What was found
FWD LOWER CARGO PIT BILGE FRAME J-CHANNEL IS CORRODED AT BS 824 S51R. REMOVED CORROSION IAW SRM 51-21-01; VOL II; PG 28. ORIGINAL THICKNESS .071 IAW SRM 53-13-01; VOL III; FIG 8A AND SRM 51-10-02; VOL II. REMAINING THICKNESS .069; FOUND TO BE WITHIN LIMITS IAW SRM 53-00-01; VOL II; FIG 1A; PG 4B. UT GAUGE NR T8224Q. ALODINED AND PRIMED IN REF TO SRM 51-21-01; VOL II; PGS 21 AND 24. APPLIED TOP COAT IN REF TO SRM 51-21-02; VOL II; PG 1. MINOR REPAIR.