JASC 5321
Service difficulty reports · 49,402
Reports filed under 5321 · Fuselage Floor Panel, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5321' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5321' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR F3LA200800148Floor Panel · corrodedDURING C4 S1 C CHECK, INSPECTION REPORTED CORROSION AND DAMAGE WAS FOUND ON FLOOR PANEL 261PF, UNDER THE RIGHT CORNER OF THE AFT GALLEY. MAINTENANCE REPAIRED THE CORROSION AND DAMAGE IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-12-00. UPON COMPLETION OSDR F3LA200800147Floor Panel · damagedDURING C4 S1 C CHECK, INSPECTION REPORTED FLOOR PANEL 222EF HAD PUNCTURE DAMAGE. MAINTENANCE REPAIRED THE PUNCTURE IN THE FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-12-00. UPON COMPLETION OF THE REPAIR, THE PANEL WAS INSPECTED AND FOUND ASDR USAA920080823Floor Panel · crackedCLT - MAJOR REPAIR - Q6 CHECK - A 1" CRACK ON COCKPIT FLOOR AT BS 257, LBL 3. INSTALLED DOUBLER REPAIR IAW SRM 53-10-51.SDR 08FDEA01302Floor Skin · corrodedMAIN DECK FLOOR STRUCTURE, CORROSION ON UPPER SURFACE OF FLOOR WEBBING AT APPROX LBL 88 BETWEEN FRAMES 32 AND 33. BLENDED CORROSION REF SRM 51-74-10 PAR 5. ORIGINAL MATERIAL THICKNESS OF .094 AND .065 AFTER BLEND OUT FOR TOTAL MATERIAL LOSS OF .029 FOUND TO BSDR UPS08851950Floor Panel · corrodedINSPECTION TYPE:C2 CORROSION ON FLOOR PANEL AT STA 580 AND RBL 24. REPAIRED CABIN FLOOR PANEL AT STA 580 AND RBL 24 IAW SRM 53-02-03 FIG 10.SDR 08FDEA01188Floor Panel · corrodedMAIN DECK FLOOR STRUCTURE HAS CORROSION ON THE UPPER SURFACE OF THE FLOOR WEBBING AT APPROX LBL 87 BETWEEN FRAMES 34 AND 35. BLENDED OUT THE CORROSION REF A310-200 SRM 51-74-10; PARA 5. ORIGINAL THICKNESS 0.094 AND 0.087 REMAINING. MATERIAL REMOVED 0.007. SDR 08FDEA01186Floor Panel · corrodedMAIN DECK FLOOR STRUCTURE HAS CORROSION ON THE UPPER SURFACE OF THE FLOOR WEBBING AT FRAME 35; APPROX LBL 87. BLENDED OUT CORROSION REF A310-200 SRM 51-74-10; PARA 5. ORIGINAL MATERIAL THICKNESS OF 0.094 AND 0.065 AFTER BLEND OUT FOR A TOTAL MATERIAL LOSS OFSDR ASAA0892837Floorboard · crackedCABIN AFT FLOORBOARD AT STA 947 TO STA 986 LBL 17 TO LBL 43 CORNER CRACKED. PREPARED DAMAGED AREA APPLIED POTTING COMPOUND BMS 5 28 TYPE 19 TO DAMAGED CORE: 8 LAYERS (4 EACH SIDE) OF BMS 9 3 1581, REPAIR PLY BONDED IAW B737 900 SRM 53 00 50 PG 201-203.SDR ASAA0892836Floorboard · delaminatedCABIN AFT FLOORBOARD STA 907 TO STA 946 LBL 17 TO LBL 50 IS DELAMINATED AT INSERTS. PREPARED DAMAGED AREA APPLIED POTTING COMPOUND BMS 5 28 TYPE 19 AND 4 LAYERS OF BMS 9 3 1581, FABRIC REPAIR PLY BONDED IAW B737 900 SRM 53 00 50 REP 1 PGS 201 