What was found
RT W/W PRESSURE DECK FUEL SHROUD MOUNTING FLANGE IS CORRODED AT BS 890 TO 888, RBL 63", WL 200. REMOVED CORROSION SRM 51-10-1 PG 15,15. ORIG THICKNESS IS .100", REMAINING "T" IS .061, LOSS OF .039' REF SRM 53-10-1 FIG 1. MEASURED USING TOOL AAR 18172, DUE DATE OF 10/15/08. NDT INSPECTION USING HFEC IAW 727 NDT MANUAL PART 6 51-40-00 FIG 23 TOOL NR IN22-0044 DUE DATE OF5/21/08. NO DEFECTS NOTED. FLAP PEENED BLENDED AREA SOPM 20-10-30 FIG 19. TREATED AND PRIMED AREA SRM 51-10-2 PG 7. APPLIED ONE COAT OF BMS3-23. THIS REPAIR IS WITHIN LIMITS OF FED EX EA 7-5310-113133 LEVEL 1 CORROSION.