What it covers
For specific reports of spars/ribs on the elevator.
Service difficulty reports · 519
Reports filed under 5521, newest first.
| 1995 | 34 |
|---|---|
| 1996 | 30 |
| 1997 | 32 |
| 1998 | 32 |
| 1999 | 25 |
| 2000 | 31 |
| 2001 | 25 |
| 2002 | 13 |
| 2003 | 18 |
| 2004 | 17 |
| 2005 | 12 |
| 2006 | 11 |
| 2007 | 18 |
| 2008 | 3 |
| 2009 | 8 |
| 2010 | 5 |
| 2011 | 10 |
| 2012 | 7 |
| 2013 | 9 |
| 2014 | 16 |
| 2015 | 7 |
| 2016 | 6 |
| 2017 | 9 |
| 2018 | 12 |
| 2019 | 6 |
| 2020 | 23 |
| 2021 | 40 |
| 2022 | 18 |
| 2023 | 6 |
| 2024 | 11 |
| 2025 | 12 |
| 2026 | 13 |
SDR FDEA202610121557Frame · corrodedLEFT ELEVATOR CONDUCTIVE FRAME MULTIPLE ZONES WITH CORROSION (UPPER AND LOWER) EVALUATED CONDUCTIVE FRAME LH ELEVATOR UPPER/LOWER HORIZONTAL STABILIZER AND REPLACED CONDUCTIVE SPLICE PLATE (02EA) AND SHIMS (02EA) UPPER/LOWER IAW B757 SRM 51-40-02-0G, SRM 5SDR LR7A2026101103991Rib · crackedDURING SCHEDULED B-3 CHECK WHILE PERFORMING OTHER MAINTENANCE, FOUND LH ELEVATOR RIBS CRACKED AT HSS71L AND HSS84L. / REPAIR BY REPLACEMENT ACCOMPLISHED IAW LOCKHEED SMP583 SRM, CH. 51-60 & 51-70. NR# 1001428811.SDR LR7A2026101103990Rib · brokenDURING SCHEDULED B-3 CHECK UNDER JOB CARD HB2703, FOUND LT ELEVATOR RIBS BROKEN AT HSS76L AND HSS80L. REPAIR BY REPLACEMENT ACCOMPLISHED IAW SMP583 SRM, CH. 51-60 & 51-70.
See all 519 reports