JASC 5321

Service difficulty reports · 49,402

Reports filed under 5321 · Fuselage Floor Panel, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5321'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR UPS08852619Floorboard · corrodedINSPECTION TYPE-C1, MAIN CABIN, CORROSION ON FLOORBOARD, STA. 270 LBL31 REMOVED CORROSION, FABRICATED REPAIR DOUBLER, 2EA ANGLES AND INSTALLED IAW SRM 53-02-00 FIG 1F,53-02-03 FIG 10,53-02-03 FIG 10Jun 11, 2008 · N700UP · Doug DC871FSDR F3LA200800326Floor Panel · damagedREFERENCE NON ROUTINE C44993. DURING C4 S1 C-CHECK INSPECTION NOTED AFT PIT FLOOR PANEL 151VG HAS A 2 INCH SECTION MISSING ON TOP PIECE SHOWING COMPOSITE ALONG EDGE. MAINTENANCE CUT OUT DAMAGE, TRIMMED CORE, INSTALLED NEW CORE AND REPAIRED LOWER SKIN FLOOR PJun 10, 2008 · N915FR · Airbus A319111SDR F3LA200800321Floor Panel · corrodedREFERENCE NON ROUTINE C044794. DURING C4 S1 C-CHECK INSPECTION NOTED PANEL 221FF HAS LITE CORROSION ON BOTTOM SIDE. MAINTENANCE REMOVED AND REPLACED FLOOR PANEL 221FF IN ACCORDANCE WITH THE REQUIREMENTS OF WORK CARD SP753-12. UPON COMPLETION OF THE REPAIR, Jun 10, 2008 · N915FR · Airbus A319111SDR F3LA200800320Floor Panel · corrodedREFERENCE NON ROUTINE C044797. DURING C4 S1 C-CHECK INSPECTION NOTED PANEL 222FF HAS SEVERE CORROSION ON BOTTOM SIDE. MAINTENANCE REMOVED AND REPLACED FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF WORK CARD CP753-12. UPON COMPLETION OF THE REPAIR IT WAJun 10, 2008 · N915FR · Airbus A319111SDR F3LA200800319Floor Panel · corrodedREFERENCE NON ROUTINE C044808. DURING C4 S1 C-CHECK INSPECTION NOTED PANEL 222EF SPLICE PLATE CORRODED. MAINTENANCE REMOVED AND REPLACED FLOOR PANEL SPLICE PLATE IN ACCORDANCE WITH THE REQUIREMENTS OF WORK CARD CP753-12. UPON COMPLETION OF THE REPAIR, IT WAJun 10, 2008 · N915FR · Airbus A319111SDR F3LA200800315Floor Panel · puncturedDURING C-CHECK INSP NOTED CABIN FLOOR PANEL 251TF HAS A LARGE PUNCTURE HOLE. MAINT REPAIRED FLOOR PANEL 251TF IAW SRM 53-02-00. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE. (A)Jun 8, 2008 · N926FR · Airbus A319111SDR F3LA200800316Floorboard · damagedDURING C-CHECK INSP NOTED LAVATORY A FLOORBOARD 221PF HAS A HOLE AND IS DELAMINATED. MAINT REMOVED AND REPLACED FLOORPANEL 221PF IAW AMM 53-22-12. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE. (A)Jun 8, 2008 · N926FR · Airbus A319111SDR UPS08852457Floorboard · damagedINSPECTION TYPE:C2 FLOORBOARD F81 HAS ONE EACH SCREW HOLE BROKEN OUT. CUT OUT DAMAGE, FABBED AND INSTALLED REPAIR DOUBLER IAW SRM 53-2-3 FIG 10, 51-1-8, 51-1-21, 51-1-16.Jun 8, 2008 · N802UP · Doug DC873FSDR F3LA200800299Floor Panel · corrodedDURING C-CHECK INSP, NOTED AFT PIT FLOOR PANEL 151PE HAS SURFACE CORROSION AROUND ATTACHMENT HOLES AND EDGES. MAINT CLEANED CORROSION, FILLED COUNTER SINK AREA, PREPPED AND PRIMED PANEL 151PE IAW DRAWING 319-53-0001-11 AND AMM 25-00-00-870-001. UPON COMPLETIOJun 7, 2008 · N915FR · Airbus A319111SDR F3LA200800307Floor Panel · puncturedDURING C-CHECK INSP, NOTED THE FWD FLOOR PANEL 132DG HAS A PUNCTURE. MAINT CLEANED AND PREPPED DAMAGED, APPLIED FILLER, FABRICATED REPAIR PATCH AND INSTALLED REPAIR PATCH IAW SRM 53-02-00. