DISCOVERED DURING BASIC CHECK AT EAMS ON THE UPPER FLANGE OF THE FR84 CROSSBEAM IN THE CABIN FLOOR STRUCTURE OF THE CENTER FUSELAGE III. THE DAMAGE IS LOCASDR VNAA2020012899904Floorbeam · crackedLH FS280 CROSSBEAM IS CRACKED JUST O/B OF LBL9. REMOVED UNSERVICEABLE LH FS 280 CROSSBEAM, LOCATED & DRILLED NEW SERVICEABLE LH FS 280 CROSSBEAM PN CC670-34094-1 IAW SRM 51-40-11-001-001-A01, 51-42-06-001-001-A01, 51-42-13-001-001-A01 AND 51-42-21-001-001-SDR VNAA2020012899903Floorbeam · crackedFLIGHT DECK FLOORBEAM AT RBL 9.00 IS CRACKED JUST FWD OF FS 280. REMOVED 221ALF RH FLOOR SUPPORT ANGLE IAW SRM 51-42-06-001-001-A01, 51-42-21-001-010-A01. CUT AWAY DAMAGE RH FLOOR BACK IAW REO 670-53-11-896 REV-, REPAIR C STEPS 1,2. PERFORMED EDDY CURRESDR VNAA2020012899902Floorbeam · crackedFLIGHT DECK FLOORBEAM AT LBL 9.00 IS CRACKED JUST FWD OF FS 280. REMOVED 221ALF LH FLOOR SUPPORT ANGLE AND FOUND TO BE CRACKED IAW SRM 51-42-06-001-001-A01, 51-42-21-001-001-A01. CUT AWAY DAMAGE AT LH FLOOR BEAM IAW REPAIR C STEP 1,2 REO 670-53-11-896 REV--.SDR K11A2020022672501Floorbeam · corrodedFLOORBEAM LOWER CHORD CORRODED @ STA 1070 RBL 55SDR SWAA2020021214232Floorbeam · corrodedFLOOR BEAM HAD AREAS CORRODED ON UPPER FLANGE AT BS. 270, BETWEEN LBL 10 TO RBL 10. / REPAIRED SECTION IAW EA.SDR SWAA2020021214231Floorbeam · crackedSUPPORT UNDER COCKPIT FLOOR CRACKED AT BS. 250, BETWEEN LBL 15 TO LBL 5. / R&R SUPPORT IAW SRM AND DWGSDR SWAA2020021041162Floorbeam · corrodedAFT CARGO BILGE AREA STA 887 TOP OF BOTTOM WEB, FLAT SUPPORT FLOOR FITTING CORRODED AT BS. 887, BETWEEN RBL 15 TO LBL 15. / R&R "TEE" SUPPORT STRAP PER DWG.SDR SWAA2020021041133Strap · corrodedAFT CARGO COMPARTMENT BILGE FLOOR SUPPORT STRAP CORRODED AT BS. 767+5, BETWEEN RBL 11 TO LBL 11. / R&R "TEE" SUPPORT STRAP PER DWG.SDR SWAA2020020440972Floorbeam · crackedFLOOR SUPPORT CRACKED AT BS. 540, BETWEEN BL 0 TO LBL 24.5. / R&R FLOOR SUPPORT PER SRM AND DWG.SDR SWAA2020020440971Floorbeam · crackedFLOOR SUPPORT CRACKED AT BS. 540, BETWEEN BL 0 TO RBL 24.5. / R&R FLOOR SUPPORT PER SRM & DWG.SDR DALA2020013170732Floorbeam · corrodedCORROSION BETWEEN FLOOR SUPPORTS, RBL 10 TO LBL 10, BS 1510 IN THE AFT CARGO COMPARTMENT. REPAIRED IAW SRM 53-00-53-2R-1, REPAIR 1.SDR DALA2020013080712Floorbeam · corroded(AIRCRAFT 5647, L/P 1464249) CORROSION ON STA. 1470 STRINGERS RBL 16.10, RBL 