As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING PHASE INSPECTION FOUND THE LT IB AFT FLAP TRACK ATTACH BOLT CHAFED 3 LAYERS OF CARBON FIBER INTO THE FUSELAGE. FOUND FLAP MISRIGGED AND TOP 3 FLAP TRACK FASTENERS WORKING. RECOMMEND ADDITIONAL ATTENTION TO FLAP RIGGING AND ALL ATTACHING HARDWARE DURING PHASE INSPECTIONS. (K)