Boeing 737-524

Service difficulty reports · 1,586

Newest first. General aviation reporting is voluntary.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE aircraft_model_key = '737524'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR CALA2011032400175Frame · crackedFRAME CRACKED STA 907 AT S-9L. CTN53-304-108 INSTALLED REPAIR ANGLES A&B REF EA 5310-04498 REV A.Feb 11, 2011 · N11612 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011032400177Frame · crackedFRAME CRACKED STA 907 AT S-9R CTN53-304-108 INSTALLED REPAIR ANGLES A&B PER EA.5310-04498, REV-A.Feb 11, 2011 · N11612 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011020900077Angle · corrodedSMALL AREAS OF LIGHT CORROSION (MARKED) ON FLOOR STRUCT. "Z" ANGLE AT R2 DOOR OPENING. REMOVED DAMAGE, FOUND OUT OF LIMITS SRM 53-60-15 FIG 101. REMOVED AND REPLACED "Z" ANGLE AT R2 DOOR SRM 51-40-02.Feb 9, 2011 · N11612 · Boeing 737524 · Fuselage Miscellaneous StructureSDR CALA2011020800072Frame · crackedFRAME IS CRACKED AT O/H BIN RAIL STA 360 S-8L. INSTALLED REPAIR DOUBLERS IN REF ECRA 5310-05351.Feb 8, 2011 · N11612 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011020800071Support Bracket · crackedSUPPORT TASK - STA 482 AIR CONDITIONING SUPPORT BRACKET BTWN S-8 LT & S-9 LT I/B RIVET HOLE CRACKED. INSTALLED REPAIR ANGLES REF EA 5310-04498 REV A OP 02.Feb 8, 2011 · N11612 · Boeing 737524 · Fuselage Miscellaneous StructureSDR CALA2011020700066Frame · crackedFRAME IS CRACKED AT O/H BIN RAIL STA 400 S-8L. INSTALLED REPAIR DOUBLERS AT O/H BIN RAIL STA 400 STR 8L REF EA 5310-04498 REV A.Feb 6, 2011 · N11612 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011020100057Frame · corrodedABB STA 767 FWD SIDE OF FRAME HAS CORROSION BL 0 TO S27R AND TOP OF FRAME. REPAIRED FRAME STA 767 IN ABB, BL 0 TO S27R REF SRM 53-00-07 REPAIR 3.Jan 31, 2011 · N14628 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011013100054Warning System · false activationRIGHT MAIN LANDING GEAR INDICATED EXTENDED AFTER T/O RED& GREEN R GEAR LTS INDICATED. REF 32-61-00 PG BLK 001 NR 5 (OPERATION) JACKED A/C OPERATED LAND GEAR EXT/RET OPS NORMAL.Jan 31, 2011 · N19638 · Boeing 737524 · Landing Gear Position and WarningSDR CALA2011013100051Controller · failedAC WOULD NOT PRESSURIZE IN AUTO OR STANDBY. T/S PER MM 21-31-00. NR 2 AUTO PRESSURE CONTROLLER FAILED. REMOVED AND REPLACED DAPC AND OPS CHECKED AS PER MM 21-31-21. COMPLIED WITH EC 2100-01187. PER MM 21-30-00-800-801C3. LMPH CHECK. ALL REQUIREMENTS OF Jan 31, 2011 · N14645 · Boeing 737524 · Cabin Pressure ControllerSDR CALA2011012800045Frame · corrodedCORROSION ON FRAME STA 807 FWD SIDE BETWEEN STR 27 LT AND 27 RT. CUT OUT DAMAGED SECTION OF SHEAR TIE, FABRICATED REPAIR PARTS AND INSTALLED REF SRM 53-00-07.Jan 26, 