What was found
WHEN REMOVING PROPELLER FOR RESEAL, FOUND 2 MOUNTING NUTS CRACKED. THE PROP HAS 93.5 HRS SINCE INSTALLATION. THE PROPELLER PREVIOUSLY HAD THE BLADES REPLACED DUE TO PROP STRIKE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WHEN REMOVING PROPELLER FOR RESEAL, FOUND 2 MOUNTING NUTS CRACKED. THE PROP HAS 93.5 HRS SINCE INSTALLATION. THE PROPELLER PREVIOUSLY HAD THE BLADES REPLACED DUE TO PROP STRIKE.