JASC 5531
Service difficulty reports · 1,234
Reports filed under 5531 · Vertical Stabilizer, Spar/Rib, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5531' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5531' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR GLBA2013061300613Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK IN THE RT FWD SPAR CAP ANGLE AT 2D FASTENER HOLE FROM TOP OF ANGLE AT VSS 5.00, 0.375" IN LENGTH. OPENSDR TIMA20130531005Spar Cap · crackedA CRACK WAS DISCOVERED IN THE LT FWD SPAR CAP OF THE VERTICAL STABILIZER ABOVE CSS 61. REPAIRED IAW FR-CO-02599, REV 1.SDR DALA13023009201Frame · corrodedVERTICAL STABLILIZER UPPER FORWARD FRAME HAS CORROSION. R & R FWD FRAME IAW DWG 5957208 AND SRM 51-10-05 VOLII, PG 1.SDR REXA2013051600664Stringer Splice · bentVERTICAL STABILIZER STRINGER EXTENSION SPLICE IS BENT JUST AFT OF MID SPAR 43.75 ON THE UPPER EDGE OF THE FUSELAGE SKIN. REPAIRED IAW SRM 51-42-06.SDR GLBA2013051600250Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND A CRACK IN THE SPAR CAP, RT VERT STAB, SECOND FASTENER DOWN FROM THE TOP, .375" IN LENGTH. REPAIRED IAW EO 13-1900-55-015. MAJOR REPAIR.SDR DALA13018129239Spar Cap · damagedRT SIDE VERTICAL STAB SPAR CAP 7.5" BELOW ZFS=52.267 HAS 1EA ELONGATED HOLE. REPAIR VERTICAL STAB SPAR CAP RT SIDE AT ZFS 45.6 IAW ERA 504840-14AD, REV ORIGINAL.SDR GLBA2013032500215Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND A CRACK IN THE RT SPAR CAP AT THE SECOND FASTENER, FWD VERT STAB, 0.375" IN LENGTH. REPAIRED IAW EO 13-1900-55-008. MAJOR REPAIR.SDR GLBA2013031800213Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK IN THE VERTICAL STABILIZER LT SPAR CAP ANGLE AT 20 PERCENT CHORD AT FSS 84.10, GOING THROUGH THE THIRD FASTENER FROM THE TOP (SECOND FASTENER BELOW THE HAT SECTION) IN THE AREA OF THE HORIZONTAL STAB ATTACH SDR FDEA201302270473Spar · damagedMISDRILLED HOLE AT VERTICAL STAB REAR SPAR WEB CUT-OUT FOR PANEL 324KZ. COMPLIED WITH EA F- 5530 -TO 300189. MAJOR REPAIR.SDR FDEA201302220409Spar · crackedEMPENNAGE - LOWER VERTICAL STABILIZER NR 2 ENGINE INTAKE DUCT LT REAR CENTER SPAR TO REAR SPAR FOUND CRACKED. REPAIRED AS PER SRM 55-30-02 REPAIR 2 FIGURE 201 REVISION 51. REPAIR CLASSIFIED AS MAJOR PER GMM 6-2-100 REVISION 116.SDR FDEA201302220407Spar · crackedEMPENNAGE - LOWER VERTICAL STABILIZER NR 2 ENG INLET DUCT RT CENTER SPAR TO REAR SPAR FOUND CRACKED. REPAIRED AS PER SRM 55-30-02 REPAIR 2 FIGURE 201 REVISION 51. REPAIR CLASSIFIED AS MAJOR PER GMM 6-2-100 REVISION 116.SDR DALA13008629015Spar · damagedLT VERTICAL STAB FRONT SPAR DAMAGED. ACCOMPLISHED SECTION 1 OF ERA 511541-14AD, REV O.SDR DALA13006879204Frame · corrodedVERTICAL STABILIZER UPPER FORWARD END, LT SIDE FRAME FOR SKIN PANEL, CORRODED. WORK ACCOMPLISHED ON ER/A 510927-14, REV O.SDR GLBA2013010400170Spar Cap · crackedDURING A SCHEDULED ROUTINE