JASC 5315
Service difficulty reports · 44,218
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR SWIA2020033049556Floorbeam · corrodedTHE FLOORBEAM AT LBL9.00 FROM FS409.00 TO FS409.00+128 HAS MULTIPLE LOCATIONS OF CORROSION. (MARKED) (C CHECK) RO 3/27/2020 REMOVED CORROSION FROM FLOOR BEAM AT LBL 9.00 FROM FS. 409.00 TO FS. 409.00+128 IAW REO ( SEE CONTINUATION CARD FOR DETAILS ).SDR SCNA2020031913005Floorbeam · corrodedCORROSION ON TCAP OF BEAM STA 986.5 FROM BL 0 TO BL 45R WL 208 REMOVED AND REPLACED TCAP ON BS 986.TO RBL 45 TO LBL 45, PER B7374 800 SRM 53-10-51 REP 4.SDR COEA2020030402819Floorbeam · corrodedWO 211121 NR 100060 HEAVY CHECK COE/MAJOR REPAIR: FLOORBEAM 38 FROM R/H SEAT TRACK TO R/H OUTBOARD END OF FLOORBEAM HAS LEVEL 2 CORROSION. CORRECTIVE ACTION: REPAIRED PER SRM 530000-300-856-A01.SDR CALA2020021600429Floorbeam · corrodedB737-06-3-0288 FWD FLOOR STRUCTURE WET AREA FLOOR BEAM UPPER CHORD HAS EVIDENCE OF LIGHT SURFACE CORROSION BS 344 BETWEEN LBL 17 AND 17 APROX MKD 126-35 AS PER T/C 58-53-00-1-2700 REF AAR N/R 99870636 REMOVED AND REPLACED EXISTING TRAPED FILLERS AND STRAP SDR VNAA2020021399904Strap · corrodedFS 559 FLOOR SUPPORT STRAP CORRODED BETWEEN LBL 45 AND LBL 27. REMOVED SUPPORT STRAP BETWEEN LBL 45 AND LBL 27 IAW CRJ 200 SRM 51-42-06. LOCATED AND DRILLED NEW SUPPORT STRAP BETWEEN LBL 45 AND LBL 27 FS 559 IAW CRJ 200 SRM TR 51-42, 51-42-06.SDR VNAA2020021399903Strap · corrodedFS 559 FLOOR SUPPORT STREP CORRODED BETWEEN RBL 27 AND RBL 45. REMOVED FLOOR SUPPORT STRAP BETWEEN RBL 27 AND RBL 45 IAW SRM 51-42-06. LOCATED AND DRILLED NEW SUPPORT STRAP BETWEEN RBL 27 AND RBL 45 IAW CRJ 200 SRM TR 51-42. INSTALLED NEW SUPPORT STRAP BETSDR AALA2020031879033Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FORWARD CABIN WET AREA FLOOR BEAM AT FR 16 AND +Y1292. REPLACED FLOOR BEAM PER SRM 51-72-11.SDR SWAA2020030442025Floorbeam · corroded***CORROSION*** BS 986 FLOOR BEAM HAS CORROSION AT FASTENER HOLES ON TOP FORWARD FLANGE AT RBL 39.75 AND RBL 43.25. WL 208 CORROSION ON STA 986 FLOOR BEAM AT RBL 39.75 AND RBL 43.25 WL 208 MEASURES L 6.5" X W 1.15" X D .050" FOUND TO BE OUT OF LIMITSDR SWAA2020021984437Floorbeam · crackedCABIN FLOORBOARD TRANSITION INTERCOSTAL SUPPORT CRACKED AT BS. 540, BETWEEN BL 0 TO RBL 25. / R&R SUPPORT PER SRM.SDR A6WA2020021247168Strap · corrodedFLOOR SUPPORT STRAP IS CORRODED AT FS559.00+112, RBL27-RBL45. AIRCRAFT REMOVED FROM SERVICE BLENDED TO REMOVE CORROSION ORIGINAL MATERIAL .100 MATERIAL LOSS .013 REMAINING MATERIAL .087 ALLOWABLE LOSS .010 REMOVED AND REPLACED STRAP IAW CRJ200 SRM 51-42-06SDR SWIA2020032649378Floorbeam · corroded* THE FLOORBEAM AT LBL27.00 FROM APPROX. FS559.00+80 TO FS574.00 HAS CORROSION. (MARKED) (C-CHECK) RO 3/25/2020 BLENDED CORROSION FROM FLOOR