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE. Jun 6, 2008 · N926FR · Airbus A319111SDR F3LA200800297Floor Panel · puncturedDURING C-CHECK INSP NOTED FLOOR PANEL 231XG HAS TWO SMALL PUNCTURE HOLES ON SURFACE. MAINT REPAIRED PUNCTURE DAMAGE TO FLOOR PANEL 231XG IAW SRM 53-02-00 STEP 8A. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE. (A)Jun 6, 2008 · N915FR · Airbus A319111SDR F3LA200800296Floor Panel · delaminatedREFERENCE NON ROUTINE C045066. DURING C4 S1 C CHECK INSPECTION NOTED FLOOR PANEL 221BF HAS DELAMINATION AROUND SCREW HOLES. MAINTENANCE REMOVED DELAMINATED AREA AND APPLIED MOISTURE BARRIER FOIL IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 PAGE 245 FIJun 6, 2008 · N915FR · Airbus A319111SDR F3LA200800295Floor Panel · damagedDURING C-CHECK INSP NOTED FLOOR PANEL 251JG HAS DAMAGE IN TWO PLACES ON UPPER SURFACE. MAINT REMOVED DAMAGE AND APPLIED MOISTURE BARRIER IAW SRM 53-02-00 AND SRM 53-02-00. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE. (A)Jun 5, 2008 · N915FR · Airbus A319111SDR ASAA0873041Floor Panel · brokenFLOORBOARD UNDER FWD LAV BROKEN ALONG OUTBOARD EDGE STA 297 TO STA 309 LBL 54 TO LBL 57. PREPARED DAMAGED AREA. FILLED DAMAGED AREA WITH BMS 5 28 TYPE 19 AND BONDED 4 EACH LAYERS OF BMS 9 3 FABRIC IAW B737 700 SRM 53 00 53 REPAIR 1.Jun 5, 2008 · N644AS · Boeing 737790SDR 08FDEA02033Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 KF REQUIRES FAB NEW. FABRICATED A NEW PANEL 187 KF; POTTED EDGES; COMPLETED CURE AND SANDED EDGE POTTING; INSTALLED INSERTS; FABRICATED THE TOP SHEET; LAYED UP TOP SHEET UNDER A VAC BAG AND COMPLETED CURE; BACK DRILLED AND COUNTER SUNMay 29, 2008 · N357FE · Doug MD1010FSDR 08FDEA02032Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 JF REQUIRES FAB NEW. FABRICATED NEW FLOOR PANEL 187 JF; POTTED EDGES; COMPLETED CURE AND SANDED EDGES; INSTALLED INSERTS; FABRICATED TOP SHEET; LAYED UP UNDER VAC BAG; COMPLETED CURE; BACK DRILLED AND COUNTERSUNK HOLES; APPLIED NON-SKMay 29, 2008 · N357FE · Doug MD1010FSDR 08FDEA02031Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 HF REQUIRES FAB NEW. FABRICATED NEW FLOOR PANEL 187 HF; POTTED EDGES; COMPLETED CURE AND SANDED EDGES; INSTALLED INSERTS; FABRICATED TOP SHEET; LAYED UP UNDER VAC BAG; COMPLETED CURE; BACK DRILLED AND COUNTERSUNK HOLES; APPLIED NON-SMay 29, 2008 · N357FE · Doug MD1010FSDR 08FDEA02030Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 GF REQUIRES FAB NEW. FABRICATED NEW FLOOR PANEL 187 GF; POTTED EDGES; COMPLETED CURE AND SANDED EDGE POTTING; INSTALLED INSERTS; FABRICATED TOP SHEET; LAYED UP UNDER A VAC BAG; COMPLETED CURE; BACK DRILLED AND COUNTERSUNK HOLES; APPLIMay 29, 2008 · N357FE · Doug MD1010FSDR 08FDEA02029Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 FF REQUIRES FAB NEW. FABRICATED NEW FLOOR PANEL 187 FF; POTTED EDGES; COMPLETED CURE AND SANDED EDGE POTTING; INSTALLED INSERTS; FABRICATED TOP SHEET; LAYED UP UNDER A VAC BAG; BACK DRILLED AND