Aircraft model · Fixed wing multi engine · Airplane · registry code 5170316

Manufacturer (registry)
GATES LEAR JET
Model
24E
Registry code
5170316
Registered
2 aircraft
Type
Fixed wing multi engine
Engines
2 · Turbo-jet
Seats
8
Weight class
12,500 to 19,999 lb
Cruise speed
182 mph
Certification
Type certificated
Data sheet
TCDSA10CE
Holder
Learjet Inc.

Model codes come from the FAA registry’s reference file. ADs are matched to them by model name and maker.

On this page

Aircraft by year built · 14

1971Registered nowDeregistered2026
Aircraft by the year they were built: 14 aircraft
19711
19768
19773
19891
19981

Airworthiness directives that may apply · 24

ADs whose products match this airframe model. Each AD’s applicability may narrow it by serial number, part number or configuration.

1975In forceSuperseded2026
ADs by the year they took effect: 24 ADs
19751
19782
19791
19802
19812
19831
19842
19851
19862
19881
19891
19921
19951
19991
20011
20053
20071
See all 24 ADs
Query with SQL
duckdb -csv -c "SELECT d.ad_number, d.status, d.subject, d.effective_date
  FROM 'https://openairdocs.org/data/latest/faa_directive.parquet' d
  WHERE d.ad_id IN (SELECT ad_id FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_directive.parquet' WHERE aircraft_model_code IN ('5170316'))
  ORDER BY coalesce(d.effective_date, d.publication_date, d.issue_date) DESC, d.ad_number DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Information bulletins that may apply · 2

Query with SQL
duckdb -csv -c "SELECT s.saib_number, any_value(s.title) AS title, max(s.issue_date) AS issue_date, any_value(s.status) AS status
  FROM 'https://openairdocs.org/data/latest/faa_saib.parquet' s
  WHERE s.saib_id IN (SELECT saib_id FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_saib.parquet' WHERE aircraft_model_code IN ('5170316'))
  GROUP BY s.saib_number ORDER BY issue_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Registered aircraft · 2

Query with SQL
duckdb -csv -c "SELECT n_number, serial_number, year_manufactured, status, registrant_name, registrant_city, registrant_state
  FROM 'https://openairdocs.org/data/latest/faa_aircraft_registration.parquet'
  WHERE aircraft_model_code IN ('5170316')
  ORDER BY n_number"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

NTSB investigations

No NTSB investigations matched to aircraft with this modelMatched through the registry by N-number, so foreign aircraft and some older cases aren’t counted.

FAA incident reports

No reports matched to aircraft of this modelMatched through the registry by N-number, so foreign aircraft and some older reports aren’t counted.