10.45, RBL 7.55 AND RBL 2.90 AT AFT CARGO COMPARTMENT FLOOR STRUCTURE. CORRECTIVE ACTION: REPAIRED PER B757-200 SRM 53-00-53-2R-1 REPAIR 1.SDR DALA2020012870635Floorbeam · crackedINITIAL INSPECTION: CRACKED FLOOR SUPPOR ON STA 1003 BTW X=10 AT PAX CABIN AREA (CPAX). SUMMARY OF NRC S/N 00837: CRACKED FLOOR SUPPOR ON STA 1003 BTW X =10 AT PAX CABIN AREA (CPAX) WAS REPLACED PER MD-90 SRM 51-30-05 VOL.II. (LP# 1463142)SDR DALA2020012870634Floorbeam · crackedINITIAL INSPECTION: CRACKED FLOOR SUPPOR ON STA 1022 BTW X=15 AT PAX CABIN AREA (CPAX). SUMMARY OF NRC S/N 00835: CRACKED FLOOR SUPPOR ON STA 1022 BTW X =15 AT PAX CABIN AREA (CPAX) WAS REPLACED PER MD-90 SRM 51-30-05 VOL.II. (LP# 1463137)SDR DALA2020012700633Floorbeam · crackedINITIAL INSPECTION: CRACKED FLOOR SUPPOR ON STA 1041 BTW X=15 AT PAX CABIN AREA (CPAX). SUMMARY OF NRC S/N 00836: CRACKED FLOOR SUPPORT ON STA 1041 BTW X=15 AT PAX CABIN AREA (CPAX) WAS REPLACED PER MD-90 SRM 51-30- 05 VOL.II. (LP#1463134)SDR SWAA2020051829281Floorbeam · corrodedAFT CABIN FLOOR BEAM STA 947; LBL51; WL208 HAS CORROSION AROUND EQUIPMENT FITTING / BLENDED CORROSION ON AFT CABIN FLOOR BEAM STA 947 LBL 51 VERIFIED MATERIAL LOSS ORG 'T' .185 REMAINING .116 LOSS OF .069 FOUND TO BE OUT OF LIMITS AFT CABUIN FLOOR BEAM STA 947SDR SWAA2020051829280Floorbeam · corrodedAFT CABIN FLOOR BEAM STA 947; LBL25; WL208 HAS CORROSION AROUND EQUIPMENT FITTING / BLENDED CORROSION ON AFT CABIN FLOOR BEAM STA 947 LBL 25 EVALUATED MATERIAL LOSS ORG 'T' .185 REMAINING 'T' .130 LOSS OF .055 FOUND TO BE OUT OF LIMITS ACCOMPLISHED REPAIR ON ASDR SWAA2020020641098Floorbeam · corrodedAFT CABIN FLOOR BEAM CORRODED AT BS. 947, LBL 2. / REPAIRED FLOOR BEAM IAW SRM.SDR DALA2020013070708Angle · corrodedCORROSION ON FLOOR SUPPORT ANGLE STA: 780 AND LBL. 65 AT MID WET AREA, CP53-231-01L. CORRECTIVE ACTION: CORROSION LEVEL 2. REPAIRED PER B757-200 SRM 53-00-13-2R REPAIR. 2.SDR SWAA2021072729228Tee Fitting · corrodedAFT CARGO FLOOR STRUCTURE 'T' STRAP CORRODED STA 767+5' LBL 22 TO RBL 22 WL 156 / BLENDED CORROSION OF NAFT CARGO FOOR STRUCTURE 'T' STRAP IAW B737 SRM 51-10-02-0G-0. VERIFIED MATERIAL LOSS TO BE 100%. FOUND TO BE OUT OF LIMITS IAW B737 SRM 53-00-53-1A-2. REPLSDR K11A2020031104Floorbeam · corrodedFLOORBEAM CORROSION STA 950C LBL 46 TO 64SDR REXA2020020500163Floorbeam · cracked"UPON REMOVAL OF R/H CAP ANGLE AT FS280 FOUND SEVERAL AREAS OF CORROSION ON FS280 R/H BEAM. "PAINTED AND APPLIED CIC TO REPAIR AREA IAW CRJ 900 SRM 51-25-16-001-00