BEAM AND FOUND TO BE OUT OF LIMITS. REMOVED DAMAGE FLOOR BEAM AT LBL27.00 FS559+10 TO FS569.00 REF CRJ200 SRM. REPSDR SWIA2020032649373Bracket · cracked* FLOOR BEAM BRACKET AT FS461, LBL27, INBOARD, IS CRACKED (C-CHECK) RO 3/25/2020 REMOVED AND INSTALLED NEW FLOOR BEAM BRACKET AT FS.461 INBD OF LBL.27 REF CRJ 200 SRM AND BOMBARDIER DWG. SEE CONTINUATION CARD FOR DETAILSSDR SWIA2020032649369Floorbeam · corroded* THE FLOORBEAM AT RBL 9.00 FROM FS559.00+48 TO FS559.00+80 APPROX. HAS CORROSION IN MULTIPLE LOCATIONS. (MARKED) (C-CHECK) RO 3/25/2020 REPAIRED FLOORBEAM AT RBL 9.00 FROM FS559.00+48 TO FS559.00+80 REF CRJ-200-SRM. SEE CONTINUATION CARD FOR DETAILSSDR SWIA2020032649367Floorbeam · corroded* FS280 FLOOR BEAM IS CORRODED BETWEEN LBL9 AND RBL9, MARKED. (C-CHECK) RO 3/25/2020 REPAIRED FS280 BULKHEAD WEB BETWEEN LBL20.75 AND RB20.75 AND INSTALLED NEW RECEPTABLE , REF REO. SEE CONTINUATION CARD FOR DETAILSDR SWAA2020022841926Floorbeam · corrodedFLOOR BEAM VERTICAL WEB CORRODED AT BS. 259, BETWEEN RBL 3.5 TO RBL 7. / REPAIRED WEB PER EA.SDR SWAA2020022641708Floorbeam · crackedFLOOR SUPPORT CRACKED AT B.S. 540, BETWEEN RBL 1 TO RBL 24. / R&R FLOOR SUPPORT IAW SRM & DWG.SDR SWAA2020022641707Floorbeam · crackedFLOOR SUPPORT CRACKED AT BS. 540, BETWEEN LBL 1 TO LBL 24. / R&R THE FLOOR SUPPORT IAW SRM & DWG.SDR SWIA2020031649306Floorbeam · corrodedFLOOR BEAM CAP AT LBL.27 HAS SIGHNS OF CORROSION AND GOUGING FROM FS.569-FS.610 (INBD AND OTBD FLANGES) (C-CHECK) RO 3/13/2020 REPLACED FLOOR BEAM CAP AT LBL27 . FS 569.00 TO FS 610.00 REF CRJ 200 SRM, BOMBARDIER DWG AND REO. SEE CONTINUE CARD FOR DETAILSDR SWIA2020031649305Floorbeam · corrodedFLOOR BEAM CAP AT LBL.27 HAS SIGHNS OF CORROSION AND GOUGING FROM FS.559+80-FS.569 (INBD AND OTBD FLANGES) (C-CHECK) RO 3/13/2020 FLOOR BEAM CAP AT LBL 27 REPAIRED FROM FS569 TO FS559+10 REF CRJ200 SRM AND BOMBARDIER REO. SEE CONTINUATION CARD FOR WORK DSDR SCNA2020031908016Floorbeam · corrodedCORROSION ON LWR FLANGE FROM T CAP BEAM AT STA 986.5 BL 447 REMOVED CORROSION ON T CAP BS 986.5 BL44.7 OUT OFF LIMITS REPLACED T CAP PER WORK ORDER 3500849/2400/0002SDR AALA2020031149044Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON MAIN CABIN FLOOR BEAM AT BS 345 BETWEEN LBL 1 AND LBL 6. REPAIRED PER SRM 53-00-51-2R-5.SDR A6WA20200207156Strap · corrodedFLOOR STRAP AT FS559.00, RBL 45 TO RBL 27, IS CORRODED. AIRCRAFT REMOVED FROM SERVICE REMOVED AND REPLACED FLOOR STRAP IAW CRJ200 SRM 51-42-06 AND TR 51-42.SDR AALA2020031149039Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON MAIN DECK FLOOR BEAM / SEAT TRACK FLANGE BETWEEN BS 377.7 AND BS 440 AT LBL 24.75. REPAIRED FLOOR BEAM / SEAT TRACK FLANGE PER SRM 53-00-52-1A.SDR SWIA2020021848720Floorbeam · corrodedOUTBOARD ANGLE P/N: CC670-34269-4 AT RBL 9 AT FS 280.00 CORRODED THROUGH. (C-CHECK) RO:2/14/2020REPLACED NEW ANGLE P/N: CC670-34269-4 AT RBL 9 AT FS 280.00 REF CRJ-700 SRMSDR P5CA2020021300030Floorbeam · corrodedFOUND CORROSION AT STA 1740 LBL 110. M/D FLOOR STRUCTURE UPPER CAP.