Douglas DC-8-71F
Service difficulty reports · 8,938
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC871F' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC871F' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR RRXA010544Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP T/E FORMER AT STA XFS 641.250, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 51-1-21.SDR RRXA010543Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP T/E FORMER AT STA XFS 635, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0 & 51-1-2SDR RRXA010542Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP T/E FORMER AT STA 616.250, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 51-1-21 & 57-2-SDR RRXA010540Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP T/E FORMER AT STA XS 213.750, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21SDR RRXA010539Doubler · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP DOUBLER ABOUT 2" AT STA XS 220.190, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-3-0 ASDR RRXA010538Bracket · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE ANGLE BRACKET BETWEEN STA XS 250.089 AND XS 252, DAMAGE EXCEEDED LIMITATIONS IAAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21.SDR RRXA010537Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP T/E FORMER AT STA XS 255, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 57-2-0.SDR UPS01834872Web · crackedINSPECTION TYPE:C1,3 STA 1300 AND 1350 LT CUSP MEMBRANE IS CRACKED. REPAIRED CUSP MEMBRANE IAW EO DC8-5330-2159.SDR RRXA10797Panel · misdrilledDURING A MAINTENANCE VISIT FOUND HOLE DAMAGE TO RT WING LWR FUEL TANK ACCESS PANEL AT PANEL 514I, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE,TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW E.O.#01-006 WITH APPROVED 8110-3 DSDR RRXA010575Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LT SIDE T/E FORMER AT STA ZFS 98, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0.SDR RRXA010574Skin · damagedDURING A MAINTENANCE VISIT FOUND A BROKEN OUT BOLT HOLE ON THE TOP PLATE, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0.SDR RRXA010573Former · crackedDURING A MAINTENANCE VISIT FOUND A 1" CRACK TO THE TOP I/B FORMER AT STA XS 520, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. ----------CX---------- (NO CRACK)SDR RRXA010572Former · crackedDURING A MAINTENANCE VISIT FOUND A 8" CRACK TO THE TOP I/B FORMER AT STA XS 253, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0.SDR RRXA010571Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE O/B BOTTOM T/E FORMER AT STA XFS 145, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21.SDR RRXA010570Angle · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE O/B TOP GUSSET ANGLE AT STA XFS 188.750, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-2SDR RRXA010569Panel · damagedDURING A MAINTENANCE VISIT FOUND ELONGATED HOLES ON THE BOTTOM SLOT PANEL, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW 51-1-22 AND 51-1-4.SDR RRXA010568Skin · damagedDURING A MAINTENANCE VISIT FOUND ELONGATED SCREW HOLES ON THE BOTTOM T/E BETWEEN STA XFS 85.000 TO STA XFS 91.250, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21 ASDR RRXA010567Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP FORMER AT STA XFS 448.581, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0.SDR RRXA010566Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP T/E FORMER AT STA 448.581, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0.SDR RRXA010565Panel · damagedDURING A MAINTENANCE VISIT FOUND ELONGATED HOLES TO THE BOTTOM SLOT PANEL, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-4.SDR RRXA010564Frame · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE CENTER WING FRAME FITTING AT STA 860 X+68", DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DCSDR RRXA010563Fitting · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CENTER WING FRAME FITTING AT STA 879 X+69", DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-SDR RRXA010562Stringer · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CAN'T LWR STR #54 ON THE R/H 505B INSIDE TANK AND O/B BETWEEN STA XRS 495 AND 508, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICASDR RRXA010560Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LT SIDE T/E FORMER AT STA ZFS 110, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0.SDR RRXA010559Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LT SIDE T/E FORMER AT STA 104.750, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0.SDR UPS01834811Rib · crackedINSPECTION TYPE:C1&3, LEFT WING L/E LOWER RIB IS CRACKED AT XFS 360. REPAIRED RIB IAW SRM 57-2-0 FIG 2.SDR UPS01834793Rib · crackedINSPECTION TYPE:C1&3, LEFT WING L/E UPPER RIB IS CRACKED AT XFS 760. REPAIRED RIB IAW SRM 57-2-0 FIG 2.SDR UPS01834792Rib · crackedINSPECTION TYPE:C1&3, LEFT WING L/E UPPER RIB IS CRACKED AT XFS 741.250. REPAIRED RIB IAW SRM 57-2-0 FIG 2.SDR UPS01834791Rib · crackedINSPECTION TYPE:C1&3, LEFT WING L/E UPPER RIB IS CRACKED AT XFS 728.75. REPAIRED RIB IAW SRM 57-2-0 FIG 2.SDR RRXA10831Skin · damagedDURING A MAINTENANCE VISIT FOUND ROUTED OUT DAMAGE TO C-PIT DOOR AT FWD/MID LIGHTNING HOLE, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW E.O. 01-006 WITH APPROVED 8110-3 DATED SDR RRXA010656Fitting · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE AFT ACC SUPPORT FITTING AT STA 1690 BETWEEN L36L TO L35L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAW DSDR RRXA010655Floorbeam · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FLOORBEAM CENTER WING STA 879, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW E.O.01-024 WITH APPROVED 8110-3 DATED 01/29/0SDR RRXA010654Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE AND POPPED RIVETS BETWEEN FRAMES -12 & -32 R/H O/B EDGE OF COCKPIT FLOOR X-12 TO -32 Y-66" Z-11, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM SDR RRXA010653Finger Doubler · damagedDURING A MAINTENANCE VISIT FOUND SEVERAL POPPED RIVETS TO THE COCKPIT SUB-FLOOR BETWEEN FRAMES X-32 & X-52 Y-20 Z-11, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-2SDR RRXA010652Fitting · gougedDURING A MAINTENANCE VISIT FOUND A GOUGE ABOVE THE L/H FLAP TRACK FITTING & MILL STOP AT STA 5, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 5SDR RRXA010651Longeron · crackedDURING A MAINTENANCE VISIT FOUND A CRACK IN UPPER MIL STOP APPROX 1/4" LONG AT LONGERON 24L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW E.O.#01-02SDR RRXA010650Skin · damagedDURING A MAINTENANCE VISIT FOUND SCREWS PULLING THROUGH SKIN ON THE SLOT VANE I/B END, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21.SDR RRXA010639Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP T/E FORMER AT STA XS 442.185, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0.SDR RRXA010634Skin · damagedDURING A MAINTENANCE VISIT FOUND ELONGATED HOLES IN REPAIR STRAP ON THE O/B SLOT VANE AT STA XS 520.168, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM.SDR IXXA0100015Skin · crackedDURING ROUTINE C-CHECK INSPECTION, A CRACK WAS DETECTED ON LEFT WING OUTER WING SKIN PANEL AT STATION XRS 533.3, STRINGER 62 END FITTING. REPAIR ACCOMPLISHED REMOVAL OF DAMAGED AREA. FABRICATION AND INSTALLATION AN REPAIR FILLER, DOUBLER AND TRIPLER IN ACCORSDR UPS01834883Fitting · crackedINSPECTION TYPE:C1, 3 STA 1325 LONG 21L T-1 DOOR FITTING IS CRACKED AT CUSP. REMOVED AND REPLACED FITTING IAW DWG 5888714, AND SRM 51-1-20D.SDR RRXA10844Skin · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO NR 2 ENGINE STUB WING SKIN AT STA. XFS 238, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW E.O. 01-006 WITH APPROVED 8110-3 DATESDR RRXA10843Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO 2 ENGINE STUB WING SKIN AT STA. XFS 238, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 51-1-20C AND E.O. 01-006 WITSDR RRXA10829Skin · damagedDURING A MAINTENANCE VISIT FOUND ROUTED OUT DAMAGE TO C-PIT DOOR MID LIGHTING HOLE AT RT MID C-PIT DOOR, BAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW E.O. 01-006 WITH APPROVED SDR RRXA010649Panel · damagedDURING A MAINTENANCE VISIT FOUND ELONGATED HOLES TO THE BOTTOM SLOT PANEL, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-4.SDR RRXA010648Fitting · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE UPPER I/B ATTACH FITTING ON THE L/H UPPER INSIDE TANK OF 506A O/B AT STA XRS 428, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATSDR RRXA010647Stringer · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CLIP ON STR #51 L/H UPPER INSIDE TANK OF 506A O/B BETWEEN STA XRS 428 LWR STRINGER CLIP BETWEEN LWR REAR SPAR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA ISDR RRXA010646Stringer · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CAN'T #54 STRINGER AT L/H UPPER INSIDE TANK OF 505B BETWEEN STA XRS 495-508, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PARSDR RRXA010645Stringer · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CAN'T #55 LOWER STRINGER ON THE L/H UPPER WING INSIDE TANK OF 505B O/B BETWEEN STA XRS 495 & 508, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 5SDR RRXA010644Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE ON INTERNAL SKIN AT TOP DE-ICER VENT HOLES AT STA 422.750 TO XFS 335.250, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. ----------CX----------
Back to Douglas DC-8-71F