What was found
REPLACED APU BAY FIRELOOPS. SECURED AN EXHUAST DUCT CLAMP. R/R FIREWALL SENSING ELEMENT – R/R BOTH FIREWALL SENSING ELEMENT AS PER BD-100 AMM 26-13-000-801. R/R EDUCTOR SENSING ELEMENT – R/R BOTH EDUCTOR SENSING ELEMENT AS PER BD-100 AMM 26-13-01-000-801. R/R APU FIRE BOTTLE – R/R APU FIRE BOTTLE AS PER BD-100 AMM 26-21-01. R/R APU FIRE BOTTLE SQUIB #3 – R/R APU BOTTLE SQUIB #3 AS PER BD-100 AMM 26-21-05. INSPECTION OF THE APU – C/W WITH THE INSPECTION OF THE APU IRW WITH BD-100 AMM 49-16-05. QUANTITY CHECK OF THE OIL SUPPLY IN THE APU – C/W APU OIL QUANTITY CHECK AS REQUIRED. LEVEL IS SATISFACTORY. ALL WORK PERFORMED IRW BD-100 AMM 12-14-09.