JASC 5321
Service difficulty reports · 49,402
Reports filed under 5321 · Fuselage Floor Panel, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5321' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5321' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR UPS08M52327Panel · corrodedINSPECTION TYPE:2C MAIN CARGO RCB PNL NR 3 HAS CORROSION DAMAGE 4 PLACES ON TOP FACE. LOCATED AND DRILLED REPLACEMENT PANEL AND INSTALLED PANEL ON EO MD11-5330-27218-B.SDR UPS08M52334Panel · corrodedINSPECTION TYPE:2C MAIN CARGO RCB PNL NR 1 HAS CORROSION DAMAGE 7 PLACES ON TOP FACE. LOCATED AND DRILLED REPLACEMENT PANEL IAW MD-11 SRM 51-31-01 AND INSTALLED ON EO MD11-5330-27218-B.SDR F3LA200800251Floorboard · damagedDURING C3 S1 C CHECK INSPECTION NOTED AFT CARGO FLOOR PANEL 151DE HAS DAMAGED EDGE AND CORNER. MAINTENANCE CLEANED AND PREPPED AREA, MANUFACTURED DOUBLER AND APPLIED REPAIR TO AREA. MANUFACTURED DOUBLER, APPLIED TREATED AND PRIMED AREA IN ACCORDANCE WITH THESDR F3LA200800249Floor Panel · damagedDURING C3 S1 C CHECK INSPECTION NOTED AFT CARGO FLOOR PANEL 152TG HAS DAMAGED EDGE. MAINTENANCE REPLACED AFT CARGO MID FLOOR PANEL 152TG WITH NEW PANEL. PANEL WAS INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF NON ROUTINE 9623. UPON COMPLETION OF THE REPASDR F3LA200800224Floorboard · corrodedDURING C3 S1 C CHECK INSPECTION NOTED AFT CARGO LEFT FLOORBOARD SUPPORT PROFILE AT STRINGER 38 LEFT BETWEEN FRAMES 56 AND 58 HAS AREAS OF CORROSION AROUND NUT PLATE HOLES. MAINTENANCE REMOVED CORRODED PROFILE AT STRINGER 38 LEFT FROM FRAME 56 AND 58 LEFT AFT SDR F3LA200800223Floorboard · corrodedDURING C3 S1 C CHECK INSPECTION NOTED AFT CARGO LATERAL FLOORBOARD PROFILE AT FRAME 58 BETWEEN STRINGER 38 LEFT AND STRINGER 41 RIGHT HAS AREA OF CORROSION AROUND NUTPLATE HOLES. MAINTENANCE REMOVED AND REPLACED AFT CARGO FLOORBOARD PROFILE AT FRAME STATION 5SDR F3LA200800220Floorboard · corrodedDURING C3 S1 C CHECK INSPECTION NOTED AFT CARGO LATERAL FLOORBOARD PROFILE AT FRAME 56 BETWEEN STRINGER 38 LEFT AND 41 RIGHT HAS AREA OF CORROSION AROUND NUTPLATES. MAINTENANCE REMOVED AND REPLACED AFT CARGO FLOORBOARD PROFILE AT FRAME STATION 56 IN ACCORDANCSDR F3LA200800217Floor Panel · damagedDURING C3 S1 C CHECK INSPECTION NOTED BULK CARGO PANEL 161CF HAS A PUNCTURE. MAINTENANCE CLEANED AREA FOR DAMAGE AND PREPPED, REPAIRED AND APPLIED PRIMER AND TOP COAT IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 51-75-12 AND SRM 51-75-12. UPON COMPLETION OF THSDR F3LA200800216Floor Panel · puncturedDURING C3 S1 C CHECK