What was found
FLUSH REPAIR ON L/E OF NR 5 SLAT DOES NOT COMPLY WITH SRM. REMOVED AND REPLACED REPAIR ON NR 5 L/E SLAT IAW SRM 57-43-01, FIG 201. FABRICATED REPAIR FILLER, HEAT TREATED TO T6 ON MAE TRAVELER T7/696092. FABRICATED DOUBLER AND SPLICES, HEAT TREATED ON MAE TRAVELERS T7/696091, T7/696093 AND T7/696094. TREATED AND PRIMED REPAIR PARTS IAW SRM 51-10-02. THIS IS A MAJOR REPAIR BASED ON GMM 6-2-100 CRITERIA.