JASC 5511

Service difficulty reports · 6,462

Reports filed under 5511 · Horizontal Stabilizer, Spar/Rib, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5511'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR SWAA2017100216818Rib · crackedLT HORIZONTAL STABILIZER LEADING EDGE CRACKED AT STA 105.26. R&R RIB ASSEMBLY PER DWG & SRM.Sep 25, 2017 · N788SA · Boeing 7377H4SDR SWAA2017100216817Rib · crackedLT HORIZONTAL STABILIZER LEADING EDGE RIB CRACKED AT STA 95.96. R&R RIB PER SRM & AMM.Sep 25, 2017 · N788SA · Boeing 7377H4SDR SWAA2017100216815Rib · crackedRT HORIZONTAL STABILIZER LEADING EDGE RIB CRACKED AT STA 105.26. R&R LEADING EDGE ASSEMBLY PER AMM & EA.Sep 25, 2017 · N788SA · Boeing 7377H4SDR SWAA2017101016961Rib · crackedLT HORIZONTAL STABILIZER RIB ASSEMBLY CRACKED AT STAB STA 120.30, BETWEEN 2ND AND 4TH VERTICAL STIFFENERS. REPAIRED RIB ASSEMBLY PER SRM.Sep 23, 2017 · N557WN · Boeing 737790SDR SWAA2017100516913Rib · crackedLT HORIZONTAL STABILIZER RIB ASSEMBLY CRACKED AT STAB STA. 92.70, 2ND VERTICAL STIFFENER. REPAIRED RIB ASSEMBLY PER SRM.Sep 23, 2017 · N557WN · Boeing 737790SDR AALA20170922009Rib · crackedCRACK INDICATIONS ON THE RIGHT HORIZONTAL STABILIZER RIB LOWER RADIUS AT HSS 92.7. REMOVED AND REPLACED THE RIB IAW SRM 55-10-09, SRM 51-40-02, AND DRAWING 182A5301.Sep 22, 2017 · N929AN · Boeing 737823SDR AALA20170922001Rib · crackedCRACK INDICATIONS ON LEFT HORIZONTAL STABILIZER RIB INBOARD RADIUS AT HSS 92.7. REMOVED AND REPLACED INSPAR RIB IAW SRM 55-10-09 AND SRM 51-40-02.Sep 22, 2017 · N929AN · Boeing 737823SDR AALA201709229025Rib · crackedAIRCRAFT IN BASE MAINTENANCE. CRACK ON LEFT HAND HORIZONTAL STABILIZER LEADING EDGE MOST INBOARD RIB. REPLACED RIB PER DRAWING 170-62333-001.Sep 19, 2017 · N955UW · Emb ERJ190100IGWSDR SWAA2017101717136Rib · crackedRIGHT HORIZONTAL STABILIZER FIRST BETWEEN FORWARD VERTICAL STIFFENER CRACKED AT HSS 92.70. REPAIRED THE RIB IAW SRM.Sep 17, 2017 · N7862A · Boeing 73779PSDR SWAA2017101717101Rib · crackedRIGHT HORIZONTAL STABILIZER RIB CRACKED AT HSS 92.70, SECOND FORWARD VERTICAL STIFFENER. REPAIRED THE RIB IAW ER AND EA.Sep 17, 2017 · N7862A · Boeing 73779PSDR SWAA2017110617590Rib · crackedRIGHT HORIZONTAL STABILIZER REMOVABLE LEADING EDGE RIB CRACKED. R & R THE RIB IAW SRM & DWG.Sep 9, 2017 · N7862A · Boeing 73779PSDR SWAA2017102617407Rib · crackedLT HORIZONTAL STABILIZER REMOVABLE LEADING EDGE 4TH RIB FROM INBOARD END CRACKED. REPAIRED RIB IAW SRM & DWG.Sep 9, 2017 · N7862A · Boeing 7377*SDR SWAA2017091416333Rib · crackedRIGHT HORIZONTAL STABILIZER LEADING EDGE RIB CRACKED AT HSS 95.96. R & R THE RIB IAW SRM AND DWG.Sep 2, 2017 · N225WN · Boeing 7377H4SDR SWAA2017092716661Rib · crackedLT HORIZONTAL STABILIZER RIB CRACKED AT STA 129.5, 3RD STIFFENER AFT. REPAIRED RIB IAW SRM, ER, AND EA.Sep 1, 2017 · N710SW · Boeing 7377H4SDR SWAA2017091216227Rib · crackedLEFT HORIZONTAL STABILIZER RIB CRACKED AT HSS 92.70, 38 INCHES AFT OF THE FRONT SPAR. REPAIRED THE RIB IAW SRM.Sep 1, 2017 · N225WN · Boeing 7377H4SDR SWAA2017091216225Rib · crackedLEFT HORIZONTAL STABILIZER RIB CRACKED AT HSS 92.70, 26 INCHES AFT OF FRONT SPAR. REPAIRED THE RIB IAW SRM.Sep 1, 2017 · N225WN · Boeing 7377H4SDR SWAA2017091216223Rib · crackedLEFT HORIZONTAL STABILIZER RIB CRACKED AT HSS 92.70, 20 INCHES AFT OF FRONT SPAR. REPAIRED RIB IAW SRM.Sep 1, 2017 · N225WN · Boeing 7377H4SDR SWAA2017091216222Rib · crackedLEFT HORIZONTAL STABILIZER RIB CRACKED AT HSS 92.70, 10 INCHES AFT OF FRONT SPAR. REPAIRED THE RIB IAW SRM.Sep 1, 2017 · N225WN · Boeing 7377H4SDR SWAA2017090716178Rib · crackedRIGHT HORIZONTAL STABILIZER LEADING EDGE 341B RIB CRACKED AT HSS 151.75 LOWER AFT END. R & R THE RIB IAW SRM & DWG.Aug 30, 2017 · N710SW · Boeing 7377H4SDR SWAA2017090716177Rib · crackedLEFT HORIZONTAL STABILIZER LEADING EDGE 331B RIB CRACKED AT HSS 114.0, AT LOWER AFT END. REPAIRED THE RIB IAW SRM & DWG.Aug 30, 2017 · N710SW · Boeing 7377H4SDR SWAA2017083116050Rib · crackedRT HORIZONTAL STABILIZER LEADING EDGE RIB CRACKED AT STA 106. R&R RIB IAW DWG.Aug 27, 2017 · N449WN · Boeing 7377H4SDR SWAA2017090616140Rib · crackedRT HORIZONTAL STABILIZER LEADING EDGE 5TH RIB FROM INBOARD EDGE CRACKED. R&R RIB IAW DWG & AMM.Aug 25, 2017 · N756SA · Boeing 7377H4SDR SWAA2017090616139Rib · crackedRT HORIZONTAL STABILIZER LEADING EDGE 3RD RIB FROM INBOARD EDGE CRACKED. R&R RIB IAW DWG & AMM.Aug 25, 2017 · N756SA · Boeing 7377H4SDR SWAA2017092516594Rib · crackedR/H HORIZONTAL STABILIZER INSPAR RIB CRACKED AT STAB STA 92.70, LOWER END OF THE FIRST VERTICAL STIFFENER FROM THE FRONT. REPAIRED RIB IAW SRM.Aug 24, 2017 · N7861J · Boeing 7377*SDR SWAA2017082815921Rib · crackedLEFT HORIZONTAL STABILIZER LEADING EDGE RIB AT HSS 95.96 FOUND CRACKED. R & R THE RIB IAW DWG AND SRM.Aug 22, 2017 · N746SW · Boeing 7377H4SDR SWAA2017082815920Rib · crackedLEFT HORIZONTAL STABILIZER LEADING EDGE RIB CRACKED AT HSS 69.93. R & R THE RIB IAW DWG AND SRM.Aug 22, 2017 · N746SW · Boeing 7377H4SDR SWAA2017082815919Rib · crackedRIGHT HORIZONTAL STABILIZER LEADING