INSP, FOUND A CRACK IN RT FORWARD SPAR CAP ANGLE AT CSS 69.184 AND 20 PERCENT CHORD, 2.5" IN LENGTH. REPAIRED IAW EO 13-1900-55-005. MAJOR REPAIR.SDR GLBA2013010400169Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND A CRACK IN THE LT FWD SPAR CAP ANGLE AT CSS 69.184 AND 20 PERCENT CHORD, 1.75" IN LENGTH. REPAIRED IAW EO 13-1900-55-004. MAJOR REPAIR.SDR TIMA20130611001Spar Cap · crackedDURING A SCHEDULED STRUCTURAL INSP A CRACK WAS DISCOVERED IN THE RT FWD SPAR CAP ABOVE CSS 62. REPAIRED CRACK IN FWD RT SPAR CAP BY REMOVING THE DAMAGED SECTION OF THE CAP AND SPLICING IN A NEW SECTION IAW FR-CO-02599.SDR JGV2013F00000Spar Cap · crackedDISCOVERED LT CENTER VERTICAL SPAR CAP CRACKED.SDR GLBA2013011400155Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK ON THE RT VERTICAL STAB FWD SPAR CAP ANGLE BY THE TOP RIVET GOING TOWARDS THE BEND RADIUS, 1" IN LENGTH. REPAIRED IAW EO 13-1900-55-003.SDR GLBA2012122000135Spar Cap · crackedDURING A SCHEDULED ROUTINE INSP, FOUND A CRACK IN THE RT SPAR CAP ON VERTICAL STAB AT TOP HOLE, .5" IN LENGTH. REPAIRED IAW EO 12-1900-55-069. MAJOR REPAIR.SDR GLBA2012120600129Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK IN THE LT SPAR CAP ANGLE ON VERTICAL STAB AT SECOND FASTENER FROM THE TOP, .75" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW EO 12-1900-55-066. MAJOR REPAIRSDR GLBA2012120600128Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND 2 CRACKS IN THE RT SPAR CAP ANGLE ON VERT STAB AT SECOND FASTENER FROM THE TOP, 1.25" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW EO 12-1900-55-067. MAJOR REPAIRSDR GLBA2012112900123Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND CRACK ON THE LT VERTICAL STAB FWD SPAR CAP ANGLE AT VSS 84.10 AND 20 PERCENT CHORD MOVING DOWNWARD, 2.5" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW EO 12-1900-55-062. MAJOR REPAIR.SDR GLBA2012112900122Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND A CRACK ON THE RT VERTICAL STAB FWD SPAR CAP ANGLE AT THE 2ND RIVET FROM THE TOP AT FSS 84.10 AND 20 PERCENT CHORD, .375" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW EO 12-1900-55-063. MAJOR REPAIR.SDR FDEA201211284191Spar · crackedEMPENNAGE, RT LOWER VERTICAL STABILIZER REAR SPAR FRAME APPROX STATION YTN= 121 ACCESS THRU PANEL NR 364RR FOUND WEB CRACKED. REPAIRED IAW SRM 55-30-02, REPAIR 2, REV 51.SDR FDEA201211284190Spar · crackedEMPENNAGE, LT LOWER VERTICAL STABILIZER REAR SPAR FRAME APPROX STATION YTN= 121 ACCESS THRU PANEL NR 363PL FOUND WEB CRACKED. REPAIRED IAW SRM 55-30-02, REPAIR 2, REV 51.SDR GLBA2012112800119Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND TWO CRACKS ON THE LT FWD SPAR CAP ANGLE ON VERTICAL STABILIZER, ONE CRACK GOING DOWN TO THE FIRST FASTENER HOLE AND 1 NEXT TO THE SECOND FASTENER HOLE, 0.875" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW FR-CO-02580SDR