202.SDR ASAA0892835Floorboard · delaminatedAFT CABIN FLOORBOARD STA 887 TO STA 907 RBL 47 TO RBL 67 IS DELAMINATED. PREPARED DAMAGED AREA APPLIED POTTING COMPOUND BMS 5 28 TYPE 19 AND 4 LAYERS BMS 9 3, FABRIC REPAIR PLY BONDED AREA IAW B737 900 SRM 53 00 50 REP 6 PGS 201 203.SDR ASAA0892834Floorboard · delaminatedCABIN FLOORBOARD STA 887 TO STA 907 DELAMINATED LBL 47 TO LBL 63. PREPARED DAMAGED AREA APPLIED POTTING COMPOUND BMS 5 28 TYPE 19 AND 4 LAYERS BMS 9 3, FABRIC REPAIR PLY BONDED DAMAGED AREA IAW B737 900 SRM 53 00 50 REP 6 PG 201 203.SDR 08FDEA01100Floor Panel · delaminatedMAIN CABIN FLOORBOARD AT RBL 48 TO 76; BS 615 TO 675 IS SOFT AND SPONGY. EVALUATED FLOOR PANEL INSTALLED INSERTS. FOUND PANEL TO BE SOLID PER FEDEX SRZ 25-005 REV F. SDR SUBMITTED IN ERROR- ADMINISTRATOR.SDR 08FDEA01099Floor Panel · delaminatedMAIN CABIN FLOORBOARD AT RBL 48 TO 76; BS 615 TO 675 IS SOFT AND SPONGY. EVALUATED FLOOR PANEL INSTALLED INSERTS. FOUND PANEL TO BE SOLID PER FEDEX SRZ 25-005 REV F. SDR SUBMITTED IN ERROR- ADMINISTRATOR.SDR 08FDEA01098Floor Panel · delaminatedMAIN CABIN FLOORBOARD AT RBL 9 TO 28; BS 615 TO 735 IS SOFT AND SPONGY. EVALUATED THE FLOOR PANEL AND FOUND IT TO BE SOLID IAW FEDEX SRZ 25-005; REV F. SDR SUMITTED IN ERROR- ADMINISTRATOR.SDR 08FDEA01085Floor Panel · delaminatedMAIN CABIN FLOORBOARD AT LBL 76 TO 108; BS 506 TO 590; PREVIOUS REPAIR AT THE FWD END IS DISBONDED. REPAIRED MAIN CABIN FLOORBOARD WITH FILLER AT LBL 76 TO 108; BS 506 TO 590 AS REQUIRED IAW FEDEX DC/MD-10 DWG SRZ 25-005; REV F. REPAIRED THE DELAMINATION OF SDR 08FDEA01083Floor Panel · damagedMAIN CABIN FLOORBOARD AT LBL 48 TO 76 FROM BS 506 TO 590 HAS A PUNCTURED UPPER SKIN. REPAIRED MAIN CABIN FLOOR PANEL AT LBL 48 TO 76; BS 506 TO 590 WITH FILLER AS REQUIRED IAW FEDEX DC/MD-10 DWG SRZ 25-005, REV F.SDR 08FDEA01082Floor Panel · damagedMAIN CABIN FLOOR PANEL AT STA 630; LBL 95 IS PUNCTURED. REMOVED LEFT OVER DAMAGED MATERIAL; CLEANED THE AREA AND FILLED IAW FEDEX SRZ 25-005 REV F.SDR 08FDEA01081Floorboard · crackedMAIN CABIN FLOOR PANEL AT STA 755; LBL 5 IS CRACKED. REPAIRED CRACK IAW FEDEX SRZ 25-005 REV F.SDR F3LA200800131Floor Panel · damagedDURING C2 C CHECK, INSPECTION REPORTED A HOLE WAS PUNCTURED INTO THE UPPER SKIN OF AFT CARGO PIT FLOOR PANEL 151VG, NEAR THE FORWARD EDGE, IN THE CENTER. MAINTENANCE REMOVED AND REPLACED THE FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF AMM 53-42-14 PB 4SDR 08FDEA00990Floor Panel · delaminatedAFT PIT FLOOR PANEL NR 187 JF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL NR 187 JF. POTTED EDGES; COMPLETED CURE; SANDED EDGE POTTING AND INSTALLED