Learjet 24D

STCs approved for this model · 81

Current certificates first.

Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date
  FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s
  WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE model_key = '24D')
  ORDER BY s.status = 'Current' DESC, s.stc_number"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

STC SA01213CHInstall air ambulance conversion in accordance with Spectrum Aeromed Inc. Drawings as listed on AML SA01213CH, or later FAA approved revision.Spectrum Aeromed LLC dba Spectrum AeromedSTC SA01452CHInstallation of an air ambulance conversion kit.Med-Pac Inc.STC SA1170CEStretcher installation in cabin area.Med-Flite of Midamerica IncSTC SA1170GLExcept Model 55: Install Egan Aviation air ambulance stretcher P/N 125 using installation kit P/N 803, inverter/pump kit No. 808, 809, or 810. For Model 55, install air ambulance stretcher P/N 125 using installation kit P/N 804, medical oxygen system kit P/N 807, inverter/pump kit No. 808, 809, or810.Paul/ Lanna Egan LLCSTC SA1639GLInstall air ambulance conversion.Spectrum Aeromed LLC dba Spectrum AeromedSTC SA1669SWInstallation of engine thrust reversersThe NORDAM Group LLCSTC SA1670SWInstallation of engine thrust reversers.The NORDAM Group LLCSTC SA1RMInstallation of cargo restraint systemAvcon Industries IncSTC SA2304SWReplacement of plunger type landing gear squat switch with rotary type switch.Sierra Industries, IncSTC SA232NWInstallation of the Mark II performance system, including recontoured wind leading edge, recontoured flap leading edge, wind vortex generator removal, installation of wing stall strips and other minor refinements in accordance with Avcon Master Drawing List No. 1082 dated November 16, 2010, or later FAA approved revision. 350 Knot Vmo authorized if equipped in accordance with Avcon Master Drawing List No. 1082 dated November 16, 2010, or later FAA approved revision. An FAA approved airplane flight manual supplement is required for each model.Avcon Industries IncSTC SA2622NMInstallation of Precise Flight Pulselite Control Unit in landing/taxi system. (767-200 B17) (DHC-8 101)Precise Flight Inc.STC SA2661SWInstallation of Ray Model 7507A battery monitoring systemZee Company, IncSTC SA2726SWInstallation of 6-pole rotary squat switches.Sierra Industries, IncSTC SA2788SWInstallation of tail-stringer antenna housing.Sted-Mac CoSTC SA2876WEInstallation of vertical tail floodlights on the horizontal stabilizer.DeVore Aviation Corporation of America, a New Mexico CorporationSTC SA30GLInstallation of electronic engine synchronizer system.Ontic Engineering and Manufacturing Inc.STC SA3249WEInstallation of dual Collins ADF Systems.Learjet IncSTC SA3264WEInstallation of Global GNS-500A VLF navigation system.Learjet IncSTC SA3328WEInstallation of flight data recorder Sundstrand Model FA542.Learjet IncSTC SA3899WEInstallation of Collins F1S-84 Flight Instrument System.Learjet IncSTC SA4059NMInstallation of emergency medical system.Milam International IncSTC SA4060NMInstallation of emergency medical system.Mayo Aviation IncSTC SA4062SWInstallation of GNS 500A Global Navigation SystemAssociated Air Center, Inc. - c/o CT Corporation SystemSTC SA412CEInstallation of Woodward Electronic Engine synchronizer system.Ontic Engineering and Manufacturing Inc.STC SA4218WEInstallation of Radio Corporation of America Primus-300SL Color Weather Radar System.Learjet IncSTC SA4403NMInstallation of third attitude indicator that meets the requirements of FAR 121.305(j).Learjet IncSTC SA4918SWInstallation of windshield defog system.Jet East, IncSTC SA4999NMInstallation of lifeport patient loading and support system.LifePort LLCSTC SA841NWInstallation of the Mark II performance system, including recontoured flap leading edge, wing vortex generator removal, installation of wing stall strips and other minor refinements in accordance with Avcon Master Drawing List No. 1085 dated November 16, 2010, or later FAA approved revision. 