2011 · N14628 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011012800044Crease Beam · corrodedCABIN CREASE BEAM WEB AT FLOOR STA 847 TO 867 STR 17 RT HAVE CORROSION. INSTALLED NEW SHEAR WEB PER SRM 51-40-02 PARGRAPH 4 AND 51-10-02 PARGRAPH 8.Jan 26, 2011 · N14628 · Boeing 737524 · Fuselage Main, StructureSDR CALA2011012000028Transmitter · inoperativeWHILE EXTENDING FLAPS, FLAPS STOPPED EXTENDING BETWEEN 1+2DEG. ALTERNATE FLAP EXTENSION PROCEDURE USED FOR FLAP 15DEG LANDING. R & R LEFT WING FLAP POSITION TRANSMITTER IAW MM27-58-12 404/ 406. OPS CHECK GOOD. PERFORMED LAND VERIFY IAW 22-03-10 (TEST PASSEJan 19, 2011 · N59630 · Boeing 737524 · Trailing Flap Position Indicating SystemSDR CALA2011011700025Frame · crackedSUPPORT TASK. STA 303.9 FRAME WEB AT STRINGER S16L HAS CRACKED AT LOWER O/B AREA OF OVAL HOLE. REPAIRED FRAME WEB AT STA 303.9 PER EA 5310-04659 OP 02.Jan 17, 2011 · N16632 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011011700024Frame · corrodedB737-53-3-0306, ABB STA 907 BETWEEN S-27-LT & S-26-LT CORROSION ON FRAME. INSTALLED REPAIR DOUBLER ON STA 907 BETWEEN S-27 LT & S-26 LT REF SRM 53-00-07.Jan 15, 2011 · N16632 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011011400023Hinge Fitting · crackedSUPPORT TASK - L-1 DOOR JAMB LOWER HINGE FITTING CRACKED. REPLACED LOWER HINGE FITTING PER SRM 51-40-02.Jan 14, 2011 · N16632 · Boeing 737524 · Fuselage, Door HingeSDR CALA2011011400022Skin · dentedFWD ACCESS DOOR INTERIOR SKIN GOUGED AND DENTED. FABRICATED INNER SKIN REF SRM 54-40-01, ALODINED, PRIMED AND IN STALLED REF SRM 51-40-02.Jan 14, 2011 · N16632 · Boeing 737524 · Fuselage Main, Plate/SkinSDR CALA2011011400021Skin · crackedSUPPORT TASK: KEEL BEAM SKIN HAS A 1.5 INCH CRACK AT STA 682 LBL-5 INSTALLED REPAIR DOUBLER PER SRM 53-60-12 FIG 201 REPAIR 2, EA 5330-01103 OP 1, EA 5330-01103 REV B OP 4 AND ECRA 5330-04096.Jan 14, 2011 · N16632 · Boeing 737524 · Fuselage Main, Plate/SkinSDR CALA2011011300020Battery Pack · dischargedDURING S CHECK FOUND SEVERAL EMER LIGHTS INOP, LT OVERWING EXIT SIGN LIGHT, CABIN CENTER SEAT LIGHTS. R&R EMERGENCY LIGHT BATTERY PACK AT M1669. OPS CHECK GOOD IAW 737M/M 33-51-51.Jan 13, 2011 · N14628 · Boeing 737524 · Emergency LightingSDR CALA2011010300002Channel · corrodedAPB STA 1016 BL-0 CORROSION ON APB AND CHANNEL STIFFENER CUTOUT DAMAGED SECTION OF CHANNEL STIFFENERS. DRILLED UP REPAIR PARTS AND INSTALLED REF BOEING DWG 65C28106 REV B.Dec 30, 2010 · N17627 · Boeing 737524 · Fuselage Miscellaneous StructureSDR CALA2010122300635Hinge Fitting · crackedL1 DOOR FWD JAMB LOWER HINGE FITTING CRACKED. REMOVED AND REPLACED LOWER HINGE FITTING REF SRM 51-40-02.Dec 23, 2010 · N17627 · Boeing 737524 · Fuselage, Door HingeSDR CALA2010122200634Battery · dischargedEMERGENCY