INSPECTION NOTED CABIN FLOOR PANEL 252HF HAS A PUNCTURE IN THE TOP SURFACE. MAINTENANCE CLEANED AREA, PREPPED AND APPLIED REPAIR IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 PARAGRAPH 8A AND SRM 53-20-00 PARAGRAPH 8A. UPON COMPLETISDR F3LA200800214Floor Panel · puncturedDURING C3 S1 C CHECK INSPECTION NOTED BULK CARGO PANEL 161BF HAS A PUNCTURE. MAINTENANCE CLEANED AREA FOR DAMAGE PREPPED AND REPAIRED, APPLIED PRIMER AND TOP COAT IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 PARAGRAPH C AND SRM 51-75-12 AND SRM 51-75-1SDR F3LA200800213Floor Panel · delaminatedDURING C3 S1 C CHECK INSPECTION NOTED AFT CARGO FLOOR PANEL 151ZG WAS DELAMINATED. MAINTENANCE TRIMMED BACK UPPER SKIN REMOVED CORE AND LOWER SKIN ABRADED BOTTOM SURFACE OF SKIN IN ACCORDANCE WITH THE REQUIREMENTS OF EA A0-53T-10131. MANUFACTURED FILLER PLATSDR F3LA200800212Floor Panel · damagedDURING C3 S1 C CHECK INSPECTION NOTED AFT CARGO MID FLOOR PANEL 152WG HAS DAMAGED END. MAINTENANCE REMOVED DAMAGE AND PREPPED FOR REPAIR IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 PARAGRAPH 8C. APPLIED REPAIR TREATED AND PRIMED AND APPLIED TOP COAT SDR F3LA200800211Floor Panel · puncturedDURING C3 S1 C CHECK INSPECTION NOTED FWD CARGO FLOOR PANEL 132DG HAS A PUNCTURE. MAINTENANCE CLEANED AREA AND PREPPED AND APPLIED REPAIR IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 PARAGRAPH 8C. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUSDR F3LA200800210Floor Panel · puncturedDURING C3 S1 C CHECK INSPECTION NOTED CABIN FLOOR PANEL 241CF HAD A PUNCTURE. MAINTENANCE CLEANED AND PREPPED AREA IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 AND APPLIED REPAIR IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 PARAGRAPH 8C. UPON CSDR F3LA200800209Floor Panel · puncturedDURING C3 S1 C CHECK INSPECTION NOTED FWD CARGO DOOR FLOOR PANEL HAD A PUNCTURE. MAINTENANCE CLEANED AREA, PREPPED AND APPLIED REPAIR IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 PARAGRAPH 8C. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ASDR 08FDEA01584Floor Panel · damagedPANEL 121SF HAS EDGE DAMAGE. FABRICATED NEW FLOOR PANEL 121 SF; POTTED EDGES; COMPLETED CURE & SANDED EDGE POTTING; INSTALLED INSERTS; APPLIED NON-SKID & PART MARKED. REMOVED HAREWARE FROM THE OLD PANEL & REINSTALLED ON THE NEW PANEL IAW DWG SRZ 25-005; SDR UPS08852216Floorboard · damagedINSPECTION TYPE:C3 MAIN CABIN AT STA 1680 AFT FLOORBOARD F213 HAT CHANNEL IS DAMAGED AT EDGE. FABRICATED AND REPLACED HAT CHANNEL ON FLOORBOARD F213 IAW SRM 51-02-0 