What was found
ON LANDING STBY PROBE HEAT, PILOTS RIGHT ECAM DISPLAY, PITCH TRIM NR 2, YAW DAMP NR 2, & ATS NR 2 ALL FAILED AT ONCE. ALSO IRU'S WENT TO INDEPENDENT OPS. ENG NR 2 N2 CB POPPED. FACT 25APR03 19:09 RNO U C/W E.A. 6-2400-70271 THE R/H ECAM WIRE WAS CAPPED AND TAPPED AND WILL BE DEFERRED UNDER A SEPARATE WRI. ON INSPECTION OF WIRE BUNDLE, THE DAMAGED AREA WAS NOT IN CONTACT WITH ANY STUCTURE/CHAFFING POINT BUT WAS NEAR TWO VERY TIGHT TYWRAPS. ALSO LOCATED IN A BEND OF THE WIRE BUNDLE. THE DAMAGED WIRES WERE ON THE OUTSIDE OF THE WIRE BUNDLE AND TURN RADIUS.