INSERTS. FABRICATED TOP SHEET; LAYED UP TOP SHEET UNDER A VAC BAG; COMPLETED CURE; COUNSDR 08FDEA00989Floor Panel · delaminatedAFT PIT FLOOR PANEL NR 187 FF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL NR 187 FF. LOCATED HOLES; POTTED EDGES; COMPLETED CURE; SANDED EDGE POTTING AND INSTALLED INSERTS. FABRICATED TOP SHEET; LAYED UP UNDER A VAC BAG; COMPLETED CURE; SDR 08FDEA00988Floor Panel · delaminatedAFT PIT FLOOR PANEL NR 187 CF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL NR 187 CF. LOCATED HOLES; POTTED EDGES; COMPLETED CURE; SANDED EDGE POTTING AND INSTALLED INSERTS. FABRICATED TOP SHEET; LAYED UP UNDER A VAC BAG; COMPLETED CURSDR 08FDEA00987Floor Panel · delaminatedAFT PIT FLOOR PANEL NR 187 HF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL NR 187 HF. LOCATED HOLES; POTTED EDGES; COMPLETED CURE; SANDED EDGES AND INSTALLED INSERTS. FABRICATED TOP SHEET; LAYED UP UNDER A VAC BAG; COMPLETED CURE; COUNTESDR 08FDEA00986Floor Panel · delaminatedAFT PIT FLOOR PANEL NR 187 EF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL 3 187 EF. LOCATED HOLES; POTTED EDGES; COMPLETED CURE; SANDED EDGES AND INSTALLED INSERTS. FABRICATED TOP SHEET AND LAYED UP UNDER A VAC BAG; COMPLETED CURE; COSDR 08FDEA00985Floor Panel · delaminatedAFT PIT FLOOR PANEL NR 187 AF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL NR 187 AF; LOCATED HOLES; POTTED EDGES; COMPLETED CURE; SANDED EDGES AND INSTALLED INSERTS. FABRICATED TOP SHEET AND LAYED UP UNDER A VAC BAG; COMPLETED CURE; COUNTSDR 08FDEA00984Floor Panel · delaminatedAFT PIT FLOOR PANEL NR 187 BF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL 187 BF; POTTED EDGES; COMPLETED CURE AND SANDED EDGE POTTING. INSTALLED INSERTS; FABRICATED TOP SHEET LAYED UP UNDER VAC BAG; COMPLETED CURE; COUNTER SUNK HOLES ANSDR 08FDEA00983Floor Panel · delaminatedAFT PIT FLOOR PANEL NR 187 GF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL 187 GF; POTTED EDGES; COMPLETED CURE AND SANDED EDGE POTTING. INSTALLED INSERTS; FABRICATED TOP SHEET; LAYED UP UNDER VAC BAG COMPLETED CURE; COUNTER SUNK HOLES AND SDR 08FDEA00982Floor Panel · failedAFT PIT FLOOR PANEL NR 187 DF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL 187 DF; POTTED EDGES; COMPLETED CURE AND SANDED EDGE POTTING. INSTALLED INSERTS AND FABRICATED TOP SHEET. LAYED UP TOP SHEET UNDER THE VAC BAG; COMPLETED CURE; COUSDR 08FDEA00981Floor Panel · damagedAFT PIT FLOOR PANEL NR 187 KF REQUIRES FABRICATION PER SRZ 25-011. FABRICATED NEW FLOOR PANEL 187 KF; POTTED EDGES; COMPLETED CURE AND SANDED EDGE POTTING. INSTALLED INSERTS AND FABRICATED TOP SHEET. LAY-UP PLACED UNDER VAC BAG; COMPLETED