FIG 52 AND 53-02-00 FIG 002.SDR 08FDEA01529Floorboard · delaminatedEMPENAGE ACCESS THRU 312 AR, THE FLOORBOARD ON THE LEFT SIDE OF THE A/C AFT OF THE PNEUMATIC DUCT AT FRAME 84 IS DELAMINATED. FABRICATED NEW PANEL; LOCATED & DRILLED NEW HOLES; INSTALLED INSERTS; POTTED & CURED BOARD EDGES. SANDED EDGES AS NEEDED; APPSDR 08FDEA01528Floorboard · delaminatedEMPENNAGE ACCESS THRU 312 AR, THE FLOORBOARD ON THE LEFT SIDE OF THE A/C FWD OF THE PNEUMATIC DUCT AT FRAME 84 IS DELAMINATED. FABRICATED NEW PANEL. LOCATED & DRILLED NEW HOLES USING OLD FLOORBOARD AS A TEMPLATE; INSTALLED INSERTS; POTTED & CURED BOARD EDGSDR UPS08852217Floor Panel · crackedINSPECTION TYPE:C3 FLOOR PANEL F80B HAS DENTS AND CRACKS AS MARKED. REPAIRED FLOOR PANEL F80B IAW SRM 53-02-03-0 FIG 10 AND SRM 53-02-03-0.SDR UPS08852183Floor Panel · tornINSPECTION TYPE:C3 FLOOR PANEL F81B HAS 1EA SCREW HOLE TORN THROUGH EDGE. REPAIRED FLOOR PANEL F81B IAW SRM 53-02-03-0 FIG 010 AND SRM 51-1-21.SDR UPS08852182Floor Panel · damagedINSPECTION TYPE:C3 FLOOR PANEL F81/F81A HAS 3 EA. DAMAGED SCREW HOLES AS MARKED. REPAIRED FLOOR PANEL F81/F81A IAW SRM 53-02-03-0 FIG 010 AND SRM 51-1-21.SDR F3LA200800242Floor Panel · damagedDURING C2 C CHECK INSPECTION NOTED AFT PIT FLOOR PANEL 151PE DAMAGED. MAINTENANCE REMOVED AND REPLACED PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF AMM 53-42-17-400-001. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE.SDR F3LA200800241Floor Panel · damagedDURING C2 C CHECK INSPECTION NOTED AFT PIT FLOOR PANEL 151CE DAMAGED. MAINTENANCE REMOVED AND REPLACED THE PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF AMM 53-42-14-400-001. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE.SDR UPS08852395Channel · corrodedINSPECTION TYPE:C3 MAIN CABIN LAV AREA SAT 66-RBL 30, FLOORBOARD BOTTOM U-CHANNEL IS BLOWN OUT. REMOVED AND REPLACED U-CHANNEL ON FLOORBOARD IAW SRM, 53-2-3, 51-3-0, 51-1-8.SDR UPS08852243Floorboard · corrodedINSPECTION TYPE:C3 MAIN CABIN COURIER AREA STA 55 AND RBL 12 FLOORBOARD SKIN CORRODED. REPAIRED FLOORBOARD AT STA 55 AND RBL 12 IAW SRM 53-02-03 FIG 10 AND DWG 5892154.SDR 2008UALA02279Floorboard · damagedCARGO FLOORBOARD RPL S GLS PNL. ACCOMPLISHED MAJOR REPAIR AT LCQ THROUGH UAL EG PROJECT TO REPLACE FLOORBOARDS.SDR 2008UALA02223Floorboard · damagedCARGO FLOORBOARD RPL S GLS PNL. ACCOMPLISHED MAJOR REPAIR AT LCQ AS A PART OF UAL EG PROJECT TO REPLACE FLOORBOARDS.SDR UPS08852093Floor Panel · crackedINSPECTION TYPE:C1 COCKPIT FLOOR PANEL 676D HAS ONE CORNER CRACKED AND ONE