What was found
FLOORBEAM STA 947, LBL 22 THRU RBL 18 HAS EXCESS MATERIAL REMOVED. ACCOMPLISHED SPLICE REPAIR. MAJOR REPAIR ACCOMPLISHED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FLOORBEAM STA 947, LBL 22 THRU RBL 18 HAS EXCESS MATERIAL REMOVED. ACCOMPLISHED SPLICE REPAIR. MAJOR REPAIR ACCOMPLISHED.