CURE; COUNTERED SISDR 08FDEA00992Floor Panel · crackedCENTER PIT FLOOR PANEL 183 KF HAS CRACKED SKIN AND THE EDGES ARE DELAMINATED. FABRICATED A NEW CTR PIT FLOOR BOARD IAW DWG SRZ 25-005; REV E. PART MARKED NEW PANEL IAW GMM 7-0-1000.SDR AALA200800670Floor Panel · corrodedTUL - FOUND CORROSION ON CABIN SUB FLOOR, AREA OF DISCREPANCY IS 18 BY 18 INCHES AT STATION 218. INSTALLED REPAIR DOUBLER PER AARD 53 20 00 16.SDR F3LA200800125Floor Panel · puncturedDURING C4/S1 C CHECK, INSPECTION REPORTED A PUNCTURE WAS FOUND IN FLOOR PANEL 241EF. MAINTENANCE REPAIRED THE DAMAGED PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00, PAGE 205, A319 SRM 52-02-00, PAGE 206, PARAGRAPH 201 AND A319 SRM 53-02-00. SDR 08FDEA00888Floor Panel · damagedFOUND FLOOR PANEL P/N 35039003 HAS EDGE DAMAGE. REPAIRED FLOOR PANEL 132 YF I.A.W. FEDEX DWG. SRZ-25-00 REV. E.SDR 08FDEA00887Floor Panel · damagedAFT CARGO PIT FLOOR PANEL 151FF HAS CORNER DAMAGE. FABRICATED NEW FLOOR PANEL. POTTED EDGES. COMPLETED CURE & SANDED EDGE POTTING. INSTALLED INSERTS & APPLIED NON-SKID IAW DWG SRZ 25-005; REV F.SDR 08FDEA00886Floor Panel · damagedFLOOR PANEL 152YF HAS EDGE DAMAGE AND IS DENTED. FABRICATED NEW FLOOR PANEL. POTTED EDGES, COMPLETED CURE & SANDED EDGE POTTING. INSTALLED INSERTS & APPLIED NON-SKID IAW DWG SRZ 25-005; REV F.SDR 08FDEA00885Floor Panel · delaminatedFWD CARGO PIT FLOOR PANEL 132GF HAS EDGE DAMAGE AND IS DELAMINATED. FABRICATED NEW FLOOR PANEL. LOCATED HOLES, POTTED EDGES, CURED EDGE POTTING. INSTALLED INSERTS & APPLIED NON-SKID IAW DWG SRZ 25-005; REV F.SDR 08FDEA00884Floor Panel · delaminatedFWD CARGO PIT FLOOR PANEL 131RF IS DELAMINATED IN 5 AREAS. FABBED NEW FLOOR PANEL. LOCATED HOLES, POTTED EDGES, CURED EDGE POTTING; INSTALLED INSERTS & APPLIED NON-SKID IAW DWG SRZ 25-005; REV F.SDR 08FDEA00848Floor Panel · peelingMLG WHEEL WELL FLOOR PANEL 148BF UPPER LAYER IS PEELING. FABRICATED NEW FLOOR PANEL. LOCATED HOLES, POTTED EDGES. CURED EDGE POTTING. INSTALLED INSERTS AND APPLIED NON-SKID IAW SRZ 25-005; REV F.SDR 08FDEA00847Floor Panel · damagedFLOOR PANEL 147BF UPPER LAYERS ARE DETERIORATED IN NUMEROUS PLACES. FABRICATED NEW FLOOR PANEL 147 BF; POTTED EDGES; COMPLETED CURE & SANDED EDGE POTTING. INSTALLED INSERTS & APPLIED NON-SKID IAW SRZ 25-005; REV F.SDR QXEA200800274Floorboard · corrodedPDX - C5 - CORROSION ON FLOORBOARD FLANGE UPPER SURFACE AT STATION 599.5 OUTBOARD OF STRINGER 28R TO END OF FLANGE. REMOVED NUT PLATE, BLENDED OUT CORROSION IAW DASH 8 200 CPM CHAPTER 4, BLENDED AREA WITHIN LIMITS IAW DASH 8 200 SRM 51-20-11. ALODINED AND PRSDR UPS08851928Floor Panel · damagedINSPECTION TYPE:C3 