GLBA2012112600116Spar · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND THE LT VERTICAL FWD SPAR CAP ANGLE HAS A CRACK AT TWO RIVETS AT FSS 84.10 AND 20 PERCENT CHORD, .25" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW EO 12-1900-55-059. MAJOR REPAIR.SDR ABXA20121116345Rib · crackedVERTICAL STABILIZER LEADING EDGE PANEL 321C HAS A CRACKED SUPPORT RIB. SUPPORT RIB WAS REPAIR IAW B767-200 SRM 55-30-09. ACFT WAS GROUNDED.SDR GLBA2012111400109Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND 2 CRACKS ON THE VERTICAL STAB RT FWD SPAR CAP ANGLE TOP TWO RIVETS, 1.25" IN LENGTH. MAINTENANCE REPAIRED IAW EO 12-1900-55-057. MAJOR REPAIR.SDR GLBA2012111400110Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND TWO CRACKS ON THE VERTICAL STAB LT FWD SPAR CAP ANGLE TOP TWO RIVETS, 2 INCHES IN LENGTH. MAINTENANCE REPAIRED IAW EO 12-1900-55-056. MAJOR REPAIR.SDR DALA12012590952Spar · damagedVERTICAL STABILIZER FRONT SPAR HAS AN OVERSIZED HOLE. PERFORMED LFEC HFEC AND BHEC INSPECTIONS OF LT AND RT VERTICAL STABILIZER. NO CRACKS INDICATED. PERFORMED DETAILED INSPECTION TO VERTICAL STAB L/E STRUCTURE. C/W SECTION 2 OF ERA 489672-14AD REV B .SDR GLBA2012110800104Spar · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND TWO CRACKS IN THE LT VERTICAL STAB FWD SPAR CAP ANGLE AT 84.10 AND 20 PERCENT CHORD RADIATING UPWARD FROM THE TOP FASTENER HOLE AND THE OTHER CRACK RADIATING AROUND THE SECOND FASTENER HOLE FROM THE TOP, .875" IN TSDR 29GA95555110712Angle · corrodedDURING SCHEDULED ROUTINE INSPECTION DISCOVERED VERTICAL SPAR LEFT AND RIGHT ANGLES BELOW RUDDER ATTACH BRACKET HAS CORROSION. BLENDED CORROSION FROM LEFT AND RIGHT VERTICAL SPAR ANGLES AND PERFORMED NDT INSPECTION NO EVIDENCE OF CORROSION NOTED.SDR GLBA2012102400087Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND A CRACK ON THE VERTICAL STAB RT FWD SPAR CAP ANGLE FROM UPPER FASTENER HOLE TO UPPER EDGE OF ANGLE, .5" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW EO 12-1900-55-050. MAJOR REPAIR.SDR GLBA2012101900081Spar · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK ON THE VERTICAL STAB LT SPAR CAP ANGLE AT 20 PERCENT, STARTING AT TOP FASTENER AT FSS 84.18 MOVING DOWN TO THIRD FASTENER AT FSS 84.16, 1.75" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW EO 12-1900-55-048.SDR USAA2012100500009Spar · corrodedC3 CHECK - VERTICAL STABILIZER REAR SPAR CORRODED FROM FIN STATION 219.5 TO FIN STATION 228. REMOVED CORROSION IAW EA 502578.SDR GLBA2012100100072Spar · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK ON THE VERTICAL STAB LT FWD SPAR CAP ANGLE AT VSS 84.10 AT 20 PERCENT. 