Service difficulty reports · 12

SDR HAEA201000214Capstan · contaminatedON FINAL AT 100' AGL PILOT REPORTS ELEVATOR CONTROL JAMMED. AT 25' AGL THE CREW REPORTED A LOUD POP AND THE ELEVATOR FUNCTION RETURNED TO NORMAL. UPON INVESTIGATING REPORT OF A LOCKED ELEVATOR CONTROL SYSTEM, MX INSPECTED THE ENTIRE ELEVATOR CONTROL SYSTEM. Apr 10, 2010 · N330TW · Lear 24E · Elevator StructureSDR HAEA20000206Skin · damagedLT TIP TANK DAMAGED AND DENTED ON AFT LOWER SURFACE. TIP TANK REMOVED AND AFT CONE REMOVED TO EVALUATE DAMAGE. DISCOVERED AFT CENTER BULKHEAD DEFORMED, INNER ATTACH DOUBLER DEFORMED AND LOWER SEAM RIVETS SHEARED. TIP TANK REQUIRES REPAIR FOR RETURN TO SERVIDec 12, 2008 · N330TW · Lear 24E · Wing, Plate/SkinSDR BIER200700001Spring · missingBRAKE ASSEMBLY SENT INTO SHOP FOR MISSING RETURN SPRING ASSY. UPON CONDUCTING REPAIR TO REPLACE THE MISSING RETURN SPRING ASSEMBLY, FOUND THAT THE SPACER TUBES (PN 5012941) WERE MISSING FROM THE REMAINING THREE RETURN SPRING ASSEMBLIES. BRAKE ASSY HAD BEEN PAug 29, 2006 · Lear 24E · Landing Gear Brake SystemSDR HAEA200400158Autopilot Sys · malfunctionedAIRCRAFT PITCHES DOWN WHEN AUTOPILOT IS ENGAGED (ALT HOLD). THE FLIGHT DIRECTOR DOES THE SAME THING , EVEN WITH THE AUTOPILOT TURNED OFF. REPAIRED SHOULDER PORT DRAIN CAN SYSTEM AND REMOVED FLIGHT DIRECTOR FOR REPAIR. INSTALLED FLIGHT DIRECTOR AFTER REPAIR. OPJul 20, 2004 · N330TW · Lear 24E · Autopilot SystemSDR 00120Uplock Switch · dirtyAIRCRAFT DEPARTED YIP FOR RWI SHORTLY AFTER TAKEOFF LT UNSAFE GEAR LIGHT ILLUMINATED, CREW CYCLED GEAR SEVERAL TIMES WHEN GEAR WAS FULLY EXTENDED GEAR LIGHT WOULD GO OUT. RETURN TO DEPARTURE AIRPORT, MAINTENANCE CLEANED AND LUBED LT MAIN GEAR UPLOCK SWITCH ANDNov 6, 2003 · N330TW · Lear 24E · Landing Gear Position and WarningSDR 00093Engine · flamed outAIRCRAFT CLIMBING FROM FL410 LT ENGINE FLAMEOUT, RELIGHT AT FL250, CLIMB BACK TO FL330 TO DESTINATION, WILL UPDATE REPORT AFTER MAINTENANCE. MAINTENANCE PERFORMED FLAMEOUT INSPECTION IAW MFG/ MM SEI-186 AND R & R P2 LINE. OPS CK GOOD.May 28, 2003 · N330TW · Lear 24E · Engine (Turbine/Turboprop)SDR 00085Line · inoperativePILOT REPORTED AFTER DEPARTURE FROM SHV HYDRULIC PRESSURE DROPPED TO 0 UPON GEAR RETRACTION AND FLAP RETRACTION, AIRCRAFT DIVERTED TO ADS STANDBY PUMP WAS USED TO EXTEND GEAR AND FLAPS FOR NORMAL LANDING. WILL UPDATE THIS REPORT AFTER MAINTENANCE. HYDRULIC (PRMar 4, 2003 · N330TW · Lear 24E · Hydraulic System, MainSDR 00080Transmitter · inoperativePILOT REPORTED AIRCRAFT WOULD NOT PRESSURIZE OUT OF 10,000 FT, ALSO COMS HAD STATIC, DIVERT INTO SDF FOR MAINTENANCE. WILL UPDATE REPORT AFTER MAINTENANCE. MAINTENANCE CLEANED SQUAT SWITCHES, JACKED AIRCRAFT AND PERFORMED OPERATIONAL CHECKS, PRESSURIZE CHECKEFeb 25, 2003 · N330TW · Lear 24E · Communications SystemSDR 2002F01027Line · crackedPILOT REPORTED AN UNSATISFACTORY INDICATION OF RT ENGINE ANTI-ICE SYSTEM. AFTER REMOVING ENGINE COWLING, ANTI-ICE VALVE BLEED AIR SUPPLY LINE CONNECTOR HOSE WAS FOUND TO BE RUPTURED AND COMPLETELY TORN FREE. ANTI-ICE VALVE BLEED AIR SUPPLY LINE HAD ALSO CRACKENov 13, 2002 · N207RG · Lear 24E · Engine Fuel DistributionSDR 2002F01026Line · crackedDURING IN-FLIGHT OPERATIONS THE PILOT REPORTED AN UNSAT INDICATION OF THE RT ENGINE ANTI-ICE SYS. AFTER REMOVING THE COWLING, THE ANTI-ICE VALVE BLEED AIR SUPPLY LINE CONNECTOR HOSE WAS FOUND TO BE RUPTURED AND COMPLETELY TORN FREE. THE ANTI-ICE VALVE BLEED AINov 13, 2002 · N207RG · Lear 24E · Engine Bleed Air SystemSDR 00060Seal · failedAIRCRAFT DEPARTED, ON THIRD LEG OF THE DAY, OIL PRESSURE DROPPED AND LOW OIL PRESSURE LIGHT ILLUMINATED. AIRCRAFT DIVERTED, NO EMERGENCY DECLARED. MAINTENANCE WAS SENT, REMOVED AND REPLACED AXIS GEAR SEAL. AIRCRAFT SERVICED AND OPS CHECK GOOD, RETURNED AIRNov 6, 2002 · N330TW · Lear 24E · Turbine Engine Oil SystemSDR 00023Circuit Breaker · weakPILOT REPORTED NO NORMAL PITCH TRIM AFTER DEPARTURE, USED EMERGENCY PITCH TRIM TO RETURN TO DEPARTURE AIRPORT. MAINTENANCE FOUND WEAK CIRCUIT BREAKER. REMOVED AND REPLACED CIRCUIT BREAKER, OP'S CHECK GOOD AT THIS TIME.Apr 28, 2002 · N330TW · Lear 24E · Stabilizer Control System
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE aircraft_model_key = '24E'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

STCs that may be installed · 60

Approved for this model: the STC’s model list names it on its data sheet, or a series that includes it. The registry doesn’t record which STCs an aircraft has.

See all 60 STCs
Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
  FROM (
    SELECT stc_number, min(matched_model) AS matched_model
    FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
    WHERE aircraft_model_code IN ('5170316')
    GROUP BY stc_number
  ) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
  ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.