What was found
ACCOMPLISHED AN INITIAL BHEC INSPECTION OF THE NR 2 MCD SPOOL BRACKET BOLT BORES IAW NTSPM 06-10-01.003 AND EA 8-5230-117632, STEP C. ALL FOUR BORE HOLES (A, B, C AND D) HAVE CRACK/CORROSION INDICATIONS. REAMED BOLT BORES IAW SRM 53-50-00 VOL I FIG 17 PG 81 AND ACCOMPLISHED BHEC OF BOLT BORES IAW NTSPM 06-10-01.003 AND FOUND CRACK INDICATION REMAINING IN BORE HOLE D (LWR JAMB SUPPORT FITTING ONLY). REMOVED SUPPORT FITTING, LOCATED AND DRILLED NEW FITTING AND INSTALLED IAW SRM 53-50-00 VOL I FIG 17 PG 81 AND 51-33-01 VOL II PG 1. FABRICATED REPAIR BUSHINGS AND INSTALLED IAW SRM 53-50-00 VOL I FIG 17 PG 81.