What was found
AFTER PERFORMED INSP, FOR CONDITION AND OVERHEAT TO THE TERMINAL BLOCK RELAY, RELAY BASE AND ASSOCIATED WIRING IN THE P320 PANEL IAW RECOMMENDATION INCLUDED IN MULTI-OPERATOR MESSAGE NR MOM-13-0583-01B, PANEL P320 WAS FOUND WITH SEVERAL CLAMPS OF ITS BUNDLE WITH BURNED MARKS. DISABLE SOME CIRCUIT BREAKERS TO REDUCE THE LOADS TO THE CARGO AREA LIGHTNING CIRCUIT IAW RECOMMENDATION. REPLACED FOLLOWING PARTS: RELAY PN 40-617-1329, TERMINAL BLOCK, PN 001766-108-02, SOCKET PN RSE500413 AND ASSOCIATED HARDWARE. ALL WIRE BUNDLES WERE CLEANED. PERFORMED OPS TEST OF MAIN DECK CARGO LIGHTS IAW AMM 33-35-00. NO ADDITIONAL DISCREPANCIES NOTED.