(<P>REMOVE DAMAGED PART IAW SRM 51-40-02 REV. 87. INSTALL NEW PART IAW SRM 51-40-02 REV. 87 AND EI NO. T2020A53M-262 REV.1 AND DWG NO. 65B17764 SHEET 4, REV. E AND DWG NO. 14641941 SHEET 79, RESDR P5CA2020021300032Floorbeam · wornWORN DAMAGE IN FASTENER HOLES OF MAIN DECK FLOOR BEAM UPPER CHORDS AND INTERCOSTAL AT STA 1380, RBL 11.(<P>ACCOMPLISHED EI NO. T2020A53M-154 REV. 1. JOB COMPLETED AND CONDITION CHECK NORMAL.</P>)SDR P5CA2020021300036Floorbeam · dentedDENT - WEB, AFT CARGO FLOOR STRUCTURE AT STA 1673 RBL 16.(<P>ACCOMPLISHED JOB IAW EI NO. T2020A53M-111 REV. 2. CONDITION CHECK NORMAL AND JOB COMPLETED. </P>)SDR P5CA2020021300037Floorbeam · corrodedCORROSION ON THE ANGLE OF FLOOR BEAM CAP AT STA 2300, NEAR LBL 11.(<P>ACCOMPLISHED EI NO. T2020A53M-265 REV. 1. JOB COMPLETED AND CONDITION CHECK NORMAL.</P>)SDR SWAA2020031742537Floorbeam · corrodedTOP OF FLOOR BEAM STA 987 RBL 37 WL 208 CORROSION FOUND ON EXISITING T CAP REPAIR. REMOVED EXISTING T-CAP REPAIR FROM TOP OF FLOOR BEAM STA 987 RBL 37 WL 208. VERIFIED REPAIR PARTS IAW BAC1490-2811, ATAG A06033 & BAC1490-2887, ATAG A47859, ATAG 09055 &SDR K11A2020031302Floorbeam · corrodedFLOORBEAM UPPER SURFACE HAS POSSIBLE CORROSION @ CLIP NUT HOLES STA 1030 RBL 24-48SDR K11A2020031101Floorbeam · corrodedFLOORBEAM CORROSION STA 950C RBL 50-59SDR SWAA2020022841924Floorbeam · corrodedFLOOR BEAM AFT CHORD CORRODED AT BS. 259, BETWEEN LBL 3 TO RBL 5. / REPAIRED FLOOR BEAM AFT CHORD PER ER AND EA.SDR V0XD2020020510305Floorbeam · crackedRH AND LH 280 BEAMS ARE CRACKED. REMOVED AND REPLACED THE LH AND RH 280 BEAMS IAW GOJET EO C700-53MR-011 DATED 01/07/2019.SDR SWIA2020031649299Floorbeam · corrodedFS 409.00+112 TO FS 409.00+128 FLOOR BEAM AT RBL 9 HAS CORROSION ON INBD FLANGE AROUND NUTPLATES (C-CHECK) RO 3/13/2020 PERFORMED A REPAIR ON FS 409.00+112 TO FS 409.00+128 FLOOR BEAM AT RBL 9 HAS CORROSION ON INBD FLANGE AROUND NUTPLATES REF REO COMPLIED SDR SWIA2020031649298Floorbeam · corrodedFLOOR BEAM CAP FROM FS 409.00 TO FS 409.00+112 AT RBL 9 HAS CORROSION ON INBD FLANGE AND OTBD FLANGE (C-CHECK) RO 3/13/2020 REMOVED AND INSTALLED NEW FLOOR BEAM CAP SECTION AT RBL 9 BETWEEN FS409.00-FS409+112. REF BOMBARDIER REO, BOMBARDIER DWG, CRJ200 SRMSDR SWIA2020031649296Floorbeam · gouged* FLOOR BEAM CAP FROM FS559+96 THROUGH FS559+112, LBL12, IS GOUGED, MARKED IN RED. (C-CHECK) RO 3/13/2020 REMOVED AND REPLACED FLOOR BEAM CAP (PLATE) BETWEEN FS 559+96 TO FS 559+112 AT LBL 12 REF CRJ-200 SRM, BOMBARDIER DWG. RESTORED FINISH AND APPLIED CISDR