FLASHLIGHT AT FWD F/A JUMPSEAT DOES NOT BLINK. REMOVED AND REPLACED BATTERY, OPS CHECK OK.Dec 22, 2010 · N16646 · Boeing 737524 · Emergency EquipmentSDR CALA2010122200632Battery · dischargedSUPPORT TASK - EMERGENCY LIGHTS INOP AT 2R LOWER EXIT SIGN. REPLACED BATTERY IAW B737 MM 33-51-51, OP CHECKS GOOD.Dec 22, 2010 · N14613 · Boeing 737524 · Emergency LightingSDR CALA2010122200631Battery · dischargedSUPPORT TASK - EMERGENCY LIGHTS INOP AISLE SIDE 28C, 29C, 30C, 31C. REPLACED BATTERY IAW B737MM 33-51-51 OP CHECK GOOD.Dec 22, 2010 · N14613 · Boeing 737524 · Emergency LightingSDR CALA2010122200630Battery · dischargedSUPPORT TASK - EMERGENCY LIGHTS INOP AT OVERHEAD BINS 28DEF AND 31DEF. REPLACED BATTERY IAW B737 MM 33-51-51 AND OP CHECK GOOD.Dec 22, 2010 · N14613 · Boeing 737524 · Emergency LightingSDR CALA2010122000625Channel · corrodedSTA 787, S24-25L CORRODED, REMOVED CORROSION, ORIGINAL THICKNESS .050 MAT REMAINING .033. FOUND TO BE OUT OF LIMITS IAW SRM 53-00-01, FIG 101. REMOVED CHANNEL IAW SRM 51-40-02. INSTALLED NEW CHANNEL IAW SRM 51-40-02. NEW CHANNEL FABRICATED ON N/R 6603371/10 Dec 20, 2010 · N14613 · Boeing 737524 · Fuselage Miscellaneous StructureSDR CALA2010121500620Skin · dentedSUPPORT TASK - WHEN PERFORM DMG LOG PAGE 6311298 INSP ON ABB DOOR FOUND DENT OUT OF LIMIT PER SRM 52-00-01. A/Y =18.8. LOCATED 16 IN FROM AFT EDGE AND 21 IN FROM TOP CUT OUT DAMAGED AREA, FABRICATED DOUBLER, ALODINED AND PRIMED AND INSTALLED REPAIR DOUBLER PEDec 15, 2010 · N14629 · Boeing 737524 · Cargo/Baggage DoorsSDR CALA2011040100250Skin · puncturedAIRCRAFT DAMAGE, LT HORIZONTAL BOTTOM SKIN PUNCTURE. CUT OUT DAMAGED AREA, FABBED REPAIR DOUBLER & FILLER & INSTALLED REPAIR REF SRM 55-10-01 FIG 201.Dec 14, 2010 · N14655 · Boeing 737524 · Horizontal Stabilizer, Plate/SkinSDR CALA2010121500617Hinge Fitting · crackedL-1 DOOR LOWER HINGE FITTING IS CRACKED. REMOVED AND REPLACED L-1 DOOR LOWER HINGE FITTING REF SRM 51-40-02.Dec 14, 2010 · N14629 · Boeing 737524 · Passenger/Crew DoorsSDR CALA2011040100249Frame · crackedSUPPORT TASK - FRAME AT STATION 400 RIGHT HAS CRACK INDICATION BETWEEN STRINGER 8 &9 AT A/C SUPPORT BRACKET ATTACHMENT HOLE. REPAIRED IAW CAL EA 5310-04498.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011040100248Frame · crackedFRAME AT STATION 360 LEFT HAS CRACK INDICATION BETWEEN STRINGER 8 TO 9 AT A/C SUPPORT (SUPPORT TASK). CUT OUT FRAME DAMAGE NO CRACK FOUND REPAIR ANGLE B FABBED ON N/ R 43339 (6603339), ANGLE A AND B LOCATED AND DRILLED IAW B737 EA 5310-04498, ALODINED AND PDec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011040100247Frame · crackedSUPPORT TASK - FRAME AT STATION 867 RIGHT HAS CRACK INDICATION BETWEEN STRINGER 8 &9 AT A/C SUPPORT BRACKET ATTACHMENT HOLES. REPAIRED IAW CAL EA5310-04498.