CORNER BROKEN OUT. FABBED AND INSTALLED REPAIR DOUBLERS IAW SRM 53-2-0 FIG1 B, 53-7-3, 5 1-1-8, 53-7-3 FIG1 A, 51-1-15.SDR F3LA200800191Floorboard · puncturedDURING C4 S1 C CHECK INSPECTION NOTED FORWARD GALLEY FLOORBOARD 222EF HAS TWO PUNCTURES IN TOP RIGHT EDGE OF FLOORBOARD. MAINTENANCE REPAIRED PUNCTURES IN GALLEY FLOORBOARD 222EF IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-12-00 PAGE 205 AND PAGE 206. MAINSDR ASAA0892898Floor Panel · corrodedAFT CARGO NR 1 FLOOR PANEL HAS CORROSION AROUND EDGES. REMOVED DAMAGED FLOOR PANEL, FABRICATED, LOCATED, DRILLED AND INSTALLED A REPLACEMENT FLOOR PANEL IAW B737 900 SRM 51 10 02 PG 9.SDR F3LA200800189Floor Panel · damagedDURING C4 S1 C CHECK INSPECTION NOTED FLOOR PANEL 232MF HAS HOLE IN FACE 1/4 INCH DIAMETER, 3 INCHES FROM INBOARD EDGE AND 3 FEET FROM FORWARD EDGE. MAINTENANCE REPAIRED DAMAGE IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 PAGE 205 FIGURE 201. UPON COMSDR F3LA200800181Floor Panel · corrodedDURING C4 S1 C CHECK INSPECTION REPORTED CORROSION ON MAIN CABIN R1 DOOR ENTRY FLOOR PANEL LOWER SURFACE AND AT VARIOUS FASTENER HOLES. MAINTENANCE REMOVED AND REPLACED R1 DOOR ENTRY PANEL 222FF. INSTALLATION WILL BE ACCOMPLISHED ON WORK CARD CP753-12.SDR F3LA200800176Floor Panel · puncturedDURING C4 S1 C CHECK INSPECTION NOTED PANEL 251RF HAS TWO PUNCTURES. MAINTENANCE CLEANED AREA OF DAMAGE, PREPPED AND APPLIED REPAIR IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE.SDR ASAA0892902Floorboard · damagedFLOORBOARD UNDER FWD LAV CREASED AND BROKEN AT AFT O/B CORNER. PREPARED DAMAGED AREA, APPLIED BMS 5 28 TYPE 19 POTTING COMPOUND 4 EA LAYERS EACH SIDE OF BMS 9 3 120 FIBERGLASS CLOTH BONDED IAW B737 900 SRM 53 00 50 REPAIR 6.SDR ASAA0892901Floorboard · brokenCABIN FLOORBOARD P/N 141A5810 183 STA 344 TO STA 380 LBL 56 O/B EDGE UPPER SURFACE BROKEN AT FWD END. PREPARED DAMAGED AREA REPAIR MATERIAL 4 LAYERS OF BMS 9 3 GLASS CLOTH. BONDED IAW B737 900 SRM 53 00 50 REPAIR 1.SDR ASAA0892900Floorboard · crushedCABIN FLOORBOARD P/N 141A5810 558 IS CRUSHED AROUND EDGES IN SEVERAL AREAS. PREPARED DAMAGED AREAS, FILLED DAMAGED AREAS WITH BMS 5 28 TYPE 19 4 EA LAYERS OF BMS 9 3 120 FIBERGLASS CLOTH IAW B737 900 53 00 50 REPAIR 4 PAR 3 (BOTH SIDES).SDR UPS08852052Floor Panel · crackedINSPECTION TYPE:C1 FLOOR PANEL F30A CRACKED AT END. STOP DRILLED CRACK, FABBED AND INSTALLED REPAIR DOUBLER IAW SRM 51-1- 8, 53-2-3-FIG 10, 51-3-2, 51-1-26.SDR TRAX200800536Floor Panel · crackedAAR - 2081 - CARGO COMPARTMENT FLOOR PANEL 282ERF CRACKED.