1-A01 TR 51-0065 AND 51-21-11-001-001-A01.SDR SWAA2020022874890Floorbeam · corrodedFLOOR BEAM CORRODED AT BS. 986, BETWEEN LBL 43 TO RBL 37. / REPAIRED FLOOR BEAM PER SRM AND EA.SDR SIMA202002034003Floorbeam · corrodedRH FLOOR BEAM AT FS280.00 IS CORRODED IN NUMEROUS SPOTS, WHERE IT IS SANDWICHED BETWEEN DRIP TRAY AND L ANGLE OF THE BULKHEAD. -C/A-REMOVED AND REPLACED RH FLOOR BEAM AT FS280.00 IAW SRM 51-42-06 AND SRM 51-42-13.SDR REXA2020021203191Floorbeam · crackedFS 280 FLOORBEAM ATTACH CLIP OB SIDE OF RBL9 IS CRACKED
RECEIVED NEW CLIP PM#CC670-34261-4 REF JOB 81516725-5057 FOR INSTALL. WVAC EMP #6029SDR SIMA20200203004Floorbeam · corrodedLH FLOOR BEAM AT FS280.00 IS CORRODED IN NUMEROUS SPOTS, WHERE IT IS SANDWICHED BETWEEN DRIP TRAY AND L ANGLE OF THE BULKHEAD. -C/A-RAR'D LH FLOOR BEAM AT FS2800.00 IAW SRM 51-42-06 AND 51-42-13SDR DALA2020012730619Floorbeam · corrodedCORROSION ALONG THE FLOORBEAM UPPER SUPPORT BS 1640, RBL 5 TO RBL 20 IN THE PAX CABIN. FOUND TO BE OUT OF LIMITS IAW SRM. THE FLOORBEAM WAS REPAIRED IAW SRM.SDR F3LA2020032580022Floorbeam · corrodedSUPPLEMENT 03/25/2020: SUPPLEMENT TO ORIGINAL SUBMISSION TO SHOW A NEW UNIQUE CONTROL NUMBER - ORIGINAL NUMBER WAS F3LA202001280019, NEW UNIQUE CONTROL NUMBER IS F3LA202001280022. DISCREPANCY: REFERENCE PEMCO N/R # 2733N395 - Y1162 CORRODED AT FRAME 68-69. CORSDR SWIA2020021848682Floorbeam · crackedLBL12 CRACKED @ 280 (C-CHECK) RO:2/14/2020NEW L/H CENTER COCKPIT FLOOR BEAM SEGMENT AND REPAIR PARTS AT 280 LBL 12.0 INSTALLED REF CRJ 700 SRM / COMPLIED WITH SKY CARD (CL600-2C10) STRUCTURAL MAJOR REPAIR (**RII**) / COMPLIED WITH FORM M-337SDR SWIA2020021848681Floorbeam · crackedRBL 12 CRACKED @ 280 (C-CHECK) RO:2/14/2020REPLACED CENTER COCKPIT FLOOR BEAM AT RBL 12 F.S. 280 TO FOM REF. CRJ 700 SRM TASK / COMPLIED WITH SKY CARD STRUCTURAL MAJOR REPAIR (**RII**) / COMPLIED WITH FORM M-337SDR FDEA2020012320198Floorbeam · corrodedMAIN DECK STA 1055 BETWEEN BL0-RBL 24.75 FLOOR SUPPORT CORRODED. ACCOMPLISHED IAW EA F-5310-T0352036 P1 FUSELAGE - MAINFRAME -MAIN CARGO FLOOR SUPPORT STA 1055 CORRODED, NEW PART FABRICATION TEMPER ATERATION, REMOVED CORR IAW SRM 51-10-02-OG, FOUND TO BE OUT L
Back to JASC 5315