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011040100246Frame · crackedSUPPORT TASK - FRAME AT STATION 440 RIGHT HAS CRACK INDICATION BETWEEN STRINGER 8 &9 AT A/C SUPPORT BRACKET ATTACHMENT HOLES. REPAIRED IAW CAL EA 5310-04498.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011040100245Frame · crackedSUPPORT TASK - FRAME AT STATION 380 RIGHT HAS CRACK INDICATION BETWEEN STRINGER 8 &9 AT A/C SUPPORT BRACKET ATTACHMENT HOLES REPAIRED IAW CAL EA 5310-04498.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011031700153Frame · crackedFRAME AT STATION 907 LEFT HAS CRACK INDICATION BETWEEN STRINGER 8&9 AT SUPPORT BRACKET ATTACHMENT HOLES. ACCOMPLISHED FRAME REPAIR AT STA 907 LEFT IAW CAL EA 5310-04498.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011031700154Frame · crackedFRAME 747 RIGHT HAS CRACK INDICATION BETWEEN STRINGER 8&9 AT A/C SUPPORT BRACKET ATTACHMENT HOLES. ACCOMPLISHED FRAME REPAIR AT STA 747 RIGHT IAW CAL EA 5310-04498.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011031700152Frame · crackedFRAME AT STATION 867 LEFT HAS CRACK INDICATION BETWEEN STRINGER 8&9 AT A/C SUPPORT BRACKET ATTACHMENT HOLE. REMOVED BRACKET, PERFORMED HFEC, REMOVED DAMAGED AREA, FABBED ANGLES AND INSTALLED ANGLES AND BRACKETS IAW EA 5310-04498 AND B737 SRM 51-20-01.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011031700151Frame · crackedFRAME 482 LEFT HAS A CRACK INDICATION BETWEEN STRINGER 8&9 AT A/C SUPPORT BRACKET ATTACHMENT HOLES. ACCOMPLISHED FRAME REPAIR AT STATION 482 IAW CAL EA 5310-04498.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011031700150Frame · crackedFRAME AT STATION 440 LEFT HAS CRACK INDICATION BETWEEN STRINGER 8&9 AT A/C SUPPORT BRACKET ATTACHMENT HOLES (SUPPORT TASK) - ACCOMPLISHED FRAME REPAIR IAW CAL EA 5310-04498 AT STA 440 LEFT.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2011031700149Frame · crackedFRAME AT STATION 907 RIGHT HAS CRACK INDICATION BETWEEN STRINGER 8&9 AT A/C SUPPORT BRACKET ATTACHMENT HOLES. REPAIRED IAW CAL EA 5310-04498.Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2010121300615Crease Beam · corrodedCREASE BEAM WEB HAS CORROSION STA 847LT TO 867LT. REMOVED AND REPLACED WEB AT STA 847-867 LT REF SRM 51-40-02.Dec 13, 2010 · N14629 · Boeing 737524 · Fuselage Main, StructureSDR CALA2010121300614Frame · crackedSUPPORT TASK - FRAME AT STATION 827 LEFT HAS CRACK INDICATION B ETWEEN STRINGER 8&9 AT A/C SUPPORT BRACKET ATTACHMENT HOLES REMOVED SUPPORT BRACKET IAW EA 5310-04498. CUT OUT DAMAGED HOLES IAW EA5310-04498. HFEC IAW 737NDT MAN PT 6 51-00-00 FIG 23. LOCATED Dec 13, 2010 · N14613 · Boeing 737524 · Fuselage Main, FrameSDR CALA2010121300611Frame · crackedSUPPORT TASK, FUSELAGE FRAME WEB AT STA 303.9 AND STRINGER 