COUNTERSUNK HOLES; APPLIED NON-SKID ANDMay 29, 2008 · N357FE · Doug MD1010FSDR 08FDEA02028Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 EF REQUIRES FAB NEW. FABRICATED NEW FLOOR PANEL 187 EF; POTTED EDGES; COMPLETED CURE AND SANDED EDGES; INSTALLED INSERTS; FABRICATED TOP SHEET; LAYED UP UNDER VAC BAG; COMPLETED CURE; BACK DRILLED AND COUNTERSUNK HOLES; APPLIED NON-May 29, 2008 · N357FE · Doug MD1010FSDR 08FDEA02027Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 DF REQUIRES FAB NEW. FABRICATED NEW FLOOR PANEL 187 DF; POTTED EDGES; COMPLETED CURE AND SANDED THE EDGE POTTING; INSTALLED INSERTS; FABRICATED TOP SHEET; LAYED UP UNDER VAC BAG; COMPLETED CURE; BACK DRILLED AND COUNTERSUNK HOLES; May 29, 2008 · N357FE · Doug MD1010FSDR 08FDEA02026Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 CF REQUIRES FAB NEW. FABRICATED NEW FLOOR PANEL 187 CF; 187 CF; POTTED EDGES; COMPLETED CURE; INSTALLED INSERTS; FABRICATED TOP SHEET; LAYED UP UNDER VAC BAG; COMPLETED CURE; BACK DRILLED AND COUNTERSUNK HOLES; APPLIED NON-SKID AND PARMay 29, 2008 · N357FE · Doug MD1010FSDR 08FDEA02025Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 BF REQUIRES FAB NEW. FABRICATED NEW FLOOR PANEL 187 BF; POTTED EDGES; COMPLETED CURE AND SANDED EDGE POTTING; INSTALLED INSERTS; FABRICATED TOP SHEET; LAYED-UP TOP SHEET UNDER A VAC BAG; COMPLETED CURE; BACK DRILLED AND COUNTERSUNK May 29, 2008 · N357FE · Doug MD1010FSDR 08FDEA02024Floor Panel · delaminatedAFT PIT FLOOR PANEL 187 AF REQUIRES FAB NEW. FABRICATED A NEW FLOOR PANEL 187 AF; POTTED EDGES; COMPLETED CURE AND SANDED EDGES; INSTALLED INSERTS; FABBED TOP SHEET; LAYED UP UNDER A VAC BAG; COMPLETED CURE; BACK DRILLED AND COUNTERSUNK HOLES; APPLIED NOMay 29, 2008 · N357FE · Doug MD1010FSDR A6WA200840508Floor Panel · crackedCRACK FOUND ON FLOOR WEB FS 280 RBL 9. FLOOR WEB AT FS 280 RBL 0 REPAIRED IAW CRJ 200 REO 601R-53-11-171 REV D SCHEME B. (A)May 28, 2008 · N402AW · Cndair CL6002B19SDR A6WA200840507Pressure Panel · corrodedCORROSION ON PRESSURE FLOOR WEB FS 449 TO FS 529 LBL 45. CORROSION BLENDED IAW CRJ 200 SRM 51-21-06. (A)May 28, 2008 · N402AW · Cndair CL6002B19SDR UPS08152434Floor Panel · damagedINSPECTION TYPE:3C MCD FLOOR PANEL NR 251WJ HAS A LARGE FIELD REPAIR WITH A LARGE DENT. REMOVED FIELD REPAIR AND REPAIRED FLOOR PANEL NR 251WJ IAW A300-600 SRM 53-10-20 FIG 203.May 28, 2008 · N137UP · Airbus A300F4622RSDR UPS08852536Floorboard · crackedINSPECTION TYPE:C2 MAIN CABIN FLOORBOARD CRACKED, STA 45 RBL 47. FABBED AND INSTALLED REPAIR DOUBLER IAW, SRM. 53-2-00, 53-2-3, 510108, 51-1-26, 51-1-21.May 25, 2008 · N802UP · Doug DC873FSDR 08FDEA01930Floor Panel · corrodedC-2 PIT FLOOR PANELS NR 3 HAS CORROSION ALONG ONE SIDE EDGE FABRICATED NEW C-2 NR 3 PIT FLOOR PANEL REF DRAWING 65-67245 AND SRM 51-30-05 PG 13-21. THIS IS CLASSIFIED AS A MINOR REPAIR.May 21, 2008 · N220FE · Boeing 727233SDR 08FDEA01922Floor Panel · damagedTHERE IS A BROKEN FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 77 TO FRAME 80/82, LBL 45 TO LBL 63. MATERIAL ID IS