350 Knot Vmo authorized if equipped in accordance with Avcon Master Drawing No. 1085 dated November 16, 2010, or later FAA approved revision. An FAA approved Airplane Flight Manual Supplement is required for each model.Avcon Industries IncSTC SA944NWInstallation of the XR Drag Reduction SystemAvcon Industries IncSTC SA996EAInstallation of Shaw Aero fuel filler cap P/Ns 457-2, -266, -370, 431, -9R, -125, -1251.Parker Hannifin Fluid Systems DivisionSTC SP00582NYInstallation of Prop-Guard Polyurethane Protective Tape on the leading edge of metal propellers.McFarlane Aviation, Inc.STC SP362NWInstallation of Pacific Propeller, Inc. chafing ring PP17010 in accordance with Pacific Propeller, Inc. FAA Sealed Drawing List 76005, dated September 27, 1976, or later FAA Sealed Revision thereto.Pacific Propeller International LLCSTC SP8715SWInstallation of a 'R S W' blade thrust bearing assembly in all D-shank blades of counterweight type propellers. (2D 30) (23D 40) (12D 40) (22D 40) (3D 450) (24D 50)Schweis Robert WSTC ST00016WIInstallation of Electric Floorboard HeatersLearjet IncSTC ST00098IBIntroduction of ADS-B OutSTC Twenty One LimitedSTC ST00361DEInstallation of Puritan Bennett or B/E Aerospace Sweep on 2000 or Zodiac Intertechnique EROS crew oxygen mask.West Star AviationSTC ST00462LAModification of the engine exhaust system.Rooke Corporation dba Aviation EquipmentSTC ST00673WI-DModification of Collins VHF-22A/VHF-22B VHF COMM Receiver Transmitter with CTL-22 Control Pro Line II System Installation to a Collins VHF-22C/VHF-22D VHF COMM Receiver Transmitter with CTL-22C Control 8.33 kHz Pro Line II System installation.Rockwell Collins IncSTC ST00738WIIncreased service life. Data required.Phoenix Air Group Inc.STC ST00814WILanding Gear Life Extension.Phoenix Air Group Inc.STC ST00835DEInstallation of Automatic Dependent Surveillance - Broadcast (ADS-B) Out and In functionality using the Garmin GTX 335R and GTX 345R Transponders plus qualified position sensorPeregrineSTC ST01138DEInstallation of MidContinent MD23 standby altimeter and/or attitude indicatorsButler National CorporationSTC ST01142WI-DModification of a single or dual Collins TDR-94 or TDR-94D Mode S Transponder System installation with CTL-92 control head to a Flight ID capable Collins TDR-94 or TDR-94D Mode S Transponder System installation with CTL-92E control head.Rockwell Collins IncSTC ST01195WIInstallation of Rosemount Pitot/Static Probes, altimeters, and associated equipment in Learjet 20 series aircraft to obtain Reduced Vertical Separation Minimum approval.Avcon Industries IncSTC ST01271WIInstallation of IS&S Air Data Computer System Update with Rosemount Static Probes and associated equipment in Learjet series aircraft to obtain Reduced Vertical Separation Minimum approval.Global Aviation TechnologiesSTC ST01305WI-DModification of a Collins ALT-50A or ALT-55B Radio Altimeter system installation to a Collins ALT-1000 or ALT-4000 Radio Altimeter system installation in accordance with Collins Drawing Index as listed on AML No. ST01305WI-D, Revision -, or later FAA approved revision.Rockwell Collins IncSTC ST01307WI-DModification of a Collins TVI-920/TVI-920D Vertical Speed/TCAS Indicator installationRockwell Collins IncSTC ST01733WIInstallation of the Quiet Lear Hushkit or Avcon Noise SuppressorButler National CorporationSTC ST01734WIInstallation of an Emergency Pneumatic Reservoir Assembly, EAS P/N 1260001-02EAS Corporation
Back to Learjet 24D