16LT HAS CRACKS AROUND THE OVAL HOLE. PERFORMED REPAIR AT FUSELAGE FRAME AT STA 303.9 PER EA 5310- 04659 OP 02.Dec 13, 2010 · N14629 · Boeing 737524 · Fuselage Main, FrameSDR CALA2010121300610Intercostal · crackedE&E COMPT, INTERCOSTAL LOCATED AT LBL 10.0 AND BETWEEN FRAMES 344 AND 360 CRACKED IN TWO PLACES (MARKED) IN UPPER "L"ANGLE REMOVED &AMP. INSTALLED NEW ANGLE / SRM 51-40-02.Dec 11, 2010 · N14629 · Boeing 737524 · Fuselage Miscellaneous StructureSDR CALA2011032900214Frame · crackedBS 303.9 FRAME CRACKED AT STR 16L FORWARD SIDE AROUND OVAL HOLE. INSTALLED REPAIR PER ECRA 5311-01515. GENERATED DIP TO REINSPECT BEFORE THE ACCUMULATION OF 66000 TOTAL A/C FLY CYCLES PER PART 2 OF ECRA 5311-01515 REF DIP 08205 FRAME CRACKED STA 303.9 PER EDec 4, 2010 · N58606 · Boeing 737524 · Fuselage Main, FrameSDR CALA2010120600605Tee Fitting · damagedVERTICAL STABILIZER FRONT SPAR RT TEE CHORD DAMAGE REF L/P 8681063 FOR BIRD STRIKE. REPAIRED CHORD DAMAGE REF INTERIM REPAIR EC/RA 5530-01604 AND FORM 44.0008 FOR PARTIAL WORK PERFORMED. PLACED ON DIP TO ACCOMPLISH VISUAL INSP OF BLIND FASTENERS PER PART 2 ODec 3, 2010 · N17627 · Boeing 737524 · Vertical Stabilizer Miscellaneous StructureSDR CALA2010120300603Slide · low pressureFOUND R1 DOOR SLIDE PRESSURE LOW (NO GO). REMOVED AND REPLACED R1 DOOR SLIDE AS PER MM 25-61-35 OK TO CONTINUE ROTABLE PARTS CHANGE WAS INDICATED - TT # 1435041 SN OFF 00784 SLIDE, B737-300 OFF 03-2561-9-0002 0784 ON 03-2561-9-0002 0502.Dec 3, 2010 · N19623 · Boeing 737524 · Escape SlideSDR CALA2010120100600Skin · crackedCRACK INDICATION FOUND AT FWD ENTRY DOOR UPPER HINGE CUTOUT AFT FASTENER HOLE 4TH FROM TOP, REF EA 5330-03736 REV B, STEP 14, INSTALLED REPAIR IAW ECRA 5330-04091.Dec 1, 2010 · N58606 · Boeing 737524 · Fuselage Main, Plate/SkinSDR CALA2010120100599Skin · wornSUPPORT TASK - RT OTBD MIDFLAP, INBD L/E WORN. MARKED, TRIMMED OUT DAMAGED AREA AND INSTALLED FILLER AND DOUBLER IAW E CRA 5752-01496.Dec 1, 2010 · N58606 · Boeing 737524 · Trailing Edge FlapsSDR CALA2010120100598Threshold · corrodedR2 DOOR THRESHOLD INNER CHORD CORRODED AT BS 967 RBL 50 REMOVED R-2 DOOR THRESHOLD CHORD. RECEIVED NEW CHORD P/N 65-4585 50103 PO 697353.1. LOCATED AND DRILLED NEW CHORD IAW BAC DWG 65-45855. INSTALLED NEW CHORD IAW B737-500 SRM 51-40-02. REMOVED AND RE-INNov 30, 2010 · N14613 · Boeing 737524 · Fuselage Miscellaneous StructureSDR CALA2010120100597Beltframe · crackedSUPPORT TASK BELTFRAME STA 706 HAS CRACK INDICATION BETWEEN STRINGERS S8R AND S9R AT THE A/C OUTLET EXTRUSION SUPPORT BRACKET ATTACHMENT (RIVET BUCKED TAIL) AREA PER MID-FREQ EDDY CURRENT INSPECTION (MFEC). REPAIRED FRAME STA 706-R, PER EC/RA 5311-01514 AND ENov 29, 2010 · N58606 · Boeing 737524 · Fuselage Main, Frame
Back to Boeing 737-524