As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DENT DAMAGE WAS DISCOVERED ON THE RH ENGINE DECK PANEL (PN: B533K3339-213) THROUGH TO THE RH ENGINE MOUNT INBOARD SUPPORT BEAM (PN: B533K3316-207). AN APPROVED REPAIR PROCEDURE WAS COMPLIED WITH PER AIRBUS REPAIR DESIGN APPROVAL SHEET RDAS-BK117-53-2024-3426, ISSUE A DATED 01 NOV 2024, WHICH CONTAINS A DETAILED DESCRIPTION OF THE DAMAGE AND REPAIR INSTRUCTION.