What was found
ACCOMPLISHED AN INITIAL BHEC INSPECTION OF THE NR 6 MCD SPOOL BRACKET BOLT BORES IAW NTSPM 06-10-01.003 AND EA 8-5230-117632, STEP C. BORE HOLES B, C, AND D HAVE CRACK/CORROSION INDICATIONS. REAMED 4 EA. BOLT BORES, ACCOMPLISHED BHEC, FABERICATED AND INSTALLED 9 EA. REPAIR BUSHINGS IAW DC/MD-30 SRM 53-50-00 VOL I, FIG-17, PG-81 AND NTSPM 06-10-81.003.