SDR F3LA200800163Floor Panel · delaminatedDURING C4 S1 C CHECK INSPECTION REPORTED FLOOR PANEL 261CG HAD DELAMINATION FROM ONE SCREW HOLE. MAINTENANCE REPAIRED FLOOR PANEL 261CG IN ACCORDANCE WITH SRM 53-08-00 STEP 8J, SRM 51-77-11 PARAGRAPH A11 AND SRM 51-44-21 PARAGRAPH 3A. UPON COMPLETION OF THE SDR ASAA0872842Tee Fitting · corrodedAFT CARGO BS 767+S FLOOR PANEL "T" SPLICE CORRODED COLLISION ON TEE ASSY IN AFT CARGO BS 767+5 BLENDED OUT BEYOND LIMITS. REPLACED WITH REPAIR PART IAW B737 700 SRM 53 60 53.SDR F3LA200800203Floor Panel · delaminatedDURING C4 S1 C CHECK INSPECTION NOTED FLOOR PANEL 222EF DELAMINATED AT EDGE. MAINTENANCE REPAIRED FLOOR PANEL 222EF IN ACCORDANCE WITH THE REQUIREMENTS OF EA A9-53R-30217 AND SRM 53-02-00. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE.SDR F3LA200800187Floor Panel · corrodedDURING C4 S1 C CHECK INSPECTION NOTED FLOOR PANEL 221PF LAV A HAS CORROSION ON BOLT HOLES. MAINTENANCE RECEIVED NEW FLOOR PANEL 221PK, OKAY TO INSTALL AND INSTALL WILL BE ACCOMPLISHED ON ROUTINE CARD CP753-12.SDR F3LA200800149Floor Panel · damagedDURING C4 S1 C CHECK, INSPECTION REPORTED DELAMINATION, AT THE EDGES, AND A LARGE GOUGE, IN FLOOR PANEL 221DF. MAINTENANCE REPAIRED THE FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 51-77-12. UPON COMPLETION OF THE REPAIR, THE PANEL WAS INSPECTSDR F3LA200800199Floor Panel · delaminatedDURING C4 S1 C CHECK INSPECTION NOTED FLOOR PANEL 261HG HAS DELAMINATION AROUND EDGES. MAINTENANCE REPAIRED FLOOR PANEL 261HG IN ACCORDANCE WITH THE REQUIREMENTS OF EA A9-53R-30226. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE.SDR F3LA200800156Floor Panel · corrodedDURING C4 S1 C CHECK, INSPECTION REPORTED CORROSION WAS FOUND ON THE UNDERSIDE OF FLOOR PANEL 222FF. MAINTENANCE REMOVED THE CORRODED PANEL. THE NEW PANEL WAS INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF TASK CARD CP 753-12. UPON COMPLETION OF THE INSTASDR F3LA200800155Floor Panel · corrodedDURING C4 S1 C CHECK, INSPECTION REPORTED CORROSION WAS FOUND ON THE UNDERSIDE OF FLOOR PANEL 221FF. MAINTENANCE REMOVED CORRODED PANEL. THE NEW PANEL WAS INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF TASK CARD CP 753-12. FOLLOWING INSTALLATION OF THE NESDR F3LA200800154Floor Panel · corrodedDURING C4 S1 C CHECK, INSPECTION REPORTED CORROSION WAS FOUND ON THREE INSERTS ON FLOOR PANEL 261PF. MAINTENANCE REMOVED THE CORRODED PANEL. THE NEW PANEL WAS INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF TASK CARD CP 753-36. FOLLOWING THE INSTALLATION OSDR F3LA200800146Floor Panel · damagedDURING C4 S1 C CHECK, INSPECTION REPORTED FLOOR PANEL 221EF HAD PUNCTURE DAMAGE. MAINTENANCE REPAIRED THE PUNCTURE IN THE PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-12-00. UPON COMPLETION OF THE REPAIR, THE PANEL WAS INSPECTED AND FOUND ACCEPTASDR F3LA200800165Strap · corrodedDURING C4 S1 C CHECK INSPECTION REPORTED SURFACE CORROSION ON AFT CARGO BAY FLOOR FRAME STRAP UPPER SURFACE AT FLOOR STRAP 2243 FRAME 56. MAINTENANCE REMOVED AND REPLACED FLOOR STRAP IN ACCORDANCE WITH SRM 51-72-11. UPON COMPLETION OF THE REPAIR IT WAS INSPE
Back to JASC 5321