EDGE RIB CRACKED AT HSS 86.66. R & R THE RIB IAW SRM AND DWG.Aug 22, 2017 · N746SW · Boeing 7377H4SDR SWAA2017082815918Rib · crackedRT HORIZONTAL STABILIZER LEADING EDGE RIB CRACKED AT HSS 113. R & R THE RIB IAW SRM AND DWG.Aug 22, 2017 · N746SW · Boeing 7377H4SDR SWAA2017082815917Rib · crackedRT HORIZONTAL STABILIZER LEADING EDGE RIB CRACKED AT HSS 151.75. R & R THE RIB IAW SRM AND DWG.Aug 22, 2017 · N746SW · Boeing 7377H4SDR SWAA2017091816398Rib · crackedRT HORIZONTAL STABILIZER IN SPAR RIB CRACKED AT 92.70, LOWER FLANGE JUST AFT OF THE FIRST VERTICAL STIFFENER. REPAIRED RIB IAW EA.Aug 21, 2017 · N708SW · Boeing 7377H4SDR SWAA2017091216224Rib · crackedLEFT HORIZONTAL STABILIZER REMOVABLE LEADING EDGE 4TH RIB FROM INBOARD CRACKED ON THE LOWER CORNER. R & R RIB IAW SRM & DWG.Aug 18, 2017 · N708SW · Boeing 7377H4SDR SWAA2017091216259Rib · crackedRIGHT HORIZONTAL STABILIZER RIB CRACKED AT HSS 92.7, FIRST AND SECOND STIFFENER FROM FRONT SPAR, ONE INCH ABOVE LOWER SKIN. REPAIRED THE RIB IAW SRM.Aug 17, 2017 · N708SW · Boeing 7377H4SDR SWAA2017090616164Rib · crackedRT HORIZONTAL STABILIZER RIB CRACKED AT STAB STA 120.30, 3RD VERTICAL STIFFENER FROM FORWARD AT LOWER RADIUS. REPAIRED RIB ASSEMBLY PER SRM.Aug 17, 2017 · N228WN · Boeing 7377H4SDR SWAA2017090616163Rib · crackedRT HORIZONTAL STABILIZER RIB CRACKED AT STAB STA 120.30, 4TH VERTICAL STIFFENER FROM FORWARD AT LOWER RADIUS. REPAIRED RIB ASSEMBLY PER SRM.Aug 17, 2017 · N228WN · Boeing 7377H4SDR SWAA2017090616078Rib · crackedRT HORIZONTAL STABILIZER RIB CRACKED AT STAB STA 120.30, 2ND VERTICAL STIFFENER FROM FORWARD AT LOWER RADIUS. REPAIRED RIB ASSEMBLY PER SRM.Aug 17, 2017 · N228WN · Boeing 7377H4SDR FDEA201708162240Spar Cap · crackedRIGHT HORIZONTAL STAB UPPER, OUTER REAR SPAR CAP HAS A .75 IN CRACK FWD OF THE AFT BARREL NUT HOLE IN THE PREVIOUS BLEND OUT AREA. REPAIRED THE SPAR CAP IAW EA 8-5510-T0334969.Aug 16, 2017 · N307FE · Doug MD1030FSDR SWAA2022013019686Rib · crackedRT HORIZONTAL STAB IN SPAR RIB AT 92.70 IS CRACKED ON THE LOWER END OF THE 4TH VERTICAL STIFFENER FROM THE FRONT. / REPAIRED RT. HORIZ. STAB IN-SPAR RIB AT 92.70 ON LOWER END OF THE 4TH VERTICAL STIFFENER FROM THE FRONT IAW EA 1-755-3795 REV IR AND ER 17-03850Aug 15, 2017 · N7861J · Boeing 73779PSDR SWAA2022013019685Rib · crackedRT HORIZONTAL STAB IN SPAR RIB AT 92.70 IS CRACKED ON THE LOWER END OF THE 3RD VERTICAL STIFFENER FROM THE FRONT. / REMOVED CRACK DAMAGE FABRICATED AND INSTALLED REPAIR PARTS IAW SRM 55-10-09-2R-4Aug 15, 2017 · N7861J · Boeing 73779PSDR SWAA2017092516568Rib · crackedRT HORIZONTAL STABILIZER IN SPAR RIB CRACKED AT 92.70, LOWER END OF THE 2ND VERTICAL STIFFENER FROM THE FRONT. REPAIRED RIB IAW SRM.Aug 15, 2017 · N7861J · Boeing 7377*SDR SWAA2017092516567Rib · crackedLT HORIZONTAL STABILIZER IN SPAR RIB CRACKED AT STAB STA 92.70, LOWER END OF THE 3RD VERTICAL STIFFENER FROM THE FRONT. REPAIRED RIB IAW EA AND ER.Aug 15, 2017 · N7861J · Boeing 7377*SDR SWAA2017082815913Rib · crackedLEFT HORIZONTAL STABILIZER RIB ASSEMBLY CRACKED AT HSS 120.30, SECOND ONE AFT. REPAIRED THE RIB ASSEMBLY IAW EA.Aug 15, 2017 · N420WN · Boeing 7377H4SDR SWAA2017091216239Rib · crackedRIGHT HORIZONTAL STABILIZER IN SPAR RIB CRACKED AT HSS 120.30, AT THE LOWER END OF THE THIRD VERTICAL STIFFENER FROM FRONT. REPAIRED THE RIB IAW SRM.Aug 14, 2017 · N708SW · Boeing 7377H4SDR SWAA2017082815912Rib · crackedLEFT HORIZONTAL STABILIZER RIB ASSEMBLY CRACKED AT HSS 129.50, THIRD ONE AFT. REPAIRED THE RIB ASSEMBLY IAW ER AND EA.Aug 14, 2017 · N420WN · Boeing 7377H4SDR SWAA2017082815911Rib · crackedLEFT HORIZONTAL STABILIZER RIB ASSEMBLY CRACKED AT HSS 120.30, THIRD AFT. REPAIRED RIB ASSEMBLY IAW EA.Aug 14, 2017 · N420WN · Boeing 7377H4SDR SWAA2017082815910Rib · crackedLEFT HORIZONTAL STABILIZER RIB ASSEMBLY CRACKED AT HSS 92.7, THIRD ONE AFT. REPAIRED RIB ASSEMBLY IAW EA.Aug 14, 2017 · N420WN · Boeing 7377H4SDR SWAA2017082815909Rib · crackedLEFT HORIZONTAL STABILIZER RIB ASSEMBLY CRACKED AT HSS 92.7, SECOND ONE AFT. REPAIRED THE RIB ASSEMBLY IAW EA.Aug 14, 2017 · N420WN · Boeing 7377H4SDR DALA2017081506266Rib · crackedDURING INSPECTION, FOUND LEFT HORIZONTAL STABILIZER, HSS 92.70 RIB, THIRD STIFFENER FROM FRONT SPAR IS CRACKED. MAINTENANCE REPAIRED THE RIB IAW SRM 55-10-09, REPAIR 4.Aug 14, 2017 · N383DN · Boeing 737832SDR DALA2017081506265Rib · crackedDURING INSPECTION, FOUND THE LEFT HORIZONTAL STABILIZER, HSS 92.70 RIB, SECOND STIFFENER FROM FRONT SPAR IS CRACKED. MAINTENANCE REPAIRED THE RIB IAW SRM 55-10-09, REPAIR 4, & SRM 55-10-01, REPAIR 11.Aug 14, 2017 · N383DN · Boeing 737832SDR DALA2017081506271Rib · crackedDURING INSPECTION, FOUND THE LEFT HORIZONTAL STABILIZER, HSS 92.70 RIB, FIRST STIFFENER FROM FRONT SPAR IS CRACKED. MAINTENANCE REPAIRED THE RIB IAW SRM 55-10-09, REPAIR 4.Aug 14, 2017 · N383DN · Boeing 737832SDR R61A201708130627Rib · crackedCRACK ON THE RT HORIZONTAL STAB RIB 12 AT UPPER SKIN ATTACHMENT, AFT OF SPAR 1. REMOVED AND REPLACED THE RIB.Aug 13, 2017 · N210JQ · Emb ERJ170200LR
Back to JASC 5511