SWIA2020031649295Floorbeam · corroded* FLOOR BEAM AT LBL9, OUTBOARD FLANGE HAS CORROSION BETWEEN FS589 AND FS605, MARKED IN RED (C-CHECK) RO 3/13/2020 REMOVED AND REPACED WITH NEW BEAM CAP AT LBL 9.0 FS589 AND FS605 REF CRJ 200 AND BOMBARDIER REO. COMPLIED WITH TASK CARD.SDR AALA2020022049035Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM T CAP FASTENER HOLE FOR THE GIRT BAR FITTING AT BS 986 AND LBL 45. REPAIRED FLOOR BEAM PER EA 302861 AND SRM 53-70-51-2R-6.SDR SWAA2020022041600Floorbeam · corrodedUPPER FLOOR BEAM CHORD CORRODED AT BS. 260, BETWEEN LBL 34 TO RBL 34. / R&R FLOOR BEAM CHORD IAW DWG AND SRM.SDR ASAA2020040632605Floorbeam · corrodedRIGHT HAND FLOOR BEAM -Y1162 UPPER SURFACE CORRODED AT SPLICE AT FRAME 68 GROUNDED - YES. REMOVED AND REPLACED FLOOR BEAM IAW A320 SRM 51-42-11, AND AIRBUS DWG D53472458. CAT A REPAIRSDR SCNA2020031903010Floorbeam · corrodedCORROSION ON T CAP BEAM ON STA 947.5 AT BL 25R TO BL 55R. REMOVED T CAP AND REPLACED T CAP ON STA 947.5 PER B737-800 SRM 53-70-51 REP 5.SDR SWIA2020031649282Floorbeam · corroded*PASSENGER CABIN FLOOR SUPPORT STRUCTURE I/B OF LBL9 BETWEEN FS409.00 AND 409+128 HAS AREAS OF CORROSION.(MARKED) (C-CHECK) RO 3/13/2020 PERFORMED CABIN FLOORBEAM CAP SPLICE REPAIR TO F.S 409 TO F.S 409+128 LBL 9 FLOORBEAM REF. CRJ-200 SRM. COMPLIED WITH TSDR SWAA2020022641735Floorbeam · corrodedFLOOR BEAM CORRODED AT BS. 986.5, BETWEEN LBL 47 TO RBL 47, UPPER SURFACE. / REPAIRED FLOOR BEAM IAW EA.SDR SWAA2020022654716Floorbeam · corrodedFLOOR BEAM, UPPER SURFACE, CORRODED AT BS. 328, BETWEEN RBL 30 TO RBL 55. / REPAIRED FLOOR BEAM UPPER CHORD IAW SRM & AMM.SDR AALA2020022049036Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM AT BS 986.5 AND RBL 42. REPAIRED FLOOR BEAM PER EA 303034 AND SRM 53-00-51-2R.SDR SWAA2020020641096Floorbeam · crackedMAIN CABIN LOWER FLOOR SUPPORT ANGLE CRACKED AT BS. 540, LBL 1. / R&R ANGLE PER SRM.SDR CALA2020020300311Floorbeam · corrodedAFT WET AREA FLOOR STRUCTURE FLOOR BEAM 986 RBL 46 TO LBL 46 HAS CORROSION REF FLEET CYCLE LOG PAGE 9722781 REPAIRED 986.5 FLOOR BEAM PER SRM 53-70-51 REPAIR 4 ALTERNATIVE 1. (SEE FLEETCYCLE LOGPAGE 9722781 FOR WORK PERFORMED)SDR A6WA202020347145Floorbeam · corrodedFLOOR SUPPORT IS CORRODED AT FS589.00, LBL 9 TO LBL 27. AIRCRAFT REMOVED FROM SERVICE INSTALLED NEW FABRICATED CAP STRIP AT FLOOR SUPPORT AT FS589.00, LBL 9 TO LBL 27 IAW CRJ200 SRM 51-42-06, 51-24-36 AND TR 51-42.SDR AALA202002049018Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED FLOOR BEAM UPPER T-CAP AT BS 700 AND LBL 48. REPAIRED FLOOR BEAM PER SRM 53-00-51-2R.SDR AALA202002049017Floor Support · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED FLOOR BEAM UPPER T-CAP AT BS 700 AND LBL 24. REPAIRED FLOOR BEAM PER SRM 53-00-51-2R.
Back to JASC 5315