1.5 INCHES IN LENGTH. REPAIRED IAW EO 11-1900-55-043.SDR GLBA2012100100071Spar · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND FOUR CRACKS ON THE VERTICAL STAB RT FWD SPAR CAP ANGLE AT VSS 84.10 AT 20 PERCENT CHORD, CRACKED FROM FIRST RIVET HOLE AND SECOND CRACK IS FROM SECOND RIVET HOLE, AND THIRD CRACK AT THIRD RIVET HOLE, AND FOURTH CRASDR FXGA201209281276Spar · corrodedCORRODED VERTICAL STABILIZER FRONT SPAR ATTACH FITTINGS. R & R.SDR GLBA2012092400067Angle · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND TWO CRACKS ON THE LT FWD SPAR CAP ANGLE ON THE VERTICAL STAB COMING DOWN TO THE FIRST FASTENER, .375" IN LENGTH, AND A SECOND CRACK NEXT TO THE SECOND FASTENER FROM THE TOP, .5" IN LENGTH. REPAIRED IAW FR-CO-02532,SDR GLBA2012092400066Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND CRACK ON THE RT FWD SPAR CAP ANGLE ON THE VERTICAL STAB COMING DOWN TO THE FIRST FASTENER, .375" IN LENGTH. REPAIRED IAW FR-CO-02532 REV 1, STEP 1. MAJOR REPAIR.SDR GLBA2012092000065Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK IN THE LT FWD SPAR CAP ANGLE AT THE VERT STAB AT VSS 84.10 AND THE 20 PERCENT AT THE SECOND FASTENER, CRACK RADIATES DOWNWARD FROM FASTENER, .375" IN LENGTH. REPAIRED IAW FR-CO-02530, REV 1, STEP 1. MAJOSDR GLBA2012091800063Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND TWO CRACKS ON THE VERTICAL STAB LT FWD SPAR CAP ANGLE, (1) RADIATES UPWARD FROM THE UPPER FASTENER TO THE EDGE OF THE SPAR CAP ANGLE, RADIATES DOWNWARD FROM THE SECOND FASTENER, VSS 84.10 AT 20 PERCENT CHORD, .875" SDR GLBA2012091700061Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK IN THE VERTICAL STAB LT FWD SPAR CAP ANGLE AT VSS 84.10, 20 PERCENT CHORD AT 2ND RIVET FROM TOP, 1" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW EO 12-1900-55-035. MAJOR REPAIR.SDR GLBA2012091700060Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND A CRACK IN THE VERT STAB RT FWD SPAR CAP ANGLE AT VSS 84.10, 20 PERCENT CHORD BY 2ND RIVET FROM THE TOP, .5" IN LENGTH. MX REPAIRED THE AFFECTED AREA IAW EO 12-1900-55-036. MAJOR REPAIR.SDR GLBA2012091200054Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION FOUND A CRACK ON THE VERTICAL STAB LT SPAR CAP ANGLE AT THE 20 PERCENT CHORD TOP FASTENER AT VSS 84.18, .125" IN LENGTH. REPAIRED IAW FR-CO-02520R1 STEP 1. MAJOR REPAIRSDR GLBA2012091000051Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK IN THE VERTICAL STAB RT SPAR CAP ANGLE AT 20 PERCENT AT VSS 84.10, 1.25" IN LENGTH. REPAIRED AFFECTED AREA IAW EO 12-1900-55-031. MAJOR REPAIRSDR GLBA2012091000050Spar Cap · crackedDURING A SCHEDULED ROUTINE INSPECTION, FOUND A CRACK IN THE VERTICAL STAB LT SPAR CAP ANGLE AT 20 PERCENT AT VXX 84.10, 1.25" IN LENGTH. REPAIRED AFFECTED AREA IAW EO 12-1900-55-030. MAJOR REPAIR.SDR ASAA2012090792978Rib · dentedVERTICAL STABILIZER, HORIZONTAL WEB BELOW STANDBY RUDDER ACTUATOR INPUT ROD LT SIDE FWD END DENTED. INSTALLED REPAIR ANGLE IAW REO G15413, REV A & EA 900-55EA-08828.SDR DALA12015400957Spar · crackedVERTICAL STABILIZER FRONT SPAR, RT CHORD ZFS=52 / CRACKED.
Back to JASC 5531