ALL FASTENER HOLES ON MAIN CABIN FLOOR PANEL F23 BARE WORN, KNIFEDGED, CRACKED, BROKEN OUT, OR CORRODED. PANEL SKIN IS CORRODED. REPLACED 1 EACH HAT CHANNEL, REPLACED SKIN ON PANEL IAW SRM 51-1-21, 51-1-8, 51-3-2.SDR UPS08851926Floor Panel · crackedINSPECTION TYPE:C3 COURIER AREA FLOOR PNL F23 IS CRACKED, CORRODED AND DELAMINATED IN SEVERAL AREAS. FABBED FLOOR PANEL.SDR F3LA200800095Floor Panel · corrodedDURING C4/S1 C CHECK, INSPECTION REPORTED CORROSION WAS FOUND ON THE L0WER SURFACE OF FLOOR PANEL 221FF. MAINTENANCE REMOVED AND REPLACED THE FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF AMM 53-12-12-000-001. FOLLOWING COMPLETION OF THE INSTALLATION OFSDR UPS08851867Floor Panel · corrodedINSPECTION TYPE:C3 5 SPOTS OF CORROSION ON TOP OF LAV AREA FLOOR PANEL, STA 62-75 RBL 30-37. REMOVED CORROSION WENT OUT OF LIMITS. FABBED AND INSTALLED REPAIR DOUBLER IAW SRM 53-2-3 FIG 10, 51-1-8.SDR F3LA200800116Floor Panel · corrodedDURING C4/S1 C CHECK, INSPECTION REPORTED CORROSION WAS FOUND ON THE LOWER SURFACE OF FLOOR PANEL 222FF. MAINTENANCE REMOVED AND REPLACED THE FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF AMM 53-12-12-400-001. FOLLOWING COMPLETION OF THE REPLACEMENT, THSDR F3LA200800108Floor Panel · damagedDURING C4/S1 C CHECK, INSPECTION REPORTED DELAMINATION WAS FOUND ON THE TOP SURFACE OF FLOOR PANEL 231NF. MAINTENANCE REPAIRED THE DELAMINATED AREA IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 212. FOLLOWING COMPLETION OF THE REPAIR, THE SDR F3LA200800092Floor Panel · damagedDURING C4/S1 C CHECK, INSPECTION REPORTED FLOOR PANEL 262FF WAS DAMAGED AT ITS AFT, INBOARD CORNER. MAINTENANCE REMOVED AND REPLACED THE FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF AMM 53-42-12-991-003B. FOLLOWING INSTALLATION OF THE NEW FLOOR PANEL, SDR UPS08851921Floor Panel · crackedINSPECTION TYPE:C3 COCKPIT FLOOR PANEL 678 CRACKED AT NOTED LOCATIONS, LOOSE CHAFE STRIP DISBONDED BOOK SHELF BRACKET. STOP DRILLED CRACK, FABBED AND INSTALLED REPAIR DOUBLER IAW SRM 51-1-8, 51-1-21, 53-2-00 FIG 1B, 51-3-1.SDR F3LA200800114Floor Panel · damagedDURING C4/S1 C CHECK, INSPECTION REPORTING FINDING DELAMINATION ON THE EDGE OF FLOOR PANEL 222EF. MAINTENANCE REPAIRED THE DAMAGED PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00 PB 201, PARAGRAPH 8.J, FIGURE 212. FOLLOWING COMPLETION OF THE RSDR F3LA200800112Floor Panel · damagedDURING C4/S1 C CHECK, INSPECTION REPORTED DELAMINATION WAS FOUND ON THE EDGE OF FLOOR PANEL 251WF. MAINTENANCE REPAIRED THE FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 212. FOLLOWING COMPLETON OF THE REPAIR, THE FLOOR PANEL W
Back to JASC 5321