A402H35039-003, PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED A NEW FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 77 TO FRAME 80/8May 20, 2008 · N815FD · Airbus A310324SDR 08FDEA01920Floor Panel · damagedTHERE IS A BROKEN FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 67 TO FRAME 69, RBL 54 TO RBL 72. MATERIAL ID IS A402H35039-003, PO604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED A NEW FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 67 TO FRAME 69 USINGMay 20, 2008 · N815FD · Airbus A310324SDR 08FDEA01919Floor Panel · damagedTHERE IS A BROKEN FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 66 TO FRAME 67, RBL 57 TO RBL 71. MATERIAL ID IS A402H35039-003, PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED A NEW FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 66TO 67 USING THE OMay 20, 2008 · N815FD · Airbus A310324SDR 08FDEA01918Floor Panel · damagedTHERE IS A BROKEN FLOOR FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 62 TO FRAME 65, RBL 57 TO RBL 74. MATERIAL ID IS A402H35039-003, PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED A NEW FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 62 TO FRAME 6May 20, 2008 · N815FD · Airbus A310SDR 08FDEA01916Floor Panel · damagedTHERE IS A BROKEN FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 54.2 TO FRAME 55/58, RBL-17 TO RBL-37. MATERIAL ID IS A402H35039-003, PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED A NEW FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 54.2 TO FRAME May 20, 2008 · N815FD · Airbus A310324SDR 08FDEA01914Floor Panel · damagedTHERE IS A BROKEN FLOOR PANEL FOR THE MAIN CARGO DECK AT FRAME 65 TO FRAME 66, LBL-57 TO LBL-71. MATERIAL ID IS A402H35039-003, PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED NEW FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 65 TO FRAME 66 USING TMay 20, 2008 · N815FD · Airbus A310324SDR 08FDEA01913Floor Panel · damagedTHERE IS A BROKEN FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 62 TO FRAME 65, LBL-57 TO LBL-72. MATERIAL ID IS A402H35039-003, PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED A NEW FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 62 TO FRAME 65 USINMay 20, 2008 · N815FD · Airbus A310324SDR 08FDEA01912Floor Panel · damagedTHERE IS A BROKEN FLOOR PANEL FOR THE MAIN CARGO DECK FROM FRAME 66 TO 67; LBL 57 TO LBL 71. MATERIAL ID IS A402H35039-003, PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED A NEW FLOOR PANEL FOR THE MAIN CABIN FROM FRAME 66 TO FRAME 67 USING THE OLD May 20, 2008 · N815FD · Airbus A310324SDR 08FDEA01911Floor Panel · crackedMAIN CABIN FLOOR PANEL AT FRAME 51, RBL 37 IS CRACKED. MATERIAL ID IS A402H35039-003, PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED NEW FLOORBOARD PANEL FOR THE MAIN CABIN FROM FRAME 51 TO FRAME 54 USING THE OLD PANEL AS A TEMPLATE IAW FEDEX DWG SRMay 20, 2008 · N815FD · Airbus A310324SDR 08FDEA01909Floor Panel · crackedMAIN CABIN FLOOR PANEL AT FRAME 48 IS CRACKED AT RBL 57. MATERIAL ID IS