Service difficulty report · Unknown · Emb EMB145LR

Difficulty date
January 16, 2023
Submitted
January 31, 2023
Operation
Air carrier
Aircraft
N245JX
Make and model
Emb EMB145LR
Aircraft serial
145355
Aircraft time
35,354 hours, 29,611 cycles
Part
Unknown
Condition
Vibration
Stage of operation
CL
How discovered
O
Nature of condition
O
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CREW REPORTED-ONCE WE LEVELED OFF AT 15,000 FT WE DECREASED POWER TO MAINTAIN A CERTAIN SPEED. AS SOON AS WE DECREASED OUT POWER A LOUD AND STRONG VIBRATION COULD BE FELT THROUGHOUT THE AIRCRAFT. WE ASSUMED IT WAS THE PACKS DUE TO SOME PROBLEMS LIKE PACK OVERHEAT BUT NOT ANYTHING BIG. WE RECEIVED NO WARNINGS OR CAUTIONS ON THE EICAS. THE VIBRATION AND NOISE WOULD INCREASE WITH WHEN POWER WAS ADDED AND DECREASE WHEN POWER WAS DECREASED. WE WORKED THROUGH WHAT WE THOUGHT IT WAS AND RAN THE ASSOCIATED CHECKLIST FOR IT AND NOTHING CHANGED. CORR ACTION- MX PERFORMED A GVI OF EXTERIOR NO DEFECTS NOTED. JSX DECIDED T FERRY AIRCRAFT TO MRO FOR FURTHER INVESTIGATION. MRO MX PERFORMED A FLAP ZERO RIG CHECK NO DEFECTS AND PERFORMED A LANDING GEAR DOOR GAP CHECK LH MLG DOOR REQUIRED ADJUSTMENT AIRCRAFT RTS'D.