What was found
DURING ACCOMPLISHMENT OF AD 96-19-05, ULTRASONIC INSPECTION OF MAIN LANDING GEAR YOKES, THE FOLLOWING DEFECT INDICATIONS WERE NOTED. THE INBOARD SIDE OF THE RIGHT MLG YOKE DISPLAYED TWO DEFECT INDICATIONS. NR 1 WAS A .125 INCH CRACK INDICATION, NR 2 WAS A .250 INCH CRACK INDICATION. BOTH WERE LOCATED BELOW THE FILL VALVE/RETAINING PIN HOLE. ADDITIONAL INDICATIONS WERE FOUND IN THE NLG AND LEFT MLG YOKES. (X)