A402H35039-003, PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED NEW FLOORBOARD PANEL FOR THE MAIN CABIN AT FRAME 48 USING THE OLS PANEL AS A TEMPLATE IAW FEDEX DWG SRZ 25-005, REMay 20, 2008 · N815FD · Airbus A310324SDR 08FDEA01908Floor Panel · delaminatedMAIN WHEEL WELL CATWALK PANEL NR 148 BF IS DELAMINATED. MATERIAL ID IS A402H35039-003 PO 604814.1 IAW FEDEX DWG SRZ 25-005, REV F. FABRICATED A NEW FLOOR PANEL AT THE MAIN WHEEL WELL CATWALK PANEL NR 148 BF USING THE OLD PANEL AS A TEMPLATE IAW FEDEX DWG SRZMay 20, 2008 · N815FD · Airbus A310324SDR UPS08M52325Panel · corrodedINSPECTION TYPE:2C MAIN CARGO RCB PANEL NR 6 HAS CORROSION DAMAGE ON TOP FACE. LOCATED AND DRILLED REPLACEMENT PANEL AND INSTALLED ON EO MD11-5330-27218-B.May 16, 2008 · N255UP · Doug MD11FSDR F3LA200800254Floor Panel · damagedDURING C2 C CHECK INSPECTION NOTED AFT PIT FLOOR PANEL 151ZE DAMAGED. MAINTENANCE FABRICATED NEW FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 53-02-00 PAGE BLOCK 201 8.G AND 8.H. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE.May 11, 2008 · N938FR · Airbus A319111SDR UPS08M52324Floor Panel · corrodedINSPECTION TYPE:2C MAIN CARGO, RCB NR 10 HAS CORROSION DAMAGE 2 PLACES ON TOP FACE. REPLACED PANEL AND INSTALLED ON E0 MD11-5330-27218.May 9, 2008 · N255UP · Doug MD11FSDR UPS08M52333Panel · corrodedINSPECTION TYPE:2C MAIN CARGO RCB NR 7 HAS CORROSION DAMAGE ON TOP FACE. LOCATED AND DRILLED REPLACEMENT PANEL IAW MD-11 SRM 51-31-01 AND INSTALLED ON EO MD11-5330-27218-B.May 7, 2008 · N255UP · Doug MD11FSDR UPS08M52331Panel · corrodedINSPECTION TYPE:2C MAIN CARGO RCB PNL NR 4 HAS CORROSION DAMAGE ON TOP FACE. LOCATED AND DRILLED REPLACEMENT PANEL IAW MD-11 SRM 51-31-01 AND INSTALLED ON EO MD11-5330-27218-B.May 7, 2008 · N255UP · Doug MD11FSDR IXXA08SMN185SFloor Panel · corrodedDURING ROUTINE C CHECK INSPECTION, FOUND MAIN CARGO COMPARTMENT FLOOR PANEL WITH CORROSION AT STATION 1425.000 RIGHT BOTTOM LINE 50. REMOVED FASTENERS AS NEEDED TO PERFORM REPAIR. REMOVED CORROSION. FOUND OUT OF LIMITS. REMOVED DAMAGED AREA. FABRICATED DOMay 7, 2008 · N602AL · Doug DC873FSDR UPS08M52335Panel · corrodedINSPECTION TYPE:2C MAIN CARGO RCB PNL NR 2 HAS CORROSION DAMAGE 3 PLACES ON TOP FACE. LOCATED AND DRILLED REPLACEMENT PANEL IAW MD-11 SRM 51-31-01 AND INSTALLED ON E0 MD11-5330-27218-B.May 6, 2008 · N255UP · Doug MD11FSDR UPS08M52332Panel · corrodedINSPECTION TYPE:2C MAIN CARGO RCB PNL NR 12 HAS CORROSION ON TOP FACE. LOCATED AND DRILLED REPLACEMENT PANEL IAW MD-11 SRM 51-31-01 AND INSTALLED ON EO MD11-5330-27218-B.May 5, 2008 · N255UP · Doug MD11FSDR UPS08M52329Panel · corrodedINSPECTION TYPE:2C MAIN CARGO RCB PNL NR 5 HAS CORROSION 3 PLACES ON TOP FACE. LOCATED AND DRILLED REPLACEMENT PANEL IAW MD-11 SRM 51-31-01 AND INSTALLED ON EO MD11-5330-27218-B.May 4, 2008 · N255UP · Doug MD11FSDR UPS08M52328Panel · corrodedINSPECTION TYPE:2C MAIN CARGO RCB PNL NR 13 HAS CORROSION DAMAGE ON 2 PLACES, TOP FACE. LOCATED AND DRILLED NEW PANEL IAW MD-11 SRM 51-31-01 AND INSTALLED ON EO MD11-5330-27218-B.May 4, 2008